Title Page
-
Conducted on
-
Engineer name and Site ID
-
Location
-
Scope of Works
- 5g DSS
- NTQ
- TEF Tech Add
- London Swap and Unwind
- London Unwind
- Metropolis 5G
- SW NSN Swap
- SW 5G
- VODA016
- Unwind SWAN
- Other
Self Audit
-
Pre Start Photos taken?
-
Any Legacy Issues to Report?
-
Was a Patrol Fault raised or required?
-
Labelling Completed (Optical/Power/Feeders/GPS/Warning Labels)?
-
Ducting/Entry Points Sealed?
-
ERS/Antenna Installation as per SID and DDs?
-
Correct design and location of Antenna installed?
-
All Mountings and Connections set to the correct torque settings using calibrated wrench? (Please include photo of wrench).
-
Cantenary Wires added to Antenna?
-
Yellow caps on all the thread clamp studs?
-
Feeders tested?
-
Site complete photographs taken?
-
Has GPS been installed as per DD and GPS report been generated?
-
Earths installed as per DD?
-
RET Report been generated?
-
Site Clearance Required?
-
Scope of works completed?
-
What works are still outstanding?
-
Revisit required?
-
Any other issues or comments with the upgrade?