Title Page

  • Site Name

  • Conducted on

  • Prepared by

  • Location

ER/TR Audit Details

  • INSTRUCTIONS

    1. Complete all sections
    2. The auditor is expected to document all issues and to obtain photos of failures within each response.
    3. Pictures are required in some sections and questions to document responses.
    4. Most questions may be tapped to open the media dialogue.
    5. The auditor is expected to visit the CD's, ER's and ALL Telecomm Rooms. Separate UPS or PBX rooms may support the ER/TR's, These too should be reviewed.

    IT MAY BE PRUDENT TO TAKE some PICTURES OF THE ROOM AND MAJOR EQUIPMENT AHEAD OF TIME, THEN ADD FROM THE CAMERA ROLL LATER.

  • Building Name

  • Floor Level

  • Comms Room Code

ER/TR Room Details

  • Room Type

  • Provide details of rack/cabinet type ie 12RU wall mounted cabinet

  • Take photos of the TR in a 360 fashion to depict the layout of the room and major equipment. Minimum of seven photos required (each wall, floor, ceiling and outside the entrance/s.

Room Service Area & Structural Details

  • ER/TR floor area (m2) - Provide the room area and mark-up the floor plan (LengthxWidth)

  • ER/TR Area being Serviced.
    Upload floor plan with cabling zone/boundaries shown

  • Service Area (m2) - Provide mark-up floor plan of the area the TR is servicing showing cabling zone limits

  • Height (m) - >=2.4m

  • Provide ceiling height

  • Provide ceiling height

  • Ceiling type

  • Provide details of ceiling finish

  • Floor Finishes

  • Wall Finishes

  • Room is not located near hazardous services or adjacent to wet areas or within 1m of EMI source

  • Provide details of other hazardous service, take photos and mark-up on plan

Room Security & Access

  • Security System: Does the room have unauthorised access detection?

  • Provide details of the room entry method

Room Rack/Cabinet Quantity & Clearances

  • Number of racks/cabinets in the room

  • Spare Capacity (%) - detail the room spare capacity (ie can more racks/cabinets be installed)

  • Front Rack Clearance (mm) - provide the clearance in front of each rack (900mm deep require 900mm or greater, 1200mm deep require 1200mm or greater. Add a note for each rack/cabinet & mark-up floor plan

  • Rear Rack Clearance (mm) - provide the clearance at the rear of each rack, 900mm or greater - Add a note for each rack/cabinet & mark-up floor plan

  • Side Rack Clearance (mm) - provide the side clearance for each rack at the start and end of each row, preferred 150mm from wall and min 900mm for the last rack

Room Environmentals

  • Detail the cooling system type

  • Cooling System Power Supply

  • Cooling System Capacity - Provide details of the cooling system in KW or BTU's

  • Provide cooling capacity

  • Does the room have high temperature detection?

  • Provide details

  • Room Temperature ('C) - Room temperature is between 18C and 24C degrees. <br>Specify temperature outside of this range.

  • Room humidity is between 30% and 55% non-condensing, measured at 1500mm AFFL

Room lighting

  • Lighting Level (lux) - Provide details of lighting lux levels at the front of racks/cabinets

  • Lighting Level (lux) - Provide details of lighting lux levels at the rear of racks/cabinets

Room Power & Earthing Details

  • Does the room have power loss detection?

  • Provide details

  • Standby Generator Power Supply

  • Communication Room Power Supply

  • take photo's of the Electrical switch board/s door closed, door open close up of breakers and record card

  • Detail any clearance issues around the electrical switch boards?

  • Electrical Switchboard Capacity - does the electrical switch board have enough physical space capacity to add more circuits

  • UPS Type

  • UPS Total Capacity - Provide UPS capacity

  • UPS Spare Capacity - provide details of UPS spare capacity

  • Earthing System Type

  • Provide details of where the communications electrical earth system is connected to ie room Essential DB or room UPS DB, other

Fire suppression & Detection

  • Fire Detection Method

  • Fire suppression method

  • Fire Penetrations - provide details of any fire penetrations within the room

  • Fire Suppression Sprinklers?

