Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
People involved in the drill
-
Length of time taken to evacuate
-
Details of faults/action taken
Title Page
Site conducted
Conducted on
Prepared by
People involved in the drill
Length of time taken to evacuate
Details of faults/action taken
Fire Evacuation Drills
to be completed every 6 months