Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
1. DIVISION
-
Division
- 1. Water Treatment Plant
- 2. Sewage Treatment Plant
- 3. Incinerator Operation
- 4. Travel Time
- 5. Install
- 6. Commissioning
- 7. Rentals
2. TASK TO BE PERFORMED
-
Task
- Site Check / Sampling / Maintenance
- Install / Move / Tear Out / Drain Field
- Shop
- Other
3. HAZARDS
-
3.1 Biological / Chemical / Gas Hazards
-
3.2Confined Space Hazards
-
3.3 Electrical Hazards
-
3.4 Grinding / Cutting Hazards
-
3.5 Heavy / Awkward Lifting Hazards
-
3.6 Height Hazards
-
3.7 Ladder Hazards
-
3.8 Moving Equipment Hazards
-
3.9 New Worker / Task Hazards
-
3.10 Noise Hazards
-
3.11 Other Work In Area Hazards (Workers)
-
3.12 Pinch Point / Swing Path Hazards
-
3.13 Prolonged Twisting / Bending Hazards
-
3.14 Rotating Machinery Hazards
-
3.15 Sharp Object Hazards
-
3.16 Slip / Trip / Fall Hazards
-
3.17 Tool Hazards
-
3.18 Travel Hazards
-
3.19 Visibility Hazards
-
3.20 Weather / Temperature Hazards
-
3.21 Working Alone Hazards
-
3.22 Other Hazards
-
Description & Response
-
Take Pictures Of Hazards At Work Site So Control Measures Can Try To Be Made To Eliminate In Future
All workers must sign onto FLHA prior to work commencing. If any new workers show up onto site they must review this FLHA and sign on as we'll.
-
Lead Supervisor / Company
-
Worker Name / Company
-
Worker Name / Company
-
Worker Name / Company
-
Worker Name / Company
-
Worker Name / Company
-
Worker Name / Company
-
Worker Name / Company
-
Worker Name / Company
-
Worker Name / Company
-
Worker Name / Company