Title Page

  • Company Inspected

  • Other Company

  • Foreman/Lead

  • Additional Personnel

  • Location
  • Date and Time

  • Inspector Name

  • Summery of what was observed:

Element A0: General

  • PPE OK?

  • OQ verified and appropriate for Task(s)?

  • Do they have valid 811 Ticket?

  • Are utilities marked?

  • Current OMC Manual available?

Element A1: Worksite Setup/Appearance & Presentation

  • Picture ID card

  • First aid kit onsite?

  • Fire extinguisher available (as required)

  • Proper warning sign placement/work zone setup

  • Appropriate use of barricading, cones and excavation protection

  • Flaggers in use (as required)

  • Required flagging certificate available

  • Traffic Control Adequate

  • Required permits

  • Proper load securement

  • Material Handling Adequate

  • Non-qualified individuals properly directed

  • Property damaged observed

  • Appropriate removal of excess material/debris

  • Any additional follow-up required

Element A2: Instrument Check

  • Equipment used

  • All equipment calibration(s) verified up to date

  • Was proper equipment startup procedure followed

  • Any additional follow-up required

Element A3: Proper Locating Practices

  • Locate marks are clear and accurate

  • Appropriate method was used to complete locate (.eg., direct, indirect, or measurement)

  • All FPU underground facilities marked in proposed work zone as shown on as-built

  • Excessive marking (e.g., on retaining walls aggregate driveways and decorative shrubs)

  • Was locate completed within required timeframe

  • Were appropriate follow-up and communication made

  • Any additional follow-up required

Element A4: Monitoring 3rd Party Excavations

  • Proper stand-by procedures followed

  • Properly inspects exposed underground pipe

  • Appropriately repairs pipe coating

  • Any additional follow-up required

Element A5: Emergency Response

  • Parked vehicles in safe locations(s)

  • Conducted a thorough initial assessment

  • Started leakage instrument before entering scene

  • Eliminated ignition sources

  • Took readings at appropriate locations

  • Evacuated as appropriate

  • Communicated and coordinated fire department assistance

  • Set and maintained required perimeter based on readings

  • Continued to monitor gas readings

  • Communicated with customers/other parties

  • Provided event status updates to DISPATCH or SUPERVISOR as needed

  • Communicated with FPU resources as they arrived

  • Safe Zone Huddle conducted

  • Incident Commander identified

  • Emergency response documentation appropriately completed (duplicated with documentation)

  • Any additional follow-up required

Element A6: Leak Survey Practices

  • Takes reading at appropriate locations

  • All required facilities surveyed

  • Properly surveys and classifies atmospheric corrosion

  • Survey completed by completed by compliance due date

  • Properly classifies leaks

  • Proper survey procedures followed

  • Any additional follow-up required

Element A7: Documentation

  • Accurate completion of as-builts, services cards and valve cards

  • Additional forms/reports completed accurately, as required

  • Accurate pressure test information documented

  • Pipe condition noted

  • Corrosion reading (as required)

  • Meter information accurately recorded

  • Proper brochures, stickers, tags or signs left as required

  • Emergency response documentation appropriately completed

  • Any additional follow-up required

Element B1: Excavation and Backfill

  • Locates present or locate number (as required)

  • Locates maintained throughout job

  • Were proper methods used to expose utilities

  • Shoring in use (as required)

  • Appropriate backfill material used

  • Buffer zones maintained

  • Spotter in use (as needed)

  • Acceptable excavation restoration

  • Appropriate use of ladder(s)

  • Proper procedures followed

  • Any additional follow-up required

Element B2: Installation and Maintenance of Pipe

  • Visual pipe inspection for damage and corrosion

  • Holiday detector used on steel pipe

  • Approved mechanical pull head used on pullback

  • Proper sealing of casing

  • Test leads installed (as required)

  • Anode installed (as required)

