Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Project Reference
-
Bedroom / Flat Number
-
Is a representative of the client in attendance for inspection?
-
Completed on Time?
-
Does the finish match the specified interior design schedule?
-
Is general standard of finish ok?
-
Have all joints in vinyl flooring been welded satisfactorily?
-
100mm pre-formed coming used for flooring?
-
Tiling completed to an acceptable finish?
-
Operation of WHB ok? Check drainage, water temps etc
-
Photograph of tiling to WHB (inc feature tile)
-
Check operation of WC.
-
Is height of floor to top of WC pan minimum 450mm?
-
Photograph of new WC
-
Does Shower unit operate correctly?
-
Are flow restrictors required?
-
Photograph of shower area
-
Does water drain away at a sufficient rate? Pump working correctly (including overrun, where required)?
-
Operation of ceiling light OK?
-
Operation of light over mirror OK?
-
Check that light cord is 450mm in length
-
Photograph of mirror and light over WHB
-
Extractor fan operating correctly? Check sound levels, operation times etc
-
Does the LST radiator work correctly (where installed)? Is the TRV accessible?
-
All grab rails installed? Drop down WC including toilet roll holder etc
-
Have electrical test certificates been received?
-
Refurbishment completed satisfactorily for handover to client? Including builders clean etc
-
Inspection completed by:
-
Signature: