Title Page

  • Conducted on

  • Prepared by

  • Location

RECEIVING PROTOCOL:INSPECTION TESTING AND ACCEPTANCE

SOP/ Procedure

  • 1.1 Are SOP on physical inspection of the delivery implemented?

  • 1.2 Presence of correct sampling material

  • 1.3 Are SOPs on sampling protocol of raw materials followed correctly?

  • 1.4 Are Procedure for Manual Quartering or Use of Riffler followed?

  • 1.5 Are testing and physical inspection of all incoming raw materials done?

  • 1.6 Is Feed mill compliant on sampling and testing plan and sending of raw material samples to Laboratory?

  • 1.7 Sample Retention Are: Cleanliness, Testing Equipment are all in good working condition and maintained clean, Inventory of testing materials and chemicals are practiced.

  • 1.8 Recording of Incoming raw materials with emphasis on production date( aging)

  • 1.9 Check compliance to sample retention as indicated to the guideline on sampling and testing (labeling, retention time)

  • 1.10 Unloading practices: 100% bag-to-bag sampling on Yellow corn, rice bran(for direct delivery), etc.

Sanitation

  • 1.11 Bulk receiving area cleanliness (Dump pit)

Pest Control (At Testing and Sample Retention Area)

  • 1.12 There should be no signs of infestation in the area

  • 1.13 Crawling insect control: Spraying (Twice monthly- with record)

  • 1.14 Fly control baiting: Spraying/ Paint-on (Bait station) - twice weekly (with record)

  • 1.15Rodent control baiting: Baiting- twice weekly (with record)

  • 1.16 Crawling and flying monitoring

  • 1.17 Pest control map: must be updated based on areas where baits and controls were being applied

Biosecurity

  • 1.18 Tire spray at gate: Availability of disinfectant solution of right concentration, inventory monitoring of disinfectant should be available showing the usage and preparation of the solution.

  • 1.19 Tire Spray at gate: Cleanliness

  • 1.20Foot bath at gate: Availability of disinfectant solution of right concentration, inventory monitoring of disinfectant should be available showing the usage and preparation of the solution.

  • 1.21 Foot bath at gate: Cleanliness

  • 1.22 Presence of soap (at gate)

  • 1.23Presence of clean and enough water supply (at gate)

  • 1.24 Conduct for Hand washing(entrance gate and comfort rooms) & footbath

  • 1.25 Presence of visible signage and safety warnings

RAW MATERIAL WAREHOUSE AND FACILITIES

SOP/ Procedure

  • 2.1 Stored raw material should be properly stacked on top of pallets and in safe condition.

  • 2.2 Stored raw material should be properly identified and labelled

  • 2.3 Raw materials that undergo spontaneous combustion (such as fishmeal, full fat soya, copra, etc.): Piling should observed hole @ the center and piling height of 15 sacks high maximum

  • 2.4 Temperature monitoring for spontaneous combustible raw materials(AP, FFS, Copra, etc): Warehouse temperature must be monitored

  • 2.5 STOCK SPACING BETWEEN WALLS AND RMs: must be 18 inches

  • 2.6 STOCK SPACING IN BETWEEN PILES: Space in-between piles (blocks or pallets) of different raw materials - 12inches.

  • 2.7 Presence of good lightings: 40lux min as agreed

  • 2.8 Safety: Hazardous chemicals, flammable materials must not be present at the area.

  • 2.9 : Presence of (CLEAN & FUNCTIONAL)fire extinguisher in the area with instruction

  • 2.10: Condensates from pipes, boiler lines, air-conditioning units, etc.: Should not be dripping on the stocks or on the floor

  • 2.11 Stacked raw materials near windows or building openings should be protected from direct sunlight and or moisture accumulation during sudden rain.

  • 2.12 Monitoring/Inspection of stored raw materials: production date/age monitoring record and FIFO compliance

  • 2.13 Weekly Monitoring/Inspection with record of spontaneous combustible raw material:

  • 2.14 Macro Materials Monitoring/Inspection (grading, weevil infestation) with record if more than shelf life

  • 2.15 Monitoring/Inspection of physical appearance of semi-macro, amino acids and feed additives for signs of deterioration every first week of the month on materials that are more than one (1) month old with record

Sanitation

  • 2.16 Floors, hallways/ aisles and bay area: Cleanliness

  • 2.17 Celings, walls, louvers, lighting fixtures and overhead areas: Cleanliness and free from cobwebs.Absence of drippings during rainy condition.

