Information
-
Document No.
-
Audit Type
-
Engineer
-
Line Manager
-
Business Unit
-
Client / Site
-
Work Area
-
Task
-
Conducted on
-
Prepared by
-
Grade
Health, Safety and Enviroment Compliance
-
Risk Assessment
-
Method statement
-
Code of practice
-
Waste disposal
-
Work equipment and hand tools
-
PPE
-
Exclusion of third parties
-
Permit to work
-
Safe isolation
Procedures
-
Signing in
-
Uplift CAFM documents
-
Return CAFM documents
-
Engineers report sheets correctly completed
Quality Compliance
-
Materials
-
Workmanship
-
Programme
Gas Safety
-
Documentation
-
Current Gas Safe ID card available?
-
Technical Operational Procedures available?
-
Technical Bulletins available and up to date?
-
Work records completed corectly?
-
Manufacturers instructions available and accessed?
-
Ventilation
-
Visual check on ventilation and any defects noted.
-
Is the ventilation route, and construction correct?
-
Has the ventilation been measured
-
Is the existing ventilation adequate?
-
If mechanical ventilation is it interlocked?
-
Flue
-
Visual inspection completed and any defects noted.
-
Is the flue size, route, construction and termination correct?
-
Are the correct support clips used?
-
Have all flue in voids been inspected and are hatches available?
-
Flue Flow check completed corectly?
-
Spillage check completed correctly?
-
Gas
-
Installation line diagram available and up to date?
-
Visual inspection of gas installation recording any defects.
-
Installation label, pipe size, route, support, isolation valves corect?
-
Are pipe ducts correctly vented?
-
Tap to enter information
-
Tap to enter information
-
Tap to enter information
-
Tap to enter information
-
Tap to enter information
-
Tap to enter information
-
Tap to enter information