Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Contractor Name

  • Select engineers manager

  • Write the engineer name

  • Date of installation by the Operative

  • Inspection outcome?

Service Order and inspection

  • Address and Post Code
  • Single Phase / Three Phase

  • Earthing arrangement

  • CT clamp (fuse saver) fitted in the correct location ?

  • EV consumer in a correct location ?

  • Is the metering equipment sealed ?

  • Is the correct supply cable used ?

  • Is the supply cable install correctly ?

  • Is the correct MCB or RCBO used for install ?

  • Has the SPD been fitted correctly

  • EV conductors terminated correctly.

  • Termination of the distribution circuit conductors correct ?

  • Why is it the wrong type of cable?

  • Cable run holes and equipment sealed with sealant ?

  • Do all the enclosures provide the correct degree of protection?

  • Charge point fitted in the correct location ?

  • Does the EVCP install have PEN protection?

  • Photo of polarity check plug used before and after ?

  • Identification used on conductors ?

  • All labels fitted to EV equipment and filled in ?

  • All Onroute signatures are captured ?

  • Which signatures missing ?

  • Which signatures are missing.

  • All Onroute pictures are captured ?

  • Electrical Certificate filled in correctly ?

  • Add certificate

  • Add certificate

  • Add certificate

  • Electrical certificate sent to customer ?

  • All redundant equipment removed from site (cable, packaging and site left tidy) ?

  • Is this an invasive or non invasive PC audit ?

  • EVCP fitted to manufacture instructions ?

  • Are all terminals screws are tight (Isolator, Blocks, EV DB and Charger terminals ) between 180° and 360° (half turn)?

  • How many turns was required and any signs of over heating?

  • Was any damaged caused when over tightened?

  • Was there any signs of over heating?

  • Has the EVSE been left in smart mode, connected to the charger app on the customers phone ?

  • why wasn't the EVCP commissioned?

  • Why wasn't the EVCP connect to the app?

  • All redundant equipment removed from site (cable, packaging and site left tidy) ?

  • Do your findings match those recorded by the operative ?

  • What is different to recorded details?

  • Take and record missing photos.

  • Are all test results recorded same as your findings ?

  • Upload original electrical certificate.

  • Pictures of the Installation

Remedial work

  • Is all equipment install in a satisfactory condition?

  • Please select all that applys

  • Has any remedial work been done on site?

  • Please provide details of the action taken and work completed.

  • Please provide photographs of the works

  • Please select all consumables used.

  • Have you submitted any warning notices?

  • Please provide details

  • Any comments from the customer?

  • Please provide details.

Audit Review

  • Inspection outcome

  • List the Codes required

  • Select the error codes required.

  • Select the error codes required.

  • List the Code required

  • Select the error codes required.

  • Select the error codes required.

  • Select the error codes required.

  • List the code required

  • Select the error codes required.

  • Select the error codes required.

  • Select the error codes required.

  • Please provide any good feedback observed during the audit.

  • Auditor Signature

  • SAP(T) Tracker updated

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.