  • 2.18 Absence of workers personal belonging

  • 2.19 Un-used pallet condition: Placed in the designated area, maintained clean, and in safe condition

Pest Control

  • 2.20 There should be no signs of infestation in the area

  • 2.21 Crawling insect control: Spraying (Twice monthly- with record)

  • 2.22 Fly control baiting: Spraying/ Paint-on (Bait station) - twice weekly (with record)

  • 2.23 Rodent control baiting: Baiting- twice weekly (with record)

  • 2.24 Crawling and flying monitoring

  • 2.25 Pest control map: must be updated based on areas where baits and controls were being applied

Biosecurity

  • 2.26 All warehouse entrance/ exit: must have functional bird proofing nets

  • 2.27 Warehousing roofing and other building opening: must have functional bird proofing nets

  • 2.28 Foot bath at gate: Availability of disinfectant solution of right concentration, inventory monitoring of disinfectant should be available showing the usage and preparation of the solution.

  • 2.29 Foot bath at gate: Cleanliness

  • 2.30 Presence of visible signage and safety warnings

3. LIQUID INGREDIENT STORAGE AREA AND FACILITIIES

COCONUT OIL STORAGE AND PRODUCTION DOSING SYSTEM

SOP/Procedure

  • 3.1 Storage tanks and dosing system properly identified: should be properly identified - Clear and readable. Temporary identification like Paper will not be honored

  • 3.2 Manual Dosing System Calibration: Should be calibrated every six months(with calibration records) or should be calibrated whenever there are changes in the system that could affect the ingredients density/ volume or its inclusion in the finished feeds. Calibration marking should be clear.

  • 3.3 Dosing system verification: daily verification of dosing system should be done

  • 3.4 Calibration/verification by-passed oil: Oil used in calibration/verification/by-passed should be returned/consumed within 24hrs.

  • 3.5 Presence of good lightings @ Dosing System: Lightings should be adequate.(220lux GMP recommended lighting for working area).

Sanitation

  • 3.6 Storage tanks and Surrounding area Cleanliness:

  • 3.7 Dosing System and Surrounding area Cleanliness:

CRUDE PALM OIL STORAGE AND PRODUCTION DOSING SYSTEM

  • 3.8 Storage tanks and dosing system properly identified: should be properly identified - Clear and readable. Temporary identification like Paper will not be honored

  • 3.9 Manual Dosing System Calibration: Should be calibrated every six months(with calibration records) or if RM changes occur Calibration marking should be clear.

  • 3.10 Should have daily dosing system verification

  • 3.11 Oil used in calibration/verification/by-passed should be returned/consumed within 24hrs.

  • 3.12 Storage tanks and Surrounding area Cleanliness:

  • 3.13 Dosing System and Surrounding area Cleanliness:

OTHER LIQUID INGREDIENTS (MOLASSES ETC.)

SOP/Procedure

  • 3.14 Storage tanks and dosing system properly identified: should be properly identified - Clear and readable.

  • 3.16 Manual Dosing System Calibration: Should be calibrated every six months(with calibration records) or if RM changes occur Calibration marking should be clear.

  • 3.17 Should have daily dosing system verification

  • 3.18 Oil used in calibration/verification/by-passed should be returned/consumed within 24hrs.

  • 3.19 Presence of good lightings

Sanitation

  • 3.20 Storage tanks and Surrounding area Cleanliness

  • 3.21 Dosing System and Surrounding area Cleanliness

Pest Control (ALL LIQUID STORAGE AND DOSING AREA)

  • 3.22 There should be no signs of infestation in the area

  • 3.23 Crawling insect control: Spraying (Twice monthly- with record)

  • 3.24 Fly control baiting: Spraying/ Paint-on (Bait station) - twice weekly (with record)

  • 3.25 Rodent control baiting: Baiting- twice weekly (with record)

  • 3.26Crawling and flying monitoring

  • 3.27 Pest control map: must be updated based on areas where baits and controls were being applied

