Title Page
-
Site conducted
-
Conducted on
-
Conducted and Prepared by
-
Location
Contractor/s
-
List of Contractors Involved in inspection
Specific Work Area
-
Work Area
Inspection
- PPE - PERSONAL PROTECTIVE EQUIPMENT
-
Head Protection
-
Comment
-
Eye Protection
-
Comment
-
Hi Visibility Clothing
-
Comment
-
Long Sleeve / Long Pants
-
Comment
-
Additional Task Specific PPE
-
Comment
-
PPE Satisfactory
-
List Reasons for Fail
PLANT & EQUIPMENT
-
Plant Type
-
List Type of plant
-
Plant Owner
-
List Contractor
-
Plant & Equipment Site Inducted
-
Pre Start Checklist Completed
-
Comment
-
Operator Licensed to Operate
-
Is spotter in place
-
Comment
-
Plant & Equipment Condition
-
Plant & Equipment Satisfactory
-
List Reasons for Fail
SAFE WORK METHOD STATEMENTS
-
Work Is High Risk Activity
-
List High Risk Activity
-
If High Risk Activity, Is a Safe Work Method Statement available
-
List Contractor conducting High Risk Work
-
List Contractor
-
Workers Have Signed and Acknowledged SWMS
-
Are All Controls Outlined In SWMS Being Followed
-
Do SWMS Identify All Risks
-
SWMS Satisfactory
-
List Reasons For Fail
PERMITS
-
Is there a Permit in Place
-
Contractor
-
All Workers Sign and Acknowledged
-
List Permit
- Hotworks
- Isolation
- Working At Heights
- Excavation
- Confined Space
-
Dial Before You Dig
-
Fire Extinguisher Tested and Tagged
-
All Controls Listed in Permit Followed
-
Permit Expiry Date
-
Permits Satisfactory
-
List Reasons For Fail
WORK PRACTICES
-
Work Area
-
Contractor
-
List Contractor
-
Work Area Housekeeping
-
Waste Bins Available
-
Barricading and Signage In Place
-
Chemicals and Fuels Stored Correctly
-
SDS readily accessible
-
Spill kits readily available and in good order
-
All Electrical Leads and RCD Test & Tagged
-
Lead Stands Being Used
-
Ground Conditions Clear of Obstructions
-
Overhead Services Are Clear from Obstructions
-
Lifting Equipment Visually Inspected, Tagged and In Date
-
All Workers Obtain Relevant Qualifications and Competency to Task
-
Work Practices Satisfactory
-
List reasons for Fail
ENVIRONMENTAL
-
Work Area
-
Contractor
-
List Contractor
-
ITEM
- Noise
- Dust
- Air Quality
- Flora & Fauna
- Water Quality
- N/A
-
Risk
-
List Risk
-
What control is required
-
Control to be actioned by
-
Not Applicable
-
Satisafactory
-
List Reasons for Non-Compliant
SAFE ACTS OBSERVED
-
Contractor
-
List safe act observed
-
Safe Act by Person/s
AT RISK BEHAVIOURS
-
Contractor
-
List at risk behaviour
-
At risk behaviour by Person/s
CORRECTIVE ACTIONS
-
Is Corrective Actions Required
-
List Corrective Action
-
Corrective Action requuired by (contractor)
-
Corrective Action required by (person)
-
Corrective Action Due Date
EPSM SIGN OFF
-
Inspection Completed by:
-
Date & Time Completed