Site conducted
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
System administration
-
Was the maintenance visit carried out on time i.e within contractual/ regulatory requirements?
-
Was a corrective/preventative maintenance report completed and signed by the customer?
-
Has any follow up action been clearly identified?
-
Is a follow up still outstanding?
On site Audit - Witnessed maintenance visit
-
Did the engineer show their ID card?
-
Was the system placed on test?
-
Did the engineer advise the customer that the system would be offline during the maintenance visit?
-
Was it made clear that PA signalling would be disabled during the visit
-
Did the engineer establish from the customer if there had been any problems?
-
If problems were advised or found, were they investigated and corrected competently?
-
Was the panel log examined for unusual occurrences?
-
Was there a comprehensive visual inspection including cleaning where necessary?
-
We're all detectors including contacts and vibration sensors dynamically tested back to the panel?
-
We're power supplies and batteries tested?
-
Was the SAB tested including holdoff self activating?
-
Was the specification checked against the installation as fitted?
-
Were any disconnections queried with the customer and restored if given authority?
-
Was the system fully tested to the ARC including confirmed alarm signals?
-
Were ARC signals confirmed and taken off test?
-
Did the engineer have the correct tools to carry out all tests and repairs?
-
Was the engineers Digital multi meter within calibration?
-
Was the site history card completed with the details of the visit?
-
Was the engineer familiar with the standards and codes of practice applicable to the installation?
-
Did the engineer enquirer about weather additional training in the use of the system was required by the customer?
-
Was the system left operational with the correct time and date showing on the keypad?
-
Did the engineer show courtesy and respect during the visit?
Subsequent on site audit- Engineer not present
-
Had the system been placed on test at the ARC?
-
Were signals sent to the ARC and were they recorded and the corrective/preventative maintenance report?
-
Does the specification reflect the system as fitted? Were variations identified so that the specification amendment can be made?
-
Were any disconnections identified and queried with the customer?
-
Were any disconnections made and recorded? Were they agreed by the customer?
-
Have any changes to the premises layout or construction been noted? Did they affect the integrity of the system and were they noted on the corrective/preventative maintenance report?
-
Was the historical record completed with details of the visit?
-
If the customer was present during the engineers maintenance visit were appropriate enquiries made about the system and/or fault being investigated?
-
If the visit was required because of a fault was it corrected to the customers satisfaction?
-
If the fault was caused by customer error did the engineer give clear and adequate instruction on how to avoid the same mistake?
-
Did the engineer explain the police policy on repetitive false alarms and the possibility of response being downgraded?
-
Does the corrective/preventative maintenance report give an adequate description of faults found remedial action taken and any other information needed for future reference?
-
Was the system left fully operational including remote monitoring?
-
Was the customer satisfied with the way the maintenance visit or fault finding had been conducted?
Name of Auditor
-
Add signature
-
Add signature
-
Select date
-
Follow up action required