Title Page

  • Bushland Reserve Name

  • BFM Polygon Inspections for Works Plan 2016FY

  • Conducted On

  • Completed by (initials)

  • Polygon ID Inspected

  • Add Polygon

POLYGON INSPECTION

  • Polygon ID

  • FMZ Type

  • Are the dimensions of the polygon on ground as per the map?

  • Describe map changes

  • Add photos hear of map changes

  • Describe vegetation modification (e.g. expand polygon in eastern direction to (metres as per map)

VEGETATION MODIFICATION WORKS REQUIRED

  • Is the Polygon within specification?

  • If FMZ not within specification, outline works required

  • Works to be Implemented

  • Equipment Required

  • Hours required for forestry mulcher & operator (1p)

  • Hours required for Knap sack & operators (2ppl)

  • Hours required for Brushcutter & operators (2ppl)

  • Hours required for Quik Spray & operators (2ppl)

  • Number of personnel Required

  • Hours required for personnel

  • Are the required works Creation or Maintenance?

  • Will these works cause a visual impact in the local area?

  • What level of community consultation is required?

  • Is there any green waste or hard waste present?

  • Merit has been raised

  • Inspection completed for this polygon. Select "add polygon ID" (top right corner) to begin inspection of next polygon.

  • Further Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.