Information

  • Document No.

  • Audit Title

  • Client/Site

  • Conducted on

  • Prepared by

  • Location
  • Please select either, Crew Leader/Supervisor, or

  • Contractor

  • Mat. Code

  • Workgroup

1. Site Risk Management

  • Are relevant SWMS available and a Daily Pre Start completed for the work?

  • Has the Pre Start identified site specific risks, been signed and dated by all crew members and have SWMS for the task been identified?

  • Are all identified risk control measures on SWMS and Pre Start assessment in place?

  • Have sub-contractors and site visitors been inducted onto the site and signed onto the Daily Pre Start?

  • Has the Traffic / Pedestrian Management Plan been identified / created and available on site and documented on the Pre Start?

  • Overall, is the site risk assessment / Pre Start adequate for the worksite?

2. Environment & Hazardous Goods

  • Are environmental risks identified in the SWMS/Pre Start and controlled on site?

  • Are there any chemicals in use and is there a current SDS available for the chemical?

  • Are any hazardous materials and dangerous goods separately stored and labelled?

  • Are there any control measures to manage spills and leaks? (e.g. spill kit)

3. Skills and Competency

  • Are all personnel trained licensed / registered for their functional role?

  • Do subcontractors hold appropriate qualifications?

4. Forms/Documentation

  • Is there a job file available on site?

  • Does the job file contain a daily job sheet / work instruction?

  • Does the job file contain current Dial before You Dig information?

  • Does the job file contain a sequence of operations? (gas works)

  • Does the job file contain design drawings?

  • Is a Pipeline Inspector on site or required to be on site?

  • Is a hot work permit required and are there any hot work restrictions?

  • Is a Confined Space permit required and are crew members involved in CSE signed onto the permit?

  • Is a Road Opening Permit required and is it on site?

  • If the intention is for trenches to be greater than 1.5m deep has the "Trenching notification" been submitted to Work Safe?

5. Traffic and Pedestrian Management

  • Has the appropriate Traffic and Pedestrian Management Plan been identified, and does it meet all requirements?

  • Does the actual traffic / pedestrian layout reflect the Traffic / Pedestrian Management Plan?

  • Is pedestrian traffic safely controlled through the worksite?

  • Are traffic signs and devices legible and undamaged?

  • Are suitable barriers provided to protect the public from the work site?

  • Where site is to be left overnight, are adequate protection measures, lighting and night guidance provided?

6. Personnel Protective Equipment

  • Is PPE in accordance with site requirements?

  • Is required PPE within inspection or replacement dates?

  • Is other appropriate PPE utilised as required and in good condition? (e.g. Harness, Life lines etc.)

  • Is PPE in an adequate condition?

7. Vehicles/Plant

  • Are all plant operators licensed as required?

  • Are logbooks available for all plant on site and have they been maintained appropriately?

  • Have pre-start checklists been completed?

  • Are all vehicles on site registered?

  • Are all vehicles/plant within their service range?

  • Are all vehicles/plant in acceptable condition in terms of cleanliness? What is the general condition of the vehicles/plant (cleanliness)?

  • Is all equipment carried on vehicles adequately secured?

8. First Aid

  • Is there an intact First Aid kit?

  • Is the kits location marked on the vehicle?

  • Do the contents appear to be complete, in good condition and within expiry dates?

10. Tools and Equipment: Testing and Condition

  • Are all electrical tools, generators, leads, RDCs tagged and within their test date range?

  • Is Poly Fusion equipment within calibration dates?

  • Is the gas detector within calibration date?

  • Are Oxygen analysers within calibration date?

  • Is the voltage tester fit for purpose and tested prior to use?

  • Is Oxy acetylene equipment in good condition and within test date? (AS 4839 section 8)

  • Are the gas bottles within expiry date and stored appropriately?

  • Is lifting equipment in good condition and within test date?

  • Is fire extinguisher charged and within test dates?

11. Worksite/Work Practices

  • Are there an appropriate number of trained and competent crew members on site for task?

  • Are Effective Safety Observers in place?

  • Are No-Go Zones being adhered to?

  • Has pipework been tested for stray current?

  • Are cross bonding leads required and used?

  • Are the appropriate numbers of fire extinguisher/s on site and placed in appropriate locations?

  • Have other authority assets been located and / or exposed by hand prior to mechanical excavation?

  • Are all gas grid materials stored to prevent damage or deterioration?

  • Have standards (including covers, clearances, offsets and bedding materials) been maintained?

  • Are stop off of Mains and Services methods in line with client procedures?

  • Is the site tidy with no obvious tripping or other hazards?

  • Are trenches appropriately battered / shored?

  • Is spoil placed in excess of 0.5 from excavation wall?

  • Is a ladder or steps used to access excavation?

  • Is confined space rescue equipment on site and set up as required?

  • Are pits / man holes protected to prevent falls?

  • Does reinstatement and compaction meet VicRoads, Local Council and property owner’s requirements?

12. Housekeeping

  • Is crush rock laid, level and compacted?

  • Is there any evidence of debris or rubbish?

  • Is there any evidence of subsidence in compound and around entry exit points?

  • Is the interior of compound clear of fire hazards and tidy?

  • Is the exterior of compound clear of fire hazards and tidy?

  • Is fire protection in place? Are fire extinguishers in place and within test dates?

  • Is there acceptable security of compound fence and gates?

  • Are warning signs and emergency contact details in place with current information?

  • Are PPE signs in place?

  • Are Silt traps in place?

  • Is refuelling of equipment in line with EMP?

  • Are there effective erosion and / or sediment controls in place?

  • Has waste been segregated for reuse / recycle / disposal as per EMP?

  • Is Waste Water treated and disposed of as per EMP?

  • Is material containing Asbestos treated as per EMP and VWCA 2007 OHS regulations?

  • Has flora, fauna and culture heritage issues been identified and controlled as per EMP?

  • Is spoil removed from site tested and disposed of in line with EPA requirements and are certificates available?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.