Information
-
Client / Contact Number
-
Location
-
Survey Type
-
Inspection Pass/Fail
- Pass
- Fail
- N/A
-
Conducted on
-
Conducted By
Landlords / Property Owners Details
-
Name / Organisation
-
Contact Details
-
Date conducted
-
Photo of the front of the property
Inspectors name/signature of acknowledgement of responsibility to input accurate and true information.
-
Inspectors Name and Signature
-
Clients Name and Signature
PROPERTY BACKGROUND
-
Property type
- Detached
- Semi Detached
- Mid Terraced
- End Terraced
- Detached Bungalow
- Semi Bungalow
- Flat
-
Heating Type
- Gas
- Electric
- Solid
- Oil
- LPG
AUDIT CARRIED OUT?
-
Audit Profile
- Cavity
- Loft
- Damage
Post Installation Inspection
CAVITY CLEARANCE & CAVITY WALL INSULATION
-
Material Installed
- Mineral Wool - White
- Mineral Wool - Yellow
- EPS - white
- EPS - Carbon
- EPS - Diamond
- Foam
-
Is the drilling pattern to the correct specifications?
-
Has the Thermascope been used?
-
Have barrier brushes been fitted?
-
Was client happy with post works cleanliness?
-
Are all injection holes filled correctly?
-
Does the finish match the existing wall?
-
Are essential vents to satisfaction?
-
Are non-essential vents to satisfaction?
-
Has smoke spillage tests been carried out?
-
Are all eaves clear of insulation?
-
Is flue cert present?
-
Is there any material ingress?
-
Are the external walls in good condition? (Please take photos)
Building Defects
Conclusions
-
Overall Findings?
-
Recommendations and Actions
-
Documentary Evidence
LOFT INSULATION
-
Property type
- Detached
- Semi Detached
- Mid Terraced
- End Terraced
- Detached Bungalow
- Semi Bungalow
- Flat
INSTALL INFORMATION
-
Material used?
-
Existing material thickness?
-
Thickness installed?
Post Installation Inspection
-
Has the loft hatch been insulated?
-
Has the loft hatch been DP and Hooks and Eyes fitted?
-
Have warning notices and crest been stapled to rafters?
-
Have poly wedges been fitted correctly?
- yes
- no
- N/A
-
Are all Eaves clear of insulation?
-
Are all high amp cables clear of insulation in line with PAS2030 and Down lights fitted with F Rated covers?
-
Are all flues clear of insulation?
-
Are all tanks insulated correctly?
-
Has all pipe lagging been fitted correctly with bends mitred accordingly and taped every 1m?
-
Has insulation been applied to below elevated tanks?
-
Has a walkway been fitted to tanks more than 1m from hatch?
-
Have all areas been insulated to correct depth?
-
Is material insulated to the wall plates?
-
Are sloping areas insulated correctly with celotex board?
-
Is the loft clear of debris?
Conclusions
-
Overall Findings?
-
Recommendations and Actions
-
Documentary Evidence