Information

  • Audit Title - Weekly Internal Safety Inspection Report

  • Document No.

  • Client - Hallas / Site - Chatham Square - Reading

  • Conducted on

  • Mark Henderson

  • Location

Welfare

  • Canteen acceptable <br>

  • Toilets acceptable

  • Washing facilities acceptable

  • Drying room acceptable

  • Offices acceptable

  • Drinking water and cups available

Fire

  • Fire assembly point displayed

  • Fire extinguishers available

  • LPG use and storage satisfactory

  • Any fire alarm testing done

  • Emergency / Temporary lighting satisfactory

PPE being used in accordance with site method statements

  • Scaffolders

  • Renderers

  • Cladding operatives

  • Harnesses in date

First aid

  • Accident book satisfactory

  • Contents of first aid box satisfactory

  • First aid notices satisfactory

  • Any reportable incidents

Health and safety documentation

  • F10/insurance satisfactory

  • Site signage satisfactory

  • First aid register / book satisfactory

  • Inductions up to date

  • Visitors records satisfactory

  • H&S plan satisfactory

  • Method statement satisfactory and in date (Scaffolders)

  • Method statement satisfactory and in date (Cladding)

  • Method statement satisfactory and in date (Renderers)

  • Risk assessments satisfactory

  • Safety policy satisfactory

  • COSHH Assessments satisfactory

Lifting

  • Daily inspections satisfactory

  • Test certificates satisfactory

  • Operator / Banks-man certificates satisfactory

Scaffolds

  • Inspections satisfactory

  • Hand over documentation satisfactory

  • Access satisfactory

  • All edge protection satisfactory

  • Netting / sheeting satisfactory

  • Integrity satisfactory

Site Hoarding / Fencing

  • Are all fixed hoardings secure

  • Are all temporary hoardings secure

Enviromental / Waste Management / Noise

  • Dust satisfactory

  • Is waste being stored in an enclosed skip which can be locked

  • Waste transfer being documented correctly

  • Waste licences satisfactory

  • Noise monitoring

  • Hearing protection required

Plant and access equipment

  • Mast Climber weekly checklist completed

  • Trained operators

  • Forklift checklist satisfactory

  • Trained operator ducmentation

Road closures / Traffic management

  • Are all notices and permits displayed

  • Are all road and pedestrian signs in good order

  • Are all barriers and cones in good order

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.