Information
-
Document No.
-
Conducted on
-
Area
-
Room Number
-
Prepared by
-
Personnel
Drywall
-
Screw spacing in drywall
-
Patch drywall
-
Drywall not continuous to deck
-
Fire caulking inadequate
-
Acoustical caulk inadequate
-
Sleeve needs caulk
-
Stenciling inadequate
Fire Sprinkler
-
Pipe needs sleeve
-
Patch fireproofing
-
Inadequate pipe support
-
Beam clamp not fireproofed
Mechanical and Plumbing
-
Pipe not insulated
-
Beam clamp not fireproofed
-
Pipe needs sleeve through walls
-
Med gas copper pipe not isolated from other metals
-
Patch fireproofing
-
Pipe not labeled
-
Insulation on duct not complete
-
Inadequate pipe and duct support/ spacing
-
Fire dampers not labeled
-
Fire damper access door not installed
-
VAV not labeled
-
Flag volume damper
-
Need support on latch side of door
-
Pipe needs sleeve
-
Insulation needs repair
Electrical
-
Patch fireproofing
-
Box needs plate
-
Plate needs paint
-
Inadequate pipe support
-
Inadequate light support
-
Box needs KO seal
-
Wire touching grid
-
Temporary lights not removed
-
Junction boxes not labeled
-
Disconnects for VAV not labeled
-
Conduit not color coded
-
Flex needs strap
-
Beam clamp not fireproofed
-
Photos
Signoff
-
Brasfield & Gorrie
-
Drywall
-
Fire Sprinkler
-
Plumbing / HVAC Piping
-
Electrical
-
Low Voltage