Title Page

  • Site Name

  • Prepared by

  • Conducted on

  • Site picture

  • Location

Pre Construction information

  • Client representative and contact details:

  • Shopfitter / Main Contractor contact details (If applicable)

  • Have you checked the asbestos register and is there one available?

  • Are there any drawings available for this project?

  • Do we need to consider existing service (Gas / Water / Electrical) as part of our works?

  • What do we need to consider when working at height?

  • What are the sites Fire / Emergency evacuation procedures?

  • Add media

Project specific scope of works

  • Scope of works

  • Add media

Existing A/C Equipment

    Existing A/C Equipment
  • Description of Area Feeding (Salesfloor Front. Mid, Rear / Prep) etc

  • General Outdoor Unit Pictures showing Location / ID / Refrigerant / Age etc

  • Is the existing Indoor Unit a

  • General Indoor Unit Picture showing Location / ID / Refrigerant / Age etc

  • Pictures Indoor A/C unit Void / area details

  • Details / Size of Voids etc

  • Room Size (Length / Width / Height)

  • Heart Gain in Metres (Brief Description of Heat gain if needed)

  • Units to be

  • Approx Distance from Condenser to Indoor unit

  • Existing Suction & Liquid Sizes

  • Where is the new Location?

  • Approx distance from Condenser to indoor unit

  • Existing Suction & Liquid Sizes

  • General Notes for this section

New A/C Equipment

    Additional system
  • Is New A/C Equipment needed? (over and above existing equipment being replaced)

  • Advise Area the new A/C is required for (Salefloor / Prep) Etc

  • Pictures of where new plant will go

  • Details of new plant area (Roof Ground Level / Dimensions etc)

  • What type of indoor unit is required

  • Pictures of Area (Ceiling / General pictures)

  • Ceiling Void Pictures

  • Ceiling Void Details / Size etc

  • Heat Gain (in Metres) Brief description of heat gain if needed.

  • Room Size (Length / Width / Height)

  • Notes for this section

Delivery & Positioning of Plant

  • Do we need to replace / remove or add to existing Plant?

  • Pictures of how to get unit into position / or remove from site. Note road Name of applicable.

  • What lifting equipment do we need to complete works?

  • Advise Height / Complexity / How far etc

  • General Notes for this section

Services

  • General Pictures of existing services

  • Any concerns / Notes / Info to assist with service replacement / Modification

Electrical Info

  • General Mains board Pictures showing location etc

  • Ex A/C Breaker Information

  • A/C unit breaker sizes etc

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.