Title Page
-
Bushland Reserve Name
-
BFM Polygon Inspections for Works Plan 2016FY
-
Conducted On
-
Completed by (initials)
-
Polygon ID Inspected
Add Polygon
POLYGON INSPECTION
-
Polygon ID
-
FMZ Type
-
Are the dimensions of the polygon on ground as per the map?
-
Describe map changes
-
Add photos hear of map changes
-
Describe vegetation modification (e.g. expand polygon in eastern direction to (metres as per map)
VEGETATION MODIFICATION WORKS REQUIRED
-
Is the Polygon within specification?
-
If FMZ not within specification, outline works required
- Undertake lateral separation
- Undertake vertical separation
- Undertake canopy separation
- Undertake works to realign FMZ width
- Undertake selective slashing
- Remove fallen and dead vegetation (excluding habitat logs)
-
Works to be Implemented
- Cut & paint & remove
- Frill & fill
- Cut & stack for forestry mulcher
- Forestry mulching
- One off slash
- Quik Spray
- Knap sack spray
- Brushcutting
- Uplifting
- Deadwooding
-
Equipment Required
- Truck & Chipper
- Chainsaw & polesaw
- 4x4 Ute
- Bruchcutter & operators (2ppl)
- Hand tools
- Knapsack & operators (2ppl)
- Quik Spray & operators (2ppl)
- Forestry mulcher & offsider (1p)
- Tractor
- Out-front mower
- Brushcutter
-
Hours required for forestry mulcher & operator (1p)
-
Hours required for Knap sack & operators (2ppl)
-
Hours required for Brushcutter & operators (2ppl)
-
Hours required for Quik Spray & operators (2ppl)
-
Number of personnel Required
- 1
- 2
- 3
- 4
- 6
- 8
-
Hours required for personnel
-
Are the required works Creation or Maintenance?
-
Will these works cause a visual impact in the local area?
-
What level of community consultation is required?
- Fire Management Works Signs
- Signs plus a Mail Out
-
Is there any green waste or hard waste present?
-
Merit has been raised
-
Inspection completed for this polygon. Select "add polygon ID" (top right corner) to begin inspection of next polygon.
-
Further Comments