BEMS & Other Non-ICT Equipment

  • BEMS infrastructure located in room

  • BEMS system details

  • BEMS system Connection Method - ie connected by multimode, single more or copper

  • List non-ICT equipment located in room- provide details of other equipment such as controllers, DAS etc

OH&S

  • OH&S Issues?

  • Floor surface is clean and free of debris.

  • No cables, boxes, unused equipment, paperwork, or other items found on the floor or stored in the room.

  • OH&S Issue Details

  • Equipment Located near Pipes? No equipment shall be located directly below or within 1200mm of any pipes containing water or liquid material

Rack/Cabinet Size Details

  • Take photos (with doors open) 1. Front of rack or cabinet 2. Rear of rack or cabinet

  • Provide measurement details of all racks / cabinets in the room (width, depth and height in RU)

  • Rack/cabinets labelled correctly

  • Provide details of missing or incorrect labelling and take photos

  • Provide details of spare capacity for all racks in the room (in RU's)

Rack/Cabinet Earthing Details

  • Does each rack/cabinet contain an earth bonding strip?

  • Identify which racks/cabinets don't contain an earth bonding strip

  • Is each rack/cabinet bonding strip connected to the CET?

  • Identify each rack/cabinet that doesn't have a bonding strip connected to the CET

  • Detail if there are rack/cabinet items connected to the earth bonding strip

  • Cable tray/ladder connected to earth

Rack/Cabinet Power Details

  • Detail the installed power distribution in the rack/cabinet

  • Current rating for each power feed

  • Do all the rack/cabinets have two suitably rated, captive power outlets one from the UPS & one from essential power supplies?

  • Identify which rack/cabinets don't have two suitably rated, captive power outlets

  • Do all the racks/cabinets have two vertical power rails complete with at least six 10A three pin Australian sockets, eight C13 and four C19 IEC socket outlets each fitted?

  • Provide details of vertical power rails

  • Provide details of power rails

  • Identify which rack/cabinets don't have spare capacity and also record spare capacity for each power rail including socket type

Horizontal Cabling Details

  • Provide details of any spare capacity on installed Class EA F/UTP &/or Class EA S/FTP patch panels, provide rack/cabinet ID, RU location and number of spare ports

  • Is the room utilising crossconnect wall mounted terminations? 110/210 termination

  • Patch panel spare capacity

  • Provide deatails of the class of cabling in each rack, provide a brief description of how many patch panels ie Rack X 3xCat5 5xCat6

  • Class of Cabling

  • Provide the total number of data outlets serviced by this room. Number of patch panels x number of ports per patch panel in each rack/cabinet

  • Number of Data Outlets

  • Cabling Vendor/Manufacturer - provide the details for cabling vendor list all if there is more than 1

Copper Backbone Cabling Details

  • Is there any backbone copper cabling?

  • Provide the details of incoming copper backbone cabling (number of pairs) and the details of tie cabling to racks/cabinets including how many pairs per port on voice patch panels

  • Details of the backbone copper cabling

  • Is there rack/cabinet tie cabling?

  • Details of rack/cabinet tie cabling

Fibre Backbone Cabling Details

  • Provide details of fibre cabling, provide type (OM1 OM3 OS1 OS2 etc) provide number of cores for each cable, provide FOBOT details and connector type (SC, LC etc)

  • Details per rack/cabinet of existing fibre including type

ER/TR Drawing checklist

  • Room dimensions Door height & width Ceiling height Dimensions between wall and major equipment

  • I have updated the ER/TR drawing to show equipment, dimensions, and overall layout per documented requirements.

  • I have completed rack/cabinet elevation drawings

  • All Entrances identified.

  • Rack/cabinets marked on plan

  • Fire suppression & detection identified

  • Electrical switch boards

  • Copper backbone IDF's

  • Rack/cabinet elevations

  • HVAC location & type

Signature

  • I took pictures of all identified issues

  • I completed all questions and documented recommendations.

  • Sign name to signify completion of audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.