Overview Page
-
Audit Number
-
Site conducted
-
Conducted on
-
Auditor Name
-
Auditor Signature
-
Engineer Name
-
Engineer Signature
-
Type of Job
-
Sub Type
Vehicle and Equipment Inspection
-
Does the Engineer have a valid ID card?
VAN/CAR CHECKLIST
-
Van/Car Registration
-
Are the vehicle manuals and service booked within the vehicle?
-
General Cleanness of vehicle
-
Paperwork storage ok?
-
Adequate Van/Car stock storage?
-
Attach stock list to this audit
WORKING EQUIPMENT
-
Assorted Sundries (Cable, Cable Ties, Tape etc)
-
Mains Proving Unit and Leads
-
CALIBRATION DUE DATE
-
Laptop
-
CHARGER PAT TEST DUE DATE
-
Ipad
-
Battery Tester
-
CALIBRATION DUE DATE
-
Mutli Meter
-
CALIBRATION DUE DATE
-
Sound Level Meter
-
CALIBRATION DUE DATE
-
Cordless Drill
-
CHARGER PAT TEST DUE DATE
-
Assorted Drill Bits
-
Assorted Screwdrivers
-
Other Assorted Hand Tools
-
Step Ladders
-
LATEST INSPECTION DATE
-
Combinational Ladders
-
LATEST INSPECTION DATE
-
Triple Extendable Ladders
-
LATEST INSPECTION DATE
-
Solo Smoke testing Kit
-
CHARGER PAT TEST DUE DATE
HEALTH & SAFETY
-
First Aid Kit
-
Safety Footwear
-
Dusk Mask FFP3
-
Ear Defenders
-
Ear Plugs
-
Eye Protection
-
Hard Hat
-
High Visibility Vest
-
Knee Pads
-
Gloves 3 Cut Rating
-
Tool Belt
-
Ladder Stop
-
Dust Sheet
-
Generic RAMS / Dynamic Risk Assessment
Site Works Inspection
Start Of Works
-
1. Did the engineer have/use appropriate documentation:
-
-Site Visit / PM Docket
-
-Site Record
-
-Specification
-
-Commission Cause and Effects Matrix
-
-Design Certificate
-
2. Did the engineer show / hold their ID card?
-
3. Did the engineer:
-
- Inform the customer that the system was being worked on & that the audible alarm may be tested?
-
- Make enquiries about alterations, usage or problems?
-
- Make sure the customer was familiar with the operation of system?
-
- Make sure the customer is aware that the system will be part or fully disabled?
-
- Informed the manager on site of the work to be completed and has filled out any Permit to Works required?
-
- Was training offered if needed?
-
4. Was the installation, location & siting of all equipment checked against the record/specification?
-
5. Did the system get put on to test with the ARC?
Service
-
Was the satisfactory operation of all devices within the schedule checked?
-
With Multi-detectors, have all elements been tested?
-
Were the physical fixings checked?
-
Were all visual inspections cheked?
-
Have all/part of the sounders checked?
-
Were the mains & standby power supplies checked?
-
Was the control panel checked for - Fire and fault signals from the circuit wiring?
-
Have all LED and displays been checked?
-
Were the physical fixings checked?
-
Were all checks completed required from the relevant British Standard?
-
Refer to Audit 1141 for further audit details
-
Have all signals been recived at the ARC?
-
Has the system been confirmed as fully operational?
Installation/Commission
-
Has the engineer took a download of the system configuration before commencing work?
-
Ensure that they have all relevant tools/health and safety equipment?
-
Got all relevant paperwork for the work to be completed?
-
Documented any existing faults and disablements if applicable?
-
Has the installation work been carried out to the relevant British Standards?
-
Has the system been updated with the new configuation?
-
Has all the new installation been tested and is fully working?
-
Has the system been put back to normal working condition or as it back as it was before work began?
-
Was the engineer using appropriate test equipment?
-
Was it calibrated where required?
Finish Works
-
Has the log book been completed and updated the asset list?
-
Have all relevant paperwork and documents been completed?
-
Are all times & dates entered accuratley on the documentation?
-
Has all documents been signed by the engineer & by the customer?
-
If any temporary disconnections or disablments have been made, have they been aurthorised by the customer?
-
Have arrangements been made for a follow up visit?
Corrective Maintenance
-
Did the engineer gather all relevant information to help in finding the fault?
-
Were the appropriate techniques used in finding the fault in a reasonable time, and was the customer informed of the findings?
-
Were the repairs properly carried out
Comments
-
Comments