Information

  • Document No.

  • Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Survey

  • Type of survey conducted

  • Type of site surveyed

  • Grid Owner

  • Utility Meter Number

  • Name of site agent / manager

  • Contact number for site manager

Site Access for deliveries

  • Is access to work area safe and free from obstruction

  • Largest size delivery vehicle the site will accommodate

  • Photo of access routes

Site Storage

  • Is there a safe place on site for storage of tools and kit

Roof type and construction

  • Select roof type

  • Select roof construction

  • Roof height to eaves in metres

  • Roof length in metres

  • Roof Width in metres

  • Roof pitch in degrees

  • Roof orientation ( approximate )

  • Can the installation be completed without a structural engineers report

  • Draw or upload a sketch of roof

  • Upload google earth roof plan

  • Photo of roof to be installed

Module type and layout

  • Is the roof clear of obstructions

  • Photo of roof obstructions

  • Are there any obvious shading issues

  • Describe level of shading

Access equipment locations and issues

  • Type of access equipment required

  • Can all scaffold be erected easily

  • Will scaffold require Herras fencing to create a safe work area

  • Will a loading area be required

Main AC connection point

  • Select phase type of main AC connection point

  • Main AC connection Breaker Rating (Amps)

  • Photo of main AC connection point

  • Distance from inverter to main AC connection point

  • Is there space inside the main DB to add a breaker for grid connection

Solar PV meter location

  • Can the Solar PV meter be mounted next to the existing utility meter

  • Is the meter located indoors or outdoor

  • Does the meter require a separate weather proof enclosure

Inverter location and fixing detail

  • Describe potential inverter locations

  • Photo of inverter location

  • Inverter location is indoors or outdoors

  • Inverters will require protecting from the weather

DC string route and containment

  • Describe DC route and containment requirement

AC cable route and containment

  • Describe AC cable route and containment requirement

  • Can the system be installed without earthing rod

Remote monitoring logger / gsm

  • Remote monitoring

Sign off and management review

  • Surveyor

  • Checked by Technical Team

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.