Title Page
-
Project No.
-
Panel Number
-
Rev Number
-
Pour Date
-
Conducted by
-
Location
Production Checklist
Hold Point 1
-
Boxing correct?
-
Panel checked for Square
-
Far face / Edge fitments correct?
-
Photos
-
Sign-Off (Name and Signature)
Hold Point 2
-
Reinforcement as per approved shop drawing (size, spacing, additional bars)?
-
Reinforcement
-
Cover
-
Lifters
- Face
- 8.5t
- 10.0t
- Other
-
Correct length and diameter grout tubes installed?
-
Concrete MPa
- 40
- 50
- 65
- 80
- 90
- 100
-
Concrete Type
- Grey
- O/W
- Light Weight
- Oxide
- Other
-
Have there been any modification to fitments etc from the approved plan?
-
Remarks
-
Sign-Off (Name and Signature)
Hold Point 3
-
Post Pour Check
-
Tag correct?
-
Panel dimensions correct?
-
Panel checked for Square
-
Any visual cracking or damage around lifting points?
-
N/F Fitments correct?
-
Finish acceptable?
-
Any stripping damage?
-
Were chemical or mechanical anchors used?
-
Has correct brand and type has been used in accordance with precast drawings / engineering requirements?
-
Have the anchors been installed in accordance with manufacturer requirements? (correct hole size and depth, hole cleaned out, calibrated torque wrench used to fasten to specified torque)
-
If epoxy used, has packaging been checked to ensure expiry date has not lapsed?
-
Photos
-
Sign-Off (Name and Signature)
Hold Point 4
-
Far Face Post Pour
-
Strongbacks installed and torqued as per certification?
-
Is the far face acceptable?
-
Is the element completely stripped?
-
Are there any chips or noted defects? If so what are they?
-
Storage Location
-
Photos (Far Face)
-
Have all exposed reo bars been capped before lifting?
-
Sign-Off (Name and Signature)