Title Page
-
Document No.
-
Work Description
-
Field Asset type
- Circuit breaker
- Capacitor overhead
- Capacitor banks
- Pillar
- Pole
- Switch - ground
- Switch - OH
- Transformer
- LV UG Reticulation
- Zone Substation
- HV Underground
- Gas
-
Network Region
- E-Northern
- E-Auckland
- Other
-
Specify
-
FSP
- Electrix
- Northpower
- Treescape
- Other
-
Specify
-
Are any Job permits in use?
- Access Permit
- Live Line
- Test
- Hot Work
- Confined Space
- Close Approach Consent - Electricity
- Close Approach Consent - Gas
- Live Gas Safety Evaluation
- Other
-
Specify
-
Type of Work
- Asset Replacement
- Corrective maintenance
- Planned maintenance
- Reactive maintenance
- Connections
- Project
-
Old Field Asset #
-
Type of Project
- Capital Faults (RRP)
- Customer (CIP, ESAM, RNF)
- Growth (EBD or RNF)
- Integrity (APF, APP, ARF, ARP, ASC or PAC)
- Relocations (REL)
-
Field Asset # (or WBS if no Field Asset #)
-
Vector Workpack # and Name
-
FSP Job #
-
On-site supervisor
-
Conducted on
-
Location
-
Weather Conditions
-
Name & Signature
Audit Section
HEALTH AND SAFETY
PLANNING & COMMUNICATION
-
Site safety management plan in place, current and adhered to (Eg. hazard Id, JRA, JSA)
-
Daily tailgate/toolbox briefings occurring
-
Employees signed-on to ensure they understand the work methods
-
Visitors signing on/off tailgate or visitors register
-
Staff training (Incl. contractors) & competency records/certificates available on site and current to relevant job/task eg. WTC,COC, Drivers License, Crane Operator (sample check and list names)
-
Resource consent available on site? Verify consent conditions.
PROJECT RISK MANAGMENT
-
Is this a long term project site?
Project Risk, Hazard Managment
-
Site Hazard Board in place with relevant site hazards
-
Risk register current and reflect site risks & hazards
-
Worksite being reviewed daily for new/changed/removed conditions
-
Drug and alcohol policy communicated and testing implemented
-
Regular site safety meetings held and minuted
-
Incident near miss register
-
Site specific SWMS / JSA’s available on site for high risk activities?
-
Are work hours being monitored for fatigue
-
Emergency procedures available and includes specific incident scenarios that could occur with suitable emergency response
-
EMP available and meet Resource consent conditions? e.g. erosion and sediment control
-
Site Specific Waste Management plan available
SITE ACCESS/EGRESS
-
Access routes adequately sign posted where required
-
Access routes kept clear and free of obstructions
-
Unloading/storage/material handling being controlled
SITE ACCOMMODATION
-
Is there temporary site accommodation?
-
Site Sheds installed correctly (Level/Stable/Height)
-
Site sheds display current electrical certificates (6 monthly) - Is the Warrant of Electrical Fitness available for the Site shed
-
Site sheds appliances display current electrical certification (3 monthly)
-
Waste and drainage conforms to requirements (safe & Sanitary)
-
Site offices clean & tidy
-
Toilet areas clean & tidy
-
Lunch room & food prep area clean - hand washing facilities been provided
-
Adequate lighting
-
Safe Access/egress provided to site accommodation and evacuation point identified
-
First aid kits in place & well stocked
-
Fire extinguishers available, charged & current (Serviced 12 monthly)
-
Welfare facilities on site, toilet, lunch area, drinking water, hand washing
PUBLIC PROTECTION
-
Adequate signage around the perimeter (if required)
-
Safe alternate route for public
-
Site parking controlled (as required)
-
Worksite protection i.e. Temporary barriers, TTMP installed, External fences
-
Is network equipment secured against unauthorised access
PERSONAL PROTECTIVE EQUIPMENT & CLOTHING (PPE/PPC)
-
Hard Hats worn (where required)
-
Full Cover, High Visibility, Fire Retardant / Arc-rated clothing worn
-
Safety footwear worn that complies with site requirements
-
Manual handling work gloves used (where required)
-
Eye protection worn (where required)
-
Face Shields in use (where required)
-
Hearing Protection worn (where required)
-
Respirators or masks worn (where required)
-
Appropriate PPE and PPC worn for task and current test date
-
PPE & PPC is in good condition
SUBCONTRACTORS
-
Are there any subcontractors onsite?
