Information
-
Document No.
-
Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Survey
-
Type of survey conducted
-
Type of site surveyed
-
Grid Owner
-
Utility Meter Number
-
Name of site agent / manager
-
Contact number for site manager
Site Access for deliveries
-
Is access to work area safe and free from obstruction
-
Largest size delivery vehicle the site will accommodate
-
Photo of access routes
Site Storage
-
Is there a safe place on site for storage of tools and kit
Roof type and construction
-
Select roof type
-
Select roof construction
-
Roof height to eaves in metres
-
Roof length in metres
-
Roof Width in metres
-
Roof pitch in degrees
-
Roof orientation ( approximate )
- North
- South
- East
- West
- East / West combo
- South East
- South West
-
Can the installation be completed without a structural engineers report
-
Draw or upload a sketch of roof
-
Upload google earth roof plan
-
Photo of roof to be installed
Module type and layout
-
Is the roof clear of obstructions
-
Photo of roof obstructions
-
Are there any obvious shading issues
-
Describe level of shading
Access equipment locations and issues
-
Type of access equipment required
- Geda Lift
- extension ladder
- Crane
- Cherry Picker
-
Can all scaffold be erected easily
-
Will scaffold require Herras fencing to create a safe work area
-
Will a loading area be required
Main AC connection point
-
Select phase type of main AC connection point
-
Main AC connection Breaker Rating (Amps)
-
Photo of main AC connection point
-
Distance from inverter to main AC connection point
-
Is there space inside the main DB to add a breaker for grid connection
Solar PV meter location
-
Can the Solar PV meter be mounted next to the existing utility meter
-
Is the meter located indoors or outdoor
-
Does the meter require a separate weather proof enclosure
Inverter location and fixing detail
-
Describe potential inverter locations
-
Photo of inverter location
-
Inverter location is indoors or outdoors
-
Inverters will require protecting from the weather
DC string route and containment
-
Describe DC route and containment requirement
AC cable route and containment
-
Describe AC cable route and containment requirement
-
Can the system be installed without earthing rod
Remote monitoring logger / gsm
-
Remote monitoring
Sign off and management review
-
Surveyor
-
Checked by Technical Team