Title Page

  • Site conducted

  • Conducted on

  • Location
  • Customer Name

Pre Set up

  • Have you put down the protective sheets before starting work? (Photo required)

Additional Work

  • Additional Work

Additional Work

  • Please add any photos of extra payable work here

  • Plywood installed to cover the gap left by the drip rail? (Photo/s required if applicable)

  • Apex boarding photos (Photo/s required if applicable)

  • Any rotten plywood that needed to be replaced with new plywood? (Photos required if plywood replaced)

  • Please take a photo of the timber batons (replace if needed)

  • Remove Cladding? (Photos required if yes)

  • Cutback brickwork? (Photos required if cutback)

  • Bay windows insulated? (Photos required if insulated)

  • Utility Box chamfered with Window Sill?

  • Any other additional work? (Take photos here and write description in notes)

Background Ventilation Works

  • Please take photos of any works done for Background Ventilation

  • **For background ventilation**

    Square fans (Intermittent fans) need a background vent in the bathrooms, en-suites and kitchens, along with habitable rooms.

    Circle fans (dMEV fans) only need background vents in habitable rooms.

    Habitable rooms are bedrooms and lounge, dining rooms.

  • Have you installed Apex Ventilation? (Photos required of both Apex sides of vent holes)

  • Has the existing background ventilation been cut through the walls? (Photo required of each background vent and labelled/annotated)

  • Have you installed background vents or window trickle vents on this stage? (Photos required if so)

  • Have you installed Skirt Ventilation? (Photos required of vent holes)

Warranty Required Photos

  • Warranty Required Photos

Warranty Required Photos

  • Please take the required photos below as we need these for the Warranty

  • Base Rail installed above Bay Windows? (Photos Required)

  • Have you put L Shape boards around the windows and doors? (Take photos of ALL windows for evidence)

  • Have you put APU Bead around all windows and doors?

  • Has Rockwool been used around the boiler flue with 1 metal washer in each rockwool? (Photo required if applicable)

  • Have the window sills been fitted? And are they 40mm from the wall? (1 photo required)

Other Photos + Final Stage

  • Other Photos + Final Stage

Other photos and checklist

  • Does the park home have enough jacks in situ supporting the chassis<br>(8 for single, 16 for double)

  • Do all light cables have sleeving? (Photo required for evidence)

  • Do all lights have the grey wago box fitted? (Photos required)

  • Does the door bell cable have the grey wago box fitted (Photos required)

Park Home Boarding Final Stage

  • Take photos of all elevations of the Park Home now boarded (10 photos required + close ups of porches and/or conservatories)

  • Any other photos that need to be be taken that isn't on this survey?

  • Have 2 tempoary lights been installed for the customer? (Photos required if applicable)

  • Has the home been left in a tidy state?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.