Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

General site information

  • Previous action items addressed?

  • Is a valid access consent available on site

  • Are all staff on site inducted?<br>

  • Are REF conditions being complied with?

  • Weather conditions

Erosion and sediment control - work site and access tracks

  • Are the access tracks into the site in good condition

  • Is up-slope ‘clean’ water being appropriately diverted around the site in a non-erosive manner?

  • Have appropriate drainage and sediment controls been installed prior to new areas being cleared or disturbed?<br>

  • Are exposed soil areas appropriately covered against erosion?

  • Are earth batters free of ‘rill’ erosion?

  • Are sediment fences free from excessive sediment and damage?<br>

  • Is sediment-laden water flowing or filtering through sediment traps?<br> <br> <br> <br> <br>

  • Are drainage lines free of soil scour and sediment deposition?<br>

  • Have sediment traps been placed next to or within road drains?<br> <br> <br> <br> <br>

  • Are all sediment traps free of excessive sediment deposition?<br> <br> <br> <br> <br>

  • Are all reasonable and practicable measures being taken to control sediment runoff from the site?<br> <br> <br> <br> <br>

  • Are all ESC measures in proper working order?<br> <br> <br> <br> <br>

  • Is the site adequately prepared for potential storms?<br> <br> <br> <br> <br>

Work site

  • Has work site been cleared as per REF ie. roots left in ground, correct sizing etc.

  • Housekeeping is being carried out and the work site is free of hazards

  • There is no evidence of spills on site

  • Spills kits are available and adequately stocked

  • Fuels and chemicals are bunded correctly

  • MSDS's are available for all chemicals on site

Revegetation of disturbed areas

  • Are soil surfaces being properly prepared prior to revegetation?<br> <br> <br> <br> <br>

  • How long since remediation of site occurred ( approx)

  • Have all materials acclimated with mining activity been removed from site, including sediment fencing that is no longer required

  • Is brush matting adequate to prevent sediment movement and assist Revegetation.

  • Has Revegetation been successful

Additional information

  • Photos of site

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.