Information
-
Location
-
Supervisor/Crew Leader
-
Job description
-
Conducted on
-
Prepared by
-
Personnel
Work order
-
Tailgate safety topic is specific to the job performed
-
JHSA signed by all crew members
-
Pre job inspection done on equipment/vehicles
Safety controls
-
Crew is aware of all hazards and how to avoid them
-
LOTO done correctly
-
MSDS SHEETS CORRECT
-
All permits filled out correctly (Confined Space etc)
-
Is Job in Confined space
-
Has confined space air quality been tested?
-
All PPE present and properly used
-
Are ladders, scaffold, fall protection in use
-
Are the ladders, scaffolds, man lifts and fall protection being properly used
Hydroblasting General Safe Work Practices
-
4.2.2 house keeping-Is the work area free of all removable hazards?
-
4.2.4 Is pump properly barricaded to restrict unauthorized people from entering the work area.
-
4.2.4 is area being cleaned properly barricaded to prevent unauthorized people from entering
-
4.2.4 is pre-printed barricade tags properly attached (Danger hydroblasting)
-
4.2.5 Are wheel chocks in place on pump and truck
-
4.2.6. Whip checks in place
-
4.2.7 Is pump operator present and close enough to disengage pressure
-
4.2.8 Is there clear line of site between pump operator and hose end equipment operator. If unable to do so is radio or third person in use
-
4.2.9 Are hoses routed and protected in a manner that prevents vehicular damage and personnel exposure to hoses
-
4.2.10 Are all personnel 6' or more away from hose connections while under pressure
-
4.2.12 Are debris barriers in place
-
4.2.13 Is pump grounded
-
4.2.14 Is anti-withdrawal device in use and mounted securely
-
4.2.15 Is a hard stop required. If so is it being utilized
-
4.2.17 Is hose shroud in place
-
4.2.18 Has back thrust been calibrated to 1/3 of operator and properly applied
-
4.2.19 Is operator controlling the foot pedal
-
4.2.19 Is foot pedal secure and free from obstruction
Hydroblasting Equipment Requirements
-
4.3.4 is stinger at least 1.5x the diameter of pipe being cleaned
-
4.2.5 Is lance marked 24"or more from the end of the compression fitting
-
4.3.6 Does shotgun have hose shroud
-
4.3.6 Is the shotgun shroud 6' in length
-
4.3.6 Has shotgun shroud been properly inspected for current qtr
-
4.3.7 Is the length of the shotgun 66" from butt stock to end of the nozzle
-
4.3.8 Are fittings rated for pressure being applied?
-
4.3.9 Does shotgun have a double trigger
-
4.3.10 Is entry point where 3D tool is in operation securely covered to prevent spray from exiting vessel
-
4.3.10 Is 3D tool appropriately suspended (rope not allowed)
-
Blast hose inspected with metal tag in place
-
Blast hose in good repair
-
10k
-
20k
-
40k
Vacuuming
-
Is job on an elevated floor
-
Is vac hose properly tied off
-
Is there a hose break in use
-
If necessary, is vac truck properly bonded
Vehicle/equipment
-
Is fire extinguisher in place and inspected
-
Is vehicle/equipment clean
Comments and corrections
Observations
Corrective Action
-
Auditor
-
Crew Leader/Supervisor