  • Tracer wire appropriately installed

  • Appropriate wire connection methods used

  • Proper locate marks left on jobsite

  • Continuity of tracer wire verified with locator

  • Air test at appropriate pressure and duration

  • Proper support of pipe

  • EFV installed (as required)

  • Riser appropriately positioned

  • Appropriate materials used

  • Depth standards met

  • Separation standards met (e.g., other utilities)

  • Were appropriate steps taken to protect exposed pressurized pipe

  • Proper procedures followed

  • Operated valve verifying stops are in placd

  • Any additional follow-up required

Element B3: Stopping Flow/Bypassing/Purging

  • Written procedures available and followed on job site (as required)

  • Pre-job procedure review completed

  • Feed check performed (as required)

  • Appropriate by-pass procedures followed (as required)

  • Proper stopping gas flow procedures followed

  • Appropriate static control methods used

  • Proper purging procedure followed

  • Proper procedures followed

  • All changed documented (as required)

  • Any additional follow-up required

Element B4: Fused Connections

  • Fusion Type

  • Proper pipe preparation

  • Appropriate iron temperature

  • Acceptable configuration (line up)

  • Proper location of fittings in relation to other fittings

  • Appropriate cooling time observed

  • Acceptable visual appearance

  • Appropriate tapping procedures followed (as required)

  • Signature (fused connection)

  • Proper stencil and markings (e.g., stab depth, pipe preparation marks) present

  • Proper pipe restraint used

  • Soap test performed

  • No leakage found or appropriately addressed

  • Proper procedure followed

  • Any additional follow-up required

Element B5: Mechanical Connections

  • Describe Fitting Manufacturer and Model

  • Proper pipe preparation

  • Proper tooling used (e.g., chamfer, stab depth or torque wrench)

  • Correct torque setting used

  • Appropriate tapping procedures followed (as required)

  • Appropriate pipe coating used

  • Holiday detector used on repaired/new coating

  • Soap test performed

  • No leakage found or appropriately addressed

  • Proper procedures followed

  • Any additional follow-up required

Element B6: Welded Connections

  • Proper pipe/fitting preparation

  • Acceptable visual appearance of weld

  • Appropriate tapping procedures followed ( as required)

  • Soap test performed

  • Appropriate pipe coating

  • Holiday detector used on new or repaired coating

  • No leakage found or appropriately addressed

  • Proper procedures followed

  • Any additional follow-up required

Element C1: Meter Sets/Pressure

  • Proper handling/storage of meters observed

  • Design standards met

  • Meter properly supported

  • Acceptable meter location

  • Regulators set and functioning properly

  • Regulator properly vented

  • Appropriately painted (as required)

  • Access flow valve tag on meter set

  • FPU sticker on meter set

  • Leak test performed

  • No leakage found or appropriately addressed

  • Meter/meter components functioning properly

  • Relief set and functioning properly

  • Meter instrument functioning properly (e.g., corrector/ES3)

  • Meter removal procedure followed

  • Rotary meter installation procedures followed

  • Inlet valve operable

  • Filter/Strainer maintenance performed

  • By-pass locked as necessary

  • Sensing lines locked as necessary

  • Proper procedures followed

  • Any additional follow-up required

Element 2: District and Service Regulators Installation, Activation and Maintenance

  • District Regulator Station

  • Throttle inlet valve to clear debris from line and purge

  • Pilot regulators correctly installed

  • Proper bypass procedure followed

  • Relief set and functioning properly

  • Relief sensing lines locked in open position

  • Regulators set and functioning properly

  • Sense lines returned to normal position

  • Soap test performed (Leak test performed)

  • Appropriately painted or referral made (as required)

  • Appropriately valves operated or referral made (as required)

  • No leakage found or appropriately addressed

  • Appropriate protection installed or referral made (e.g., bollard, guardrail, fence)

  • Regulator properly vented

  • Proper procedures followed

  • Any additional follow-up required?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.