4. VITAMIN/ MINERAL/PREMIX/ MEDICATION AREA

VITAMIN/ MINERAL/PREMIX/ MEDICATION STORAGE AREA

SOP/Procedure

  • 4.1 Stored premixes properly stack on top of pallets

  • 4.2 Stored premixes properly identified/ labelled

  • 4.3 Monitoring/ Inspection of vitamins: Weekly with record

  • 4.4 Monitoring/Inspection: Semi-Micro- every first week of the month on materials that are more than one (1) month old with record

  • 4.5 Physical quality of premixes is intact: Not aged stocks, bags not damaged, partially used bagged premixes was properly sealed

  • 4.6 Stocks spacing (vitamins): 6 inches between wall and stocks.

  • 4.7 Stocks spacing(medications,& mineral premixes): 12 inches between wall and stocks.

  • 4.8 Presence of good lightings

  • 4.9 Room Temperature should be 20deg.C. (+/-5deg. C)

Sanitation

  • 4.10 Floors, hallways/ aisles and bay area: Cleanliness

  • 4.11 Celings, walls, louvers, lighting fixtures and overhead areas: Clean and free from cobwebs. Absence of drippings during rainy condition.

  • 4.12 Absence of workers personal belonging

  • 4.13 Un-used pallet condition: Placed in the designated area, maintained clean, and in safe condition

VITAMIN/ MINERAL PREMIX/ MEDICATION PREPARATION AREA

SOP/Procedure

  • 4.14 Presence of good lightings: Lightings should be adequate.(220lux GMP recommended lighting for working area).

  • 4.15 Batched/prepared premix materials: Properly identified

  • 4.16 Stacking of batched premix materials: on top of pallets

  • 4.17 Batched/prepared premix materials: properly weighed

  • 4.18 Packaging materials / empty sacks: Should be properly arranged in its designated area.

  • 4.19 Weighing Scale: daily verification

  • 4.20 Weighing Scale: Std. test weights calibration

  • 4.21 Weighing Scale: free from accumulated dirt

  • 4.22 Weighing Scale: working properly

  • 4.23 Availability of on-used Formulation

  • 4.24 Scoops and premix container @ Preparation Area: present every bin and properly identified

  • 4.25 Scoops and premix container @ Preparation Area: free from caking material

Sanitation

  • 4.26 Preparation area Cleanliness:

  • 4.27 Workers personnel belongings

PEST CONTROL AT VITAMIN OR PREMIX STORAGE AND PREPARATION AREA

  • 4.28 Pest Infestation

  • 4.29 There should be no signs of infestation in the area

  • 4.30 Crawling insect control: Spraying (Twice monthly- with record)

  • 4.31 Fly control baiting: Spraying/ Paint-on (Bait station) - twice weekly (with record)

  • 4.32 Rodent control baiting: Baiting- twice weekly (with record)

  • 4.33 Crawling and flying monitoring

  • 4.34 Pest control map: must be updated based on areas where baits and controls were being applied

  • 4.35 All warehouse entrance/ exit: must have functional bird proofing nets

  • 4.36 Warehousing roofing and other building opening: must have functional bird proofing nets

  • 4.37 Foot bath at gate: Availability of disinfectant solution of right concentration, inventory monitoring of disinfectant should be available showing the usage and preparation of the solution.

  • 4.38 Foot bath at gate: Cleanliness

  • 4.39 Presence of visible signage and safety warnings

5. PRODUCTION AREA AND FACILITIES

BATCHING SECTION ( MACRO/ SEMI-MACRO)

SOP/Procedure

  • 5.1 Packaging (Used and Damaged )

