iAuditor Mobile App Preview

Audit

Starting the machine

Perform walk around inspection

Mount the machine using 3 points of contact

Turn the battery disconnect switch to ON

Adjust seat, arm rests

Fasten seat belt

Confirm all implements are grounded

Move hydraulic lock lever into the LOCKED position

Make sure all personnel are clear of machine

Turn the key start switch to ON

Perform start-up test on the monitoring panel

Turn the key start switch to START; Crank engine

Machine warm-up

Allow machine to warm-up for 5 minutes at low idle

Engage and disengage hydraulic controls to help speed warm-up of hydraulic oil

Cycle all controls to allow warm oil to circulate through all cylinders and lines

Check gauges and action lights frequently

Moving the machine

Make sure the area is clear

Move hydraulic lock lever into the RUN position

Raise all lowered implements

Move travel controls in the direction you want to go (check machine rotation: final drives are to rear)

Machine shut-down

Park machine on smooth, level area

Ground all hydraulic implements

Move Hydraulic lock lever into the LOCKED position

Allow engine to run at LOW IDLE for 5 minutes

Turn key start switch to OFF and remove key

Turn battery disconnect switch to OFF

Dismount machine using 3-point contact

Conduct post-operation walk around inspection

Overall Rating

Is the equipment safe to use?

Recommendation

Write recommendations here

Completion
Full name and Signature of the Inspector

Excavator (front Shovel) Equipment Checklist

Created by: SafetyCulture Staff | Industry: General | Downloads: 41

Use this checklist for start-up and shut-down procedures when operating a front shovel excavator. This template guides you to perform various checks when starting the machine, during warm-up, when moving the machine and when shutting down. This template can be customized for your specific heavy equipment or machinery being used during excavations and trenching.

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Audit

Starting the machine

Perform walk around inspection

Mount the machine using 3 points of contact

Turn the battery disconnect switch to ON

Adjust seat, arm rests

Fasten seat belt

Confirm all implements are grounded

Move hydraulic lock lever into the LOCKED position

Make sure all personnel are clear of machine

Turn the key start switch to ON

Perform start-up test on the monitoring panel

Turn the key start switch to START; Crank engine

Machine warm-up

Allow machine to warm-up for 5 minutes at low idle

Engage and disengage hydraulic controls to help speed warm-up of hydraulic oil

Cycle all controls to allow warm oil to circulate through all cylinders and lines

Check gauges and action lights frequently

Moving the machine

Make sure the area is clear

Move hydraulic lock lever into the RUN position

Raise all lowered implements

Move travel controls in the direction you want to go (check machine rotation: final drives are to rear)

Machine shut-down

Park machine on smooth, level area

Ground all hydraulic implements

Move Hydraulic lock lever into the LOCKED position

Allow engine to run at LOW IDLE for 5 minutes

Turn key start switch to OFF and remove key

Turn battery disconnect switch to OFF

Dismount machine using 3-point contact

Conduct post-operation walk around inspection

Overall Rating

Is the equipment safe to use?

Recommendation

Write recommendations here

Completion
Full name and Signature of the Inspector