Title Page
-
Site conducted
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
General Requirment
-
-
Is there a contract with a consulting office approved by the National Center for Environmental Compliance?
-
Has the environmental permit for construction been obtained from the National Center for the Control of Environmental Compliance?
-
Have the requirements attached to the environmental permit issued by the National Center for Monitoring Environmental Compliance been complied with?
-
Was the Environmental Impact Assessment Study(EIA study )adhered to?
-
Has the environmental management plan been adhered to?
-
Has a hydrological study been done for the project?
-
Is there an environmental record for the project?
Waste Management
-
Is there an approved waste management procedure?
-
Is non-hazardous solid waste disposed of?
-
Is non-hazardous liquid waste disposed of?
-
Are hazardous solid and liquid waste disposed of?
-
Are there certificates for transport and waste disposal companies approved by the National Waste Management Center?
Project workers safety precautions
-
Is there an approved procedure for implementing employee safety precautions?
-
Is it obligatory to wear and use protective equipment and clothing?
-
Is there a fire extinguishing system?
-
Is there a first aid kit?
Air Quality: Measurement of gases
-
Was the percentage of ozone gas O3 measured?
-
Was the proportion of hydrogen sulfide gas H2S measured?
-
Was the carbon monoxide (CO) gas measured?
-
Was VOCs measured?
-
Was sulfur dioxide, SO2, measured?
-
Was the ratio of nitrogen dioxide, NO2, measured?
Air Quality:Noise Measurement
-
Were noise measurements taken inside and outside the work environment?
-
Have the times, controls and requirements for monitoring noise levels issued by the National Center been adhered to?
-
Were the permissible limits for measuring the noise ratio from the National Center adhered to?
-
Have the monitoring data been kept for the period specified in Article (8) of the Executive Regulations of the National Center?
Air Quality: General
-
Was the percentage of suspended dust (PM10) and (PM2.5) measured?
-
Was ambient air quality measured in 24 hours?
-
Are the controls to limit volatile matter adhered to?
-
Have Volatile Matter Burning Standards been adhere to?
-
Are emission standards for fixed sources not to be exceeded?
-
Is regular maintenance of machinery, equipment and emission control systems adhered to?
-
Have the plans, procedures and measures issued by the National Center regarding the implementation and work of plans to reduce emissions been adhered to?
Environmental impacts of the project
-
Surface, ground, and marine water quality: Have test wells(B.H) been made at the project site?
-
Terrestrial and marine biodiversity: Are there plants or marine life in the surrounding the project area?
-
Soil and sediment quality:Have soil chemical and biological analyzes been done?
-
Sensitive receptors:Are there any sensitive receptors in the area around the project?
-
Antiquities and Heritage: Are there an archaeological area near the project?
-
Economic aspects: Does the project have an impact on the economic aspects?
-
Landscaping and visual comfort:Does the project cause a negative impact on the landscape or visual comfort?
-
Have containment tanks been made for diesel tanks, with a leakage monitoring and detection system in place?
-
Has the project floor been isolated in locations where leakage may occur?
-
Have warehouses and stores been allocated to keep the materials used in the project?
-
Is periodic maintenance done for project equipment
-
Have measures been taken to mitigate environmental accidents and occupational safety?
Plans
-
Has an emergency preparedness and response plan been developed?
-
Has the Environmental Management Plan and Environmental Monitoring been done?
-
Has a plan been made to mitigate the environmental impacts of the project?
-
Has the environmental management and control plan been made?