  • 5.2 Spillages promptly collected

  • 5.3 Availability of on-used Formulation

  • 5.4 Test Weight checking done on weighing scales and in good condition

  • 5.5 Raw material weighing, identification, and recording

  • 5.6 Weighing Scales cleanliness

  • 5.7 Lighting: 220 Lux or Should be enough

Sanitation

  • 5.8 Walls, Ceilings, and Floor: Cleanliness

  • 5.9 Orderliness of the Batching Area

  • 5.10 Presence of receptacle

DIRECT POURING/ HAND TIPPING SECTION

SOP/Procedure

  • 5.11 Weighed raw material Identification

  • 5.12 Packaging (Used and Damaged ): Should be properly arranged

  • 5.13 Spillages promptly collected

  • 5.14 Intake screen

  • 5.15 Dosing sequence

  • 5.16 Poured Raw Materials monitoring

  • 5.17 Lighting

  • 5.18 Presence of receptacle

Sanitation

  • 5.18 Presence of receptacle

  • 5.19 Foreign Materials

SIFTER SECTION

SOP/Procedure

  • 5.20 Screen must be in good condition

  • 5.21 Contraption is in good condition

  • 5.22 Un-used contraption: Clean, arranged and well identified

  • 5.23 Damaged/for Repair contraption: properly identified and separated

  • 5.24 Preventive maintenance

Sanitation

  • 5.25 Dirt/Foreign Materials: Must not be present

GRINDING SECTION (HAMMER MILL)

SOP/Procedure

  • 5.26 Hammer Mill Screens : properly installed

  • 5.27 Stored Screens must be arranged and identified per screen size and cleaned ready-to-use

  • 5.28 Damaged Hammer Mill Screen: must be separated and identified

  • 5.29 Dust Collector: well functioning

  • 5.30 Preventive maintenance

MIXING SECTION

SOP/Procedure

  • 5.31 Correct dosing sequence

  • 5.32 Mixer Shafting: Good operating condition

  • 5.33 Mixer Motor: Good operating condition

  • 5.34 Mixer Interior (Ribbon/Paddle, Walling, Liquid Dosing Spray Nozzle): Clean

  • 5.35 Preventive maintenance

Sanitation

  • 5.36 Mixer Area cleanliness

CONDITIONING SECTION

SOP/Procedure

  • 5.37 Conditioner Steam: No leakage

  • 5.38 Preventive maintenance

Sanitation

  • 5.39 Cleanliness

HYGIENIZING SECTION

SOP/Procedure

  • 5.40 Hygienizer Steam

  • 5.41 Preventive maintenance

Sanitation

  • 5.42 Cleanliness

PELLET MILL SECTION

SOP/Procedure

  • 5.43 Pellet Mill Die: Not worn out

  • 5.44 Pellet Mill Die : correct die

  • 5.45 Safety: Absence of hazardous chemicals, flammable materials

  • 5.46 Lighting

  • 5.47 Preventive maintenance

Sanitation

  • 5.48 Cleanliness

COOLING SECTION

SOP/Procedure

  • 5.49 Cooler functioning properly.

  • 5.50 Preventive maintenance

Sanitation

  • 5.51 Cleanliness

CRUMBLING SECTION

SOP/Procedure

  • 5.52 Lighting

  • 5.53 Preventive maintenance

Sanitation

  • 5.54 Cleanliness

FEEDS BAGGING AREA

SOP/Procedure

  • 5.55 Weighing Scales cleanliness

  • 5.56 Weighing scales condition

  • 5.57 Packaging Materials: properly arranged

  • 5.58 Spillages: must be promptly collected

  • 5.59 Packaging usage: Designated packaging materials used for every feed type

  • 5.60 Feed Tags: Correct Tags used per feed type with correct production date

  • 5.61 Lighting

  • 5.62 Preventive maintenance

Sanitation

  • 5.63 Feeds Bagging Area cleanliness

IN PROCESS CONTROL

SOP/Procedure

  • 5.64 Flushing protocol compliance

  • 5.65 Mixing Time compliance

  • 5.66 Alarms/Signals/Indicators: Well Functioning

  • 5:67 Reference/Display Sample Compliance

  • 5.68 First & Last Bag protocol Compliance

  • 5.69 Particle Size testing/monitoring

  • 5.70 Inspection and cleaning of magnets per shift.

