Title Page
-
Conducted on
-
Prepared by
-
Location
-
Contract Name
-
Contract Number
-
Are the openings prepared and ready for installation?
-
Do the Survey sizes match the opening sizes?
-
Is any packing required?
-
Will scaffolding need to be moved before the installation? If yes please state date due to be taken down
-
Will the door threshold be in the correct position?
-
Does the site have good internal access if required?
-
Does the site have good external access?
-
Is there good parking outside the property?
-
Do we require tower scaffolding?
-
Do we require a skip? if yes please state agreed location
-
Additional information
-
Images of the site
-
signed SPC
-
Signed Client