Information
-
1- Contractor 2 - Address
-
Location
-
Prepared by
-
Document No.
-
Conducted on
Enable Proactive service lead-in Audit
-
Premises type
- Residential SDU
- Residential MDU
- Business SDU
- Business MDU
-
Lead-in used
- 50mm conduit to comms room
- 20mm duct
- Ruggedised micro duct
-
Lead-in installed to the FAP(Fibre access point) at the boundary?<br><br>(This must be installed beside the FAP in order to connect the tubes in the future)
-
Lead-in installed at the correct depth?<br>- 450mm standard<br>- 300mm on property<br>- 100mm below a hard surface
-
Has the duct/ruggedised micro duct been fitted correctly at the premises<br>- fitted inside white conduit and secured to the premises external wall<br>- micro duct left above ground if the premises is yet to be built<br>- 50mm duct fitted to the comms room
-
Have protective caps / end caps been used to seal the duct/ruggedised micro duct?<br>Select N/A if the property has since been connected
-
Trench closed and area reinstated?
-
Other comments