  • 5.71 Weekly Inspection and cleaning of Grain Cleaner / Sifter with record

  • 5.72 Weekly Inspection and cleaning of all dust collector with record

PEST CONTROL: WHOLE PRODUCTION AREA

  • 5.73 Crawling insects control

  • 5.74 Fly Control

  • 5.75 Crawling and Flying insects monitoring

  • 5.76Rodent Control

  • 5.77 Rodent Control

BIOSECURITY WHOLE PRODUCTION AREA

  • 5.78 All warehouse entrance exit (Bird Proofing)

  • 5.79 Warehouse roofing and other building opening (Bird Proofing)

  • 5.80 Presence of disinfectant solution/ anti-virucidal agent (Foot Bath)

  • 5.81 Cleanliness (Foot Bath)

  • 5.82 Signage's: Safety & Warning Signs

6. FINISHED FEEDS WAREHOUSE AND FACILITIES

SOP/ Procedure

  • 6.1 Stacking: Should be properly stacked on top of pallets, in safe condition (stacking height: For big WH - 3 pallets high, For small WH - Half of the roofing hieght);

  • 6.2 Identification

  • 6.3 Un-used pallets: placed in the designated area, maintained clean, and in safe condition

  • 6.4 Stocks spacing

  • 6.5 Presence of good lightings and with adequate ventilation:

  • 6.6 Hazardous and flammable chemicals/ materials: Should be none

  • 6.7 Finished feeds stacking: Stacked finished feeds near windows or building openings should be protected from direct sunlight and or moisture accumulation during sudden rain.

  • 6.8 Condensates from pipes, boiler lines, air-conditioning units, etc.

Sanitation

  • 6.9 Floors, hallway/ aisles and bay area: Cleanliness

  • 6.10 Ceiling, walls, louvers, lighting fixtures and overhead areas: absence of cobwebs and drippings during heavy rain

  • 6.11 Workers personnel belongings

Pest Control

  • 6.12 Pest Infestation

  • 6.13 Crawling insects control

  • 6.14 Fly Control

  • 6.15 Crawling and Flying insects monitoring

  • 6.16 Rodent Control Baiting

  • 6.17 Rodent Control Monitoring

  • 6.18 Pest Control Map

Biosecurity

  • 6.19 All warehouse entrance exit:

  • 6.20 Warehouse roofing and other building opening:

  • 6.21 Presence of disinfectant solution/ anti-virucidal agent (Foot Bath)

  • 6.22 Cleanliness (Foot Bath)

  • 6.23 Signage's: Safety & Warning Signs

7. PACKAGING AREA

SOP/ Procedure

  • 7.1 Stacking: Should be properly stacked on top of pallets and in safe condition. Should be identified for easy traceability

  • 7.2 Spacing

  • 7.3 Presence of good lighting

  • 7.4 Safety (Hazardous chemicals, flammable materials)

  • 7.5 Used sacks sorting and warehousing: Proper warehousing implemented,should be stored on the designated area

  • 7.6 Used sacks sorting and warehousing: Spillages/Sweepings promptly collected

Sanitation

  • 7.7 Cleanliness

Pest Control

  • 7.8 Pest Infestation

  • 7.9 Crawling insects control

  • 7.10 Fly Control

  • 7.11 Crawling and Flying insects monitoring

  • 7.12 Rodent Control Baiting

  • 7.13 Rodent Control Monitoring

  • 7.14 Pest Control Map

8. OTHERS

Sanitation

Roadway (inside feed mill compound; not applicable for feeds depot wherein delivery trucks were not permitted inside the warehouse)

  • 8.1 Absence of accumulated dirt, foreign materials & infestation:

  • 8.2 Excessive oil spillages from vehicles:

Office

  • 8.3 Cleanliness/housekeeping :

  • 8.4 Trash/Garbage bin:

Truck scale area

  • 8.5 Cleanliness

Pest Control: Warehouse perimeter, Office, truck scale area, Canteen

  • 8.6 Pest Infestation

  • 8.7 Crawling insects control

  • 8.8 Fly Control

  • 8.9Crawling and Flying insects monitoring

  • 8.10 Rodent Control: Baiting

  • 8.11Rodent Control: Monitoring

  • 8.12 Pest Control Map: Must be updated

Biosecurity

Personal Hygiene

  • 8.13All wearing clean outer garments(uniform tshirt), FACE MASKS, FACE SHIELD and facial hair and fingernails properly trimmed.

Toilets (Visitors & Feed Mill Personnel's)

  • 8.14 Presence of soap and clean water supply

  • 8.15 Cleanliness

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.