General Requirment

  • Is there a contract with a consulting office approved by the National Center for Environmental Compliance?

  • Has the environmental permit for construction been obtained from the National Center for the Control of Environmental Compliance?

  • Have the requirements attached to the environmental permit issued by the National Center for Monitoring Environmental Compliance been complied with?

  • Was the Environmental Impact Assessment Study(EIA study )adhered to?

  • Has the environmental management plan been adhered to?

  • Has a hydrological study been done for the project?

  • Is there an environmental record for the project?

Waste Management

  • Is there an approved waste management procedure?

  • Is non-hazardous solid waste disposed of?

  • Is non-hazardous liquid waste disposed of?

  • Are hazardous solid and liquid waste disposed of?

  • Are there certificates for transport and waste disposal companies approved by the National Waste Management Center?

Project workers safety precautions

  • Is there an approved procedure for implementing employee safety precautions?

  • Is it obligatory to wear and use protective equipment and clothing?

  • Is there a fire extinguishing system?

  • Is there a first aid kit?

Air Quality: Measurement of gases

  • Was the percentage of ozone gas O3 measured?

  • Was the proportion of hydrogen sulfide gas H2S measured?

  • Was the carbon monoxide (CO) gas measured?

  • Was VOCs measured?

  • Was sulfur dioxide, SO2, measured?

  • Was the ratio of nitrogen dioxide, NO2, measured?

Air Quality:Noise Measurement

  • Were noise measurements taken inside and outside the work environment?

  • Have the times, controls and requirements for monitoring noise levels issued by the National Center been adhered to?

  • Were the permissible limits for measuring the noise ratio from the National Center adhered to?

  • Have the monitoring data been kept for the period specified in Article (8) of the Executive Regulations of the National Center?

Air Quality: General

  • Was the percentage of suspended dust (PM10) and (PM2.5) measured?

  • Was ambient air quality measured in 24 hours?

  • Are the controls to limit volatile matter adhered to?

  • Have Volatile Matter Burning Standards been adhere to?

  • Are emission standards for fixed sources not to be exceeded?

  • Is regular maintenance of machinery, equipment and emission control systems adhered to?

  • Have the plans, procedures and measures issued by the National Center regarding the implementation and work of plans to reduce emissions been adhered to?

Environmental impacts of the project

  • Surface, ground, and marine water quality: Have test wells(B.H) been made at the project site?

  • Terrestrial and marine biodiversity: Are there plants or marine life in the surrounding the project area?

  • Soil and sediment quality:Have soil chemical and biological analyzes been done?

  • Sensitive receptors:Are there any sensitive receptors in the area around the project?

  • Antiquities and Heritage: Are there an archaeological area near the project?

  • Economic aspects: Does the project have an impact on the economic aspects?

  • Landscaping and visual comfort:Does the project cause a negative impact on the landscape or visual comfort?

  • Have containment tanks been made for diesel tanks, with a leakage monitoring and detection system in place?

  • Has the project floor been isolated in locations where leakage may occur?

  • Have warehouses and stores been allocated to keep the materials used in the project?

  • Is periodic maintenance done for project equipment

  • Have measures been taken to mitigate environmental accidents and occupational safety?

Plans

  • Has an emergency preparedness and response plan been developed?

  • Has the Environmental Management Plan and Environmental Monitoring been done?

  • Has a plan been made to mitigate the environmental impacts of the project?

  • Has the environmental management and control plan been made?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.