Information
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
General condition of the working area?
-
Working condition according to safety Rules?
-
Canniveau / Kanal installed in line and on even level?
-
Cables placed in canniveau / kanal ?
LEU
LEU cabinet
Exterior inspection
-
Is there a identification on the cabinet?
-
Is it easy to open en close the cabinet ?
-
Socle fixation according to good craftsmanship?
-
Are the swivel correctly placed?
-
Is the General condition of the cabinet ok?<br>(Take pictures from each side and mark the damages)
Interior inspection
-
Are all the cables identified?
-
Are the earth connections correctly placed?
-
Are the earth connections fixed?
-
Feritte 24V placed?
-
Feritte cable TFM placed?
-
Are the Thomas & Betts tubes closet with PU foam?<br><br><br><br>
-
Are the cables protected with a thermo sleede.
-
LEU Inspection
LEU MT
-
Signal:
-
Serial number:
-
LEU Inspection
LEU MC
-
Signal:
-
Serial number:
-
LEU Inspection
LEU MS
-
Signal:
-
Serial number:
Balise
- Balise Group
Identification
-
Take picture of the BD identification
-
Label placed on BD
-
Label placed on LEU cable
-
Label placed on Balise 0
-
Label placed on Balise 1
Placement
-
3m between balises
-
Metal protection and balise cable OK
-
BD placed in ?
-
1.5m away from the track and safe working area
-
Fixation stable?
-
Placed 2.5m away from the track with safe working area?
-
Fixed with 4 bolts and stable ?
-
Placed on metal platine?
-
Using omega rail protection or cable protected ?
-
Placement stable?
-
Working area safe and out of gabarit?
-
BA panel installed?
-
BA panel aligned with balise 0 (+/-50cm)?
-
BA panel installed min 2m away from the track?
BD housing
-
BD not damaged?
-
No water infiltration?
-
Swivel / stopper in place?
Connections
-
Take picture of BD inside
-
Cables correctly insterted in BD (with thermo sleeve)?
-
Correct connection sequence inside?
-
Wago are not damaged and cables strongly connected?