Survey Date & Location

  • Conducted on

  • Site Name

  • Location
  • Prepared By

Site Overview

  • Add annotated screenshot of Google Maps or photo of PIA map showing block / building locations and names.

  • List all blocks and detail number of floors/units within each block.

  • What is the total number of units at this Site?

Comms Rack

  • Take Photos to show where the Comms Rack will be located. Dimensions are 60cmx60cmx45cm. Provide the following Notes: Which Block the Rack is to be installed in. Which floor the Rack is to be installed on. Which Room/Cupboard. E.g. "Comms Rack to be installed in The Cedars in the first floor electrical plant room."

  • Add Photos to show how the main fibre will be routed from incoming BT ducting to the Comms Rack. Provide notes detailing the route.

  • Add Photos to show how power will be provided to the Comms Rack. Take a photo of the consumer unit with cover lifted to show any spare fuses and then photos of a route from the consumer unit to the Comms Rack position.

  • Add Photos to show how the Fibre will link from the Comms Rack to the risers or flats. Provide notes detailing the route.

Building 1

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 2

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 3

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 4

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 5

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 6

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 7

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 8

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 9

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 10

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 11

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 12

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 13

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 14

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

Building 15

Overview

  • What is the Name / Number Range for this Building

  • Take Overview Photos of the Outside of the building and any signage outside signage.

BT Lead Ins

  • Take Photo of the BT Chamber location for this block, showing the block location in relation to the chamber.

  • Take photos of the BT entry point and DP within the block and add notes to say where this is located. e.g. "ground floor riser cupboard" or "under stairs cupboard"

Plant Rooms / Utility Cupboards

  • Does the Building have Riser Cupboards?

  • Provide Photos and notes of the plant rooms / riser cupboards within building.

Cable Routes

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

  • Take Photos detailing Invisilight cable routes, starting from Riser cupboard/comms rack/splitter box position and working out towards the last flat on cable run. Show the positions of any walls/doors that will need to be drilled through. Add Notes to say which floor/block this relates to.

  • Is there a suspended Ceiling on this floor?

  • Is the Suspended Ceiling accessible?

  • Take a photo of above the suspended ceiling to show if there are cable trays.

Building Layout

  • Describe Block Layout - ie how many floors, flats per floor, total number of flats.

  • Take Photos of any internal signage detailing building layout or flat locations.

  • Add Floor Plan of Building. Mark up the location of: Entrances and Exits, Stairs, Riser Cupboards, Plant Rooms, Flats, Internal Doors. Label the flat numbers on each floor.

undefined

Advertisement Screen

  • Is there space within the communal areas of the building to install a 43" Digital Screen?

  • Add a photo showing the suitable location for a Digital Screen to be installed, describe the location and provide details of where the closest power supply is and if there are any windows in the vicinity.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.