COPPER RESOURCES AUSTRALIA FIXED PLANT GRINDING AREA AUDIT Equipment: Ball Mill and Control Room Date: Location: Rocklands Time:
-
This audit must be signed, completed, and returned to the Safety Department for filing.
-
INSPECTION
-
A=Acceptable UA=Unacceptable
-
BALL MILL
-
Item Item Compliance Comments No. Achieved A UA 1 Ball mill guarding and mill drive guarding in place.
-
2 Lube pump guarding in place and labelling legible and area clean.
-
3 Emergency stop device for the ball mill identified and accessible.
-
4 Ball mill control cabinets switches and lights in good order.
-
5 Trommel access doors closed and secure.
-
6 Guards and handrails are provided for all platforms and stairways.
-
7 Platforms and stairways have kick boards fitted.
-
8 Platforms and stairways are free from trip hazards.
-
9 Grid mesh secure on all platforms.
-
10 Stairs and ladders even and secure.
-
11 Lighting provided is adequate on access walkways, stairways, and platforms.
-
12 Piping is adequately supported.
-
13 Piping is labelled to identify the contents, direction of flow.
-
CRA_PROCESS_F_026 Date of Issue: 23/08/2024 - Version 1.1 Page 1 of 4
-
COPPER RESOURCES AUSTRALIA INSPECTION
-
A=Acceptable UA=Unacceptable
-
BALL MILL
-
Item
-
Item
-
Compliance
-
Comments
-
14. No grease leaks / spillage at mill lube area or waste grease bulky on floor level. Achieved: A UA
-
15. Safety drop rail at top of cyclone ladders in place and operational. Achieved: A UA
-
16. Crane pendant in good condition and isolator operational. Achieved: A UA
-
17. Cyclone feed pumps and float feed pumps guarding in place. Achieved: A UA
-
18. Sump pump guarding in place. Achieved: A UA
-
19. Spillage around fixed plant is not excessive and does not present a hazard. Achieved: A UA
-
20. Concrete footings visible (clear of build-up) and structurally sound. Achieved: A UA
-
21. Electrical cables are adequately supported. Achieved: A UA
-
22. Electrical cables, cable trays and equipment are not damaged. Achieved: A UA
-
23. Are regulatory signs in place and prominently visible, i.e., No Entry, Confined Space? Achieved: A UA
-
24. Are mandatory (blue circle) signs visible, i.e., Hearing Protection? Achieved: A UA
-
25. Are emergency signs in prominent positions i.e., First Aid, Fire Extinguishers? Achieved: A UA
-
26. Are barricades (soft and hard) adequate for the hazard they are protecting (Information tags)? Achieved: A UA
-
27. Are safety showers and eyewash stations operational? Is water temperature adequate for use? Achieved: A UA
-
28. Safety shower green lights working and signs in place. Achieved: A UA
-
CRA_PROCESS_F_026
-
Date of Issue: 23/08/2024 - Version 1.1
-
Page 2 of 4
-
COPPER RESOURCES AUSTRALIA INSPECTION
-
A=Acceptable UA=Unacceptable
-
BALL MILL
-
Item
-
Compliance
-
Comments
-
No.
-
Achieved A UA
-
1. Unobstructed access to safety showers and eyewash.
-
2. Any leaks in grinding and lube pumps / water / slurry / oil.
-
3. Are fire extinguishers labelled, in-date, gauge in the green, off the floor, covered and signs displayed?
-
4. Fire extinguishers not obstructed and have easy access.
-
5. Are PPE cabinets stocked?
-
CONTROL ROOM
-
6. Emergency radio operational.
-
7. SDS folder available and up to date.
-
8. First aid kit displayed and has been inspected in the past six months.
-
9. Are fire extinguishers labelled, in-date, gauge in the green, off the floor and covered?
-
10. Are the correct class of fire extinguishers in place and signs displayed?
-
11. Fire extinguishers and first aid containers not obstructed and have easy access.
-
12. Are procedures readily available, Emergency Response / Lightning procedure etc?
-
13. Floors and benches clean.
-
CRA_PROCESS_F_026
-
Date of Issue: 23/08/2024 - Version 1.1
-
Page 3 of 4
-
COPPER RESOURCES AUSTRALIA
-
ITEM
-
REQUIRED ACTIONS / ADDITIONAL COMMENTS
-
INSPECTION TEAM Name
-
INSPECTION TEAM Signature
-
INSPECTION TEAM Position Title
-
INSPECTION TEAM Name
-
INSPECTION TEAM Signature
-
INSPECTION TEAM Position Title
-
SUPERVISOR REVIEW / SIGN OFF
-
Name
-
Signature
-
CRA_PROCESS_F_026
-
Date of Issue: 23/08/2024 - Version 1.1
-
Page 4 of 4