-
Subcontractors Site Specific Safety Plans in place, agreed & implemented
-
Subcontractors have identified significant hazards they are introducing to site and entered on site hazard register
-
Subcontractors informed of our site hazards likely to affect them (inductions, briefings)
-
Subcontractors have provided MSDS sheets for all hazardous substances on site (where applicable)
-
Subcontractors have provided Equipment Certificates where required
LADDERS
-
Are ladders in use?
-
Ladder is the most appropriate access solution for the task
-
Suitable for the job i.e. commercial/industrial grade not domestic.
-
Ladders are in good condition
-
Ladders set up on firm level ground
-
Ladders secured (base and/or top)
-
Ladders at correct angle - 4 up to 1 out
-
Ladders project 1m above step off point
-
Step ladder lock bars in place
-
Operator not working on top two steps of ladder
-
Do extendable ladders comply with relevant standards and in test
WORK AT HEIGHT
SAFETY HARNESS & STATIC LINES
-
Is height work involving safety harness being carried out? (not including pole work or EWP)
-
Plan developed for harness use and workers signed onto plan
-
Workers briefed and signed onto rescue plan
-
Harness uses supervised by worker holding US15757
-
Harnesses used and fitted correctly
-
Harnesses, anchors, static lines and rescue equipment in good condition and in test
SCAFFOLD
-
Is any scaffold in use?
-
Wheel brakes fitted and locked when scaffold in use (mobile only)
-
Scaf-tag / acu-log tag fitted to scaffold (not req for mobile)
-
Harnesses, anchors, and rescue equipment in good condition and controls in place (not req for mobile)
-
Harnesses used and fitted correctly
-
Harness used for erection of scaffold
-
Has design verification been obtained by a Chartered Professional Engineer (CPEng)?<br>(Consider: heavy loads, shrink wrap (environmental factor), unusual shapes, load bearing capacity of the ground or supporting structures, height)
EWP, CRANE, HELICOPTER, LIFTING, HEAVY MACHINES
-
Are any EWP's, Cranes, helicopters, earth moving or lifting machinery in use?
ELEVATED WORK PLATFORMS (Cherry Pickers/Scissor Lifts/Knuckle boom)
-
Current certificate of fitness and mechanical test attached to unit (6 monthly)
-
Set up on level ground and bonded to earth as required
-
Outriggers properly extended before use (where fitted)
-
Fall arrest harnesses being worn
SITE VEHICLES/MACHINES (Quarry Trucks, Hiabs, Dozers etc)
-
Competent operators/drivers
-
Vehicle loads are secure when travelling
-
Outriggers extended where required
-
Feet on stable ground
CRANES
-
Current certificate of fitness
-
Safe load indicator fitted/operational
-
There is enough clear room for operation
-
Slings, chains, lifting beams regularly checked/tested
LIFTING EQUIPMENT
-
Slings and shackles load rated and 'In test' tag attached
-
All lifting equipment, slings, chains, shackles, safety catches etc in good condition
-
Adequate storage of lifting equipment
HELICOPTER
-
All workers are signed on to the Pilot Safety briefing
-
All workers are in the Pilot's line of sight
-
All loose objects have been secured including hard hats
ELECTRICAL
ELECTRICAL - SUBSTATION, UNDERGROUND OR GROUND MOUNT
-
Is any electrical work being carried out underground, ground mount or in a substation?
-
Equipment to be worked on is clearly identified?
-
No work on “Live” electrical equipment or cables
-
Boundary markings and signs for permits in ODS as per SM-EI 3.413
-
Permits to Work being issued, managed & terminated correctly
-
Are all workers accessing conductors or within MAD signed onto an access permit or test permit or live line permit?
