Title Page

  • Document Number

  • Conducted on

  • Prepared by

  • Site Location
  • Estac Project number

  • Client Name

  • Installed Capacity

  • System Type

  • Installer

  • Installer Contact person

System Information

Site Drawings

  • Are the final as-built single line drawings available on site?

  • Does the diagram clearly indicate point of connection to municipal network, the location of all protection devices, location of all breakers/ isolators/ disconnectors, measurement location for all protection and control devices, connection point of SSEG to the total system?

  • Is the string line layout drawing available on site?

Solar Modules

  • Manufacturer:

  • Model:

  • Quantity:

  • Total Capacity:

Inverters

  • Manufacturer:

  • Model:

  • Quantity:

  • Total Capacity:

Battery Storage

  • Manufacturer:

  • Model:

  • Quantity:

  • Total Capacity:

Installation Details

  • Mounting System

  • Tilt Angle

  • Azimuth Angle

  • Shading Analysis

Monitoring and Controls

  • Manufacturer:

  • Model:

  • Monitoring Platform:

  • Data Access:

Dry Commissioning

AC Dry Commissioning

Confirming AC SLD

  • Confirm Cable size as per SLD

  • Confirm cable numbering as per SLD

  • Confirm cable routing as per SLD

  • Confirm conductor continuity test

  • Confirm Conductors were tested and no short circuits are present

AC Switch Gear Commissioning

  • Main breaker _____A _____kA

  • Confirm cascading

  • Confirm no short circuits

  • Flash barriers are in place and secure

  • Conform all connections are torqued to manufacturer specifications

AC SPD

  • Conform conductor’s size

  • Conform fuse specification (100A gG Fuse)

DC Dry Commissioning

Confirming DC SLD

  • Confirm Cable size as per SLD

  • Confirm cable numbering as per SLD

  • Confirm cable routing as per SLD

  • Confirm conductor continuity test

  • Confirm Conductors were tested and no short circuits are present

DC Switch Gear Commissioning

  • Main breaker _____A _____kA

  • Confirm cascading

  • Confirm no short circuits

  • Flash barriers are in place and secure

  • Conform all connections are torqued to manufacturer specifications

DC SPD

  • Conform conductor's size

  • Conform fuse size as per cable specification

DC Strings

  • Conform DC steins are correctly labelled

  • Conform and capture DC sting voltage per string

  • String
  • Voltage

  • Polarity Test completed

Performance and Safety Testing

  • Irradiance Level:

  • Temperature:

  • Open Circuit Voltage (Voc):

  • Short Circuit Current (Isc):

  • Max Power Voltage (Vmp):

  • Max Power Current (Imp):

  • System Efficiency:

Safety and Compliance Checks

  • Earthing and Bonding

  • Circuit Breakers and Fuses

  • Fire Safety Measures

  • System Labels and Signage

SSEG Tests

  • *Anti-islanding test*: Test reconnection time: <br>- Does the inverter adhere to the NRS 097-2-1 reconnect requirement? <br>- Reconnection ‘Dummy Test”<br>- Does the SSEG start to operate after being exposed to the utility supply for a short while? <br>

  • Are there labels on the distribution board clearly indicating the SSEG infeed and point of connections? Check that there are labels on the outside of the distribution board.

Commissioning Summary and Sign-off

  • Is the site neat and clean?

  • The installation complies with the relevant sections of NRS 097-2-1 and NRS 097-2-3

  • All safety labels have been fitted according to NRS 097-2-1

  • The installation complies with the relevant sections of SANS 10142-1 and other relevant SANS

  • The installation complies with the licensing requirements of NERSA

Engineer Sign-off

  • Pr. Eng

  • Professional Registration number

  • Company Name

  • Email

Client Acceptance

  • Client name:

  • I, with due authority to represent the Client, hereby the accept the handover of this system.

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.