Information

  • 1- Contractor 2 - Address

  • Location
  • Prepared by

  • Document No.

  • Conducted on

Enable Proactive service lead-in Audit

  • Premises type

  • Lead-in used

  • Lead-in installed to the FAP(Fibre access point) at the boundary?<br><br>(This must be installed beside the FAP in order to connect the tubes in the future)

  • Lead-in installed at the correct depth?<br>- 450mm standard<br>- 300mm on property<br>- 100mm below a hard surface

  • Has the duct/ruggedised micro duct been fitted correctly at the premises<br>- fitted inside white conduit and secured to the premises external wall<br>- micro duct left above ground if the premises is yet to be built<br>- 50mm duct fitted to the comms room

  • Have protective caps / end caps been used to seal the duct/ruggedised micro duct?<br>Select N/A if the property has since been connected

  • Trench closed and area reinstated?

  • Other comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.