Title Page
Job Information
-
Select date
-
Project Name
-
Project Number
-
Project Location
-
Project Manager
-
Phone Number
-
Foreman
-
Phone Number
-
Safety Representative
-
Phone Number
-
General Contractor/Client
-
GC Superintendent
-
GC Superintendent Phone Number
Emergency Procedures (Contact Safety Manager for nearest Clinic/Hospital locations)
-
Clinic Name and Location
-
Nearest Hospital Name and Location
Task Description and Work Steps
- Give a brief description of the task at hand. Note: Any changes in task must be noted prior to commencing, and will be discussed before the task is performed.
-
Task Description
-
Work Steps for This Task
-
Hazards Associated with Work Steps
-
How Can the Hazard be Eliminated/Controlled?
Tools and Equipment
-
Hand Tools
- Spud wrench
- Sliver Bar
- Burk Bar
- Bull Pin/Drift Pin
- Sledgehammer(Beater)
- Hamer Wrench
- Steel Wedge
- Other
- Tool Inspection Current
-
What Other Hand Tools
-
What is the color code?
-
Power Tools
- Power drill
- Screw gun
- Rotary hammer
- Shear Wrench Gun (LeJeune Gun)
- Electrical Cords
- Vacuum
- Other
- Power Tool Inspection Current
-
What Other Power Tools
-
What is the color code?
-
Equipment
- Crane
- Forklift
- Scissor Lift
- Boom lift
- Other
-
Type/Make/Model
-
Type/Make/Model
-
Type/Make/Model
-
Type/Make/Model
-
Other Equipment: Type/Make/Model
-
Lifting Equipment
- Wire Rope Sling
- Synthetic Web Sling
- Shackles
- Cable Clips
- Turnbuckles
- Other
-
Type
Welding / Cutting
-
Welding
- Welding Machine (turn machine completely off before re-fueling)
- Welding Lead (cable free from repair within 10 ft. of electrode holder)
- Firewatch Required (Remove all flammables from the immediate work area to prevent fires)
-
Cutting
- Oxygen
- Acetylene
- Propylene
- Firewatch Required (Remove all flammables from the immediate work area to prevent fires)
Permits and Inspections
-
Permits
- Hot-Work Permit
- Confined Space Permit
- Critical Lift
- Lift Permit
PPE, Fall Protection, Access, Miscellaneous
-
PPE
- Safety Glasses
- Hard hat
- Gloves
- Face Shield
- Hearing Protection
- High Visibility Shirt/Vest
- Foot Protection
- Face covering
-
Fall Protection
- Full Body Harness
- Beam Clamp
- Cable Choker(Cheater)
- 6’ Shock Absorbing Double Lanyard
- Dual Retractable Lanyard
- Self-Retractive SRL (Yo-Yo)
- Engineered Horizontal Lifeline
- Adequate Anchorage (Capable of Withstanding 5000 lbs.)
- Fall protection being used properly
- Employees protected from a fall 6’ above a lower level
-
Access
- Feasible Access to the Jobsite
- Scaffold (Properly Inspected by Competent Person)
- Ladder (Secured / Inspected)
- Scissor Lift (Qualified Operator)
- Aerial Lift (Qualified Operator)
- Personnel Basket (Inspected and Approved)
- Confined Space
PROJECT PERSONNEL ACKNOWLEDGEMENT. By signing below, I acknowledge that I am trained and fit to accomplish the tasks assigned to me by my employer. I will not proceed with any other tasks without properly completing additional Job Hazard Analysis (JHA). I have the right to stop work in order to maintain the highest level of safety on this project. (All affected Personnel sign after job briefing.)
- Attendee
-
Add signature