-
If under permit are workers aware of isolation points and safety measures?
-
Are MADs being observed where applicable?
-
ELCB’s/RCD’s/Transformers used where required.
-
Leads, test equipment are in test?
-
Commercial splitter boxes & double adaptors only in use with RCD.
ELECTRICAL SWITCHING
-
Is any HV or LV switching being carried out?
-
Switching operator has current competencies for equipment being switched?
-
Lockout procedure in use where appropriate, lock and tag applied?
-
If isolated, is the isolation in accordance with the Switching Plan?
-
Correct safety measures have been applied
-
Are MADs being observed where applicable?
-
Access Permit holder supervisor understand responsibilities and is continuously supervising
-
Verify access permit area is understood by all workers
-
Verify understanding of MAD’s i.e. Inadvertent falling, stretched arm including tool length in hand
OVERHEAD LINE WORK
-
Is there any overhead line work being carried out?
ELECTRICAL OH
-
No work on “Live” electrical equipment or cables
-
Permits to Work being issued, managed & terminated correctly
-
Are all workers accessing conductors or within MAD signed onto an access permit or test permit or live line permit?
-
If under permit are workers aware of isolation points and safety measures?
-
If Live Line, is the work in accordance with the Live Line proposal and permit?
-
EPZ zone created, portable earths and dielectric bods
-
Are MADs observed and understood i.e. Inadvertent falling, stretched arm including tool length in hand?
-
Cover up aplied to lower circuit as required
-
Are all person clear from the cross-arm of the pole during strining and tensioing?
-
Insulating component of EWP cleaned and safety marker visible while in contact area
-
All second points of contact covered and safety observer identified and in place
-
Live line cover up inspected and in "test" and correct class
-
Does live line work meet ECP46 / EOS 006?
HAZARDOUS ACTIVITIES
EXCAVATIONS & TRENCHES
-
Are there any excavations being worked in?
-
Notification sent if deeper than 1.5 metres
-
If greater than 1.5m, there is an entry/exit plan implemented
-
Underground services location drawings on site prior to ground works
-
Underground services located/marked prior to excavating
-
Underground services located by potholing at frequent intervals as required
-
Permit to excavate held at work face (if applicable)
-
Shoring methodology developed. (ensure workers not in danger installing)
-
Sides battered/benched for trench or excavations where required by risk assessment
-
Machines working safe distance from edge of excavation i.e. using stop blocks
-
Zone of influence considered for Machinery / material away from edge? (Excavation depth plus 1 meter)
-
Daily inspection for excavation structural stability (In writing or electronic check sheet)
-
Excavation appropriately barricaded? i.e. Solid or Tiger tails 2m away
-
Safe access provided for workers to enter and exit excavation
-
Emergency Response plan available for workers and others safety covering each incident scenario
CONFINED SPACES
-
Are there any confined or restricted spaces being worked in?
-
Restricted space atmosphere has been tested before and during work
-
Confined space has been permanently sign posted
-
A confined space entry permit has been issued, displayed and current
-
An assigned safety standby employee is outside the confined space
-
Appropriate emergency response and first aid procedures and provisions have been planned and established
-
Safe entry/egress maintained to the confined space, including entry & descent equipment ( ladders, steps or tripods)
-
There is a record of each person entering a confined space including person required for stand-by purposes
-
Natural or mechanical ventilation is provided before anyone enters the confined space( where applicable)
-
The gas detector is in good condition, display a current calibration certificate and personal gas detectors being worn
-
Where flammable atmospheres exist, precautions have been taken to eliminate all sources of ignition
-
If the confined space is below the ground and near areas where vehicles, plant or generators will be operating; vehicle exhaust or carbon monoxide is unable to enter the space
-
The atmosphere inside the confined space is frequently tested or continuously monitored during work for oxygen levels, flammable/explosive LEL's and any other airborne contaminant identified during risk assessment
-
Atmospheric readings are recorded at regular intervals
WORKING ON THE ROAD
-
Is work being undertaken on or near the road requiring traffic management?
