Information

  • PM No.

  • Ready to Invoice?

  • Notification No.

  • Location # (Separate by comma if multiple)

  • Division

  • Address
  • MAT

  • Contractor

  • Crew Foreman Name

  • Field Inspector

  • Construction Completed On

  • QA Inspection Completed On

  • Field Inspection Performed?

  • Submission number

Quality Control Inspection - Field Only

  • 1. Is the scope of work 100% complete? If work is remaining, check "No" and list the items needing to be completed in Notes.

  • 2. Is the completed work free of quality issues? If quality issues are present, check "No" and list the issues in Notes.

  • 3. Is the job built per the OH/UG Standards? If the construction is not in compliance with the standards, check "No" and list the issues below.

  • 4. Are any changes to the original design reflected in the submitted as-builts, crew instructions, materials, joint pole forms, circuit map change sheets, etc. If the field conditions are not accurately reflected in the closeout package, check "No" and list the issues below.

  • 5. Has a Construction Completion Standard Checklist (CCSC) been submitted for every significant facility? Are the forms filled out completely and accurately? If there are forms missing or the information on a submitted form is incomplete/inaccurate, check "No" and list the issues below.

  • Select OH and/or UG CCSC.

  • Select OH CCSC Issue/Issues

  • Select UG CCSC Issue/Issues

  • 6. Has all required permanent restoration been completed? (Examples: Concrete, Asphalt, Sunken Box or Pole Hole etc.)

  • 7. Add a minimum of 3 pictures of each location. (Bottom Half, Top Half, Whole Pole)

  • Reviewer's Signature

Document Review

  • 1. Are any changes to the original design reflected in the submitted as-builts, crew instructions, materials, joint pole forms, circuit map change sheets, etc?

  • 2. Is the job built per the OH/UG Standards? If the construction is not in compliance with the standards, check "No" and list the issues below.

  • 3. Electric Equipment/Pole Information is complete?

  • 4. Crew Foreman Sign-Off is complete (this includes Actual Circuit Feet Installed and confirmation of what condition the job was left in (ex: Built as Designed, Redlined, Feedback Form Completed, etc.)?

  • 5. Electric Corrective (EC) Notification is complete (all applicable check boxes addressed, LAN ID or full name, signed and dated)?

  • 6. Joint Pole documentation is complete. Forms are redlined as applicable?

  • 7. Construction Drawings are complete. Drawings are redlined as applicable?

  • 8. Is the Circuit Map Change Sheet complete? Are changes redlined as necessary?

  • 9. Has a Construction Completion Standard Checklist (CCSC) been submitted for every significant facility? Are the forms filled out completely? If there are forms missing or the information on a submitted form is incomplete, check "No" and list the issues below.

  • 10. Color photos are included for every location on the job?

  • Final Deliverable Review (Paperwork Only) - Total Number of Non-Conforming Items

  • Reviewer's Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.