Title Page

  • Application Number

  • Conducted on

  • Assessing Engineer

  • Real Property Description

  • Site Address

Project Details

  • Developer Name

  • Developer Phone

  • Developer Email

  • Contractor Name

  • Contractor Phone

  • Superintendent Name

  • Superintendent Phone

Checklist

  • Roadworks

Roadworks

  • Grades and profiles to roads and footpaths constructed to design

  • AC surfacing for texture and finish/free of blemishes

  • Bitumen surfaces to be swept of excess stone/bitumen

  • Street names, signs, line-marking, hazard boards, traffic signs, guide posts

  • Boundaries clearly denoted with markers

  • Check conduit against markers

  • Driveways, footpaths and other concrete works constructed as per design

  • Joints in the seal (especially where various development stages apply) are flush

  • Road surface damage, when cause by utility service providers, should be repaired during the maintenance period

  • Back of kerb turfed to a minimum width of 800mm

  • All service fixtures (such as valves) are flush with the surrounding verge

  • Concrete footpaths and pram ramps are constructed to the specified standards

  • Signs and pavement marking for roads and bikeways are installed as per the approved drawings

Additional comments

  • Additional comments relating to Roadworks

  • Concrete Kerb & Channel (CKC) and Medians

Concrete Kerb & Channel (CKC) and Medians

  • The correct type are used at all locations (including medians) in accordance with the specified standards

  • Transitions and connections to existing construction are smooth and to a satisfactory standard of workmanship

  • Service markers are placed in kerb face.<br>Conduits (including water) should be exposed for inspection purposes.

  • Lip and back of kerb are flush with the roadway and footpath respectively

  • All channelisation works and medians have been satisfactorily completed

  • Backing strips are provided to median kerbs where required

  • Subsoil drains are provided under medians

Additional comments

  • Additional comments relating to Kerb & Channel

  • Stormwater Drainage

Stormwater Drainage

  • Roads, pipes, structures, flow paths clear of silt and debris

  • No ponding on roads, in pipes, structures, kerbs on flow paths

  • Turfing and/or grass seeding applied to prescribed areas

  • No damage to pipes

  • No reinforcing steel exposed to cut off pipes

  • Quality of concrete work/pipe joints and mortaring acceptable

  • Pipe penetrations to manholes finished off

  • Check for unsound render work

  • Converter slabs mortar bedded

  • Manhole lids to specified class requirements

  • Correct drops through manhole

  • Open cut channel section

  • Inter-allotment drainage pipes and manholes to grade, per alignment and are clean and dry

  • Correct manhole sizes, lids, locations

  • Manhole lids finished to match finished surface levels and slopes per specification

  • Subsoil drains to have end caps and frog flaps

  • Stone pitching as to specified requirements and/or other scour protection treatment

  • Headwalls/outlets compliant

  • No obvious defects in headwalls and pipe crossings

  • Pipe layout is as per the plan or approved amendments with respect to pipe size, levels and location

  • Trenches: No visual subsidence as occurred and all density tests are available and satisfactory

  • Closed circuit television (CCTV) camera inspection to demonstrate that the pipes do not sustain any premature cracking

  • Appropriate overland flow paths are provided and clear of obstruction

  • Subsoil drainage discharges to gullies or other approved point of discharge

  • Pipes are laid straight to grade and line

Additional comments

  • Additional comments relating to Stormwater Drainage

  • Earthworks

Earthworks

  • Toe of fill batters and top of cut batters are set back a minimum of 0.3m from boundary of the public space

  • Retaining walls are contained wholly within the allotments

  • Retaining walls are constructed in accordance with the approved drawings

  • Batter slopes are constructed in accordance with the approved drawings

  • Batter slopes stabilised against erosion

  • Interim drainage is constructed in accordance with approved drawings

  • Smooth transitions have been provided between new work and natural channels

  • Cut-off walls have been constructed to all concrete channel edges and outlet or inlet structures

Additional comments

  • Additional comments relating to Earthworks

  • General (strike, site cleanliness, etc.)

General

  • All disturbed areas have been topsoiled and seeded with a minimum 40% strike and/or stabilised with an approved chemical binding agent

  • Site is clean; tidy and free of rubbish, rocks, sticks, unauthorised stockpiles, etc.

  • Allotment earthworks to be free draining and generally in accordance with the approved design

  • Stormwater quality control measures in place

  • Integrity of environmentally significant areas compliant

  • Work on adjacent or balance lots to be free draining and generally cleaned and tidied

  • All areas to be mowed

Additional comments

  • Additional comments relating to General items

  • Stencil pattern concrete

Stencil Pattern Concrete

  • Level of concrete pavement joins neatly onto the AC surface and the CKC

  • Good coverage of colour hardener have been applied as per the specification

  • Two coats of protective sealer have been applied

Additional comments

  • Additional comments relating to Stencil Pattern Concrete

  • Fencing and features

Fencing and features

  • Specifically approved entrance features are constructed in accordance with the drawings

  • Sound attenuation fences are contained wholly within the allotments and constructed in accordance with the drawings

Additional comments

  • Additional comments relating to Fencing and features

  • Landscaping

Landscaping

  • Landscaping is placed as per the approved landscaping plan

  • Date irrigation system is to be removed

  • Irrigation system has been removed

  • Establishment program is implemented

Additional comments

  • Additional comments relating to Fencing and features

  • Water Quality

Water Quality

  • Implement the approved erosion and sediment control plan during construction phase

  • Water quality designs constructed to design

  • Water quality checklist provided (water by design completed)

Additional comments

  • Additional comments relating to Water Quality

  • Parks

Parks

  • Council parks officer present on inspection or has been notified that the works require a parks inspection

Additional comments

  • Additional comments relating to Parks

  • Assessing Officer (Engineer)

  • Assessing Officer (Parks Officer)

  • Consulting Engineer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.