-
TMP has been approved by Road Controlling Authority (NZTA, local authority
-
There is a copy of the TMP on site
-
The site/project setup conforms to the TMP
-
There a qualified Traffic Controller on site
-
An STMS has been appointed for the work and wearing the correct high visibility vest
-
The supervisors know who the STMS is and how to contact them
-
Is STMS or TC onsite and diligent/active, site being pro-actively managed
-
All workers wearing NZTA approved hi-vis clothing ie. in good condition and worn appropriately
-
On-Site Record and two hourly site due diligent checks completed by STMS / TC
GAS WORK SITE
-
Is this a Gas work site?
-
A personal gas detector is worn and 'in-calibration' (where applicable)
-
All test and safety equipment is calibrated and certified for use
-
Has a pre-entry and subsequent atmosphere tests been recorded (where applicable)?
-
All electronic devices used on site are work related and not taken into exclusion zones
-
Non-Routine Operation approved?
-
Correct isolation procedures followed?
-
Has live gas work been pre-approved?
-
Any gas venting or purging being done correctly?
-
Full requirement of fire extinguishers on site?
-
All electrical equipment safe to use? i.e. Test & Tag/RCD etc
-
No electrical equipment being used in gaseous atmosphere?
-
All ignition sources identified and appropriately controlled?
ENVIRONMENT
HOUSEKEEPING
-
Work areas clean & tidy
-
Rubbish bins or skip provided (where required)
-
Slips & trips controlled
HEALTH MANAGEMENT
-
Noise levels controlled and monitored
-
Work area identified as a noise restricted area
-
Dust controlled and monitored i.e. watering
-
Workers provided with the appropriate environmental protection ie. hydration, cover, sunblock
-
Dust masks available and worn i.e. Concrete cutting, Asbestos exposure, neighbouring activities
ENVIRONMENTAL MANAGEMENT
-
Have environmental risks been identified within the daily Tailgate or Environmental Management Plan?
-
Appropriate silt/substance protection installed to prevent soil sediments from entering any drains and waterways?
-
Disposal of waste in an appropriate manner?
-
Resource consent available to discharge water in storm water and sewer system?
CHEMICAL HANDLING/STORAGE
-
Hazardous substances have been identified (toxins, biological, lead, asbestos) and controlled
-
Are any chemicals onsite?
-
All workers trained in the handling, storage of all hazardous substances
-
Materials on site to deal with spillages (oil dry etc)
-
All workers trained in the use of the spill kit
-
Disposal procedure available for contaminated spill kit contents
-
SDS’s available for all chemicals/solvents/hazardous materials (dated < 5years?)
-
Hazardous material clearly identified
-
Hazardous materials properly stored
-
Hazardous materials properly handled/used
-
Chemicals stored in approved containers
-
Users of hazardous materials properly informed
-
Adequate ventilation provided (where necessary)
-
Inventory available for all hazardous substances on site
QUALITY
WORK PROGRESS
-
The scope of works is being followed
-
The work is being performed to network standards
-
Issues are being identified and communicated
-
The work is progressing to programme
-
Quality assurance standards are being met
-
Have the Testing & Commissioning checklists been completed?
PROJECT QM
-
Is this a multi day project site requiring quality checks?
-
Service providers quality management plan in place
-
Project management plan is in place
-
Service providers HS&E management plan is in place
-
Service providers risk management plan is in place
-
Is the service provider carrying out quality control and health and safety audits
-
Are weekly progress reports being submitted
-
Weekly site meetings with key personnel are taking place
-
Construction and testing to vectors standards
-
Installation and Test Plan ITP signed off prior to commissioning
-
Test reports are submitted and approved
-
All equipment used and installed onsite is fit for purpose
-
Commissioning plan specific to site is in use
-
All equipment installed on site commissioned according to manufacturer’s and Vectors specification
-
Hand over meetings are taking place with key personnel
-
Site as-built records are well managed
GENERAL COMMENTS
-
GENERAL COMMENTS