Storm Desmond Site Audit
-
Document & Franchise number
-
Site Technical Audit.
-
Client Name
-
Claim reference number
-
Conducted on
-
Location
-
Franchise and staff on site
Risk Assessment
Health & Safety Overview
-
Can you gain access to the property? Take a photo of front elevation of the property.
-
Observe current site conditions and record any hazards leading to increased risk?<br>
-
Has a Rainbow Site Safety sign been left?
-
Detail atmospheric conditions and note potential for mould growth (visual assessment only)
Onsite interviews
-
Detail customer interview noting any comments
-
Detail technician interview noting any comments
-
Insurance client representative interview and comments
Site Overview
-
How many rooms have been affected?
-
Are utilities, specifically power supply in operation?
-
Has a temporary electrical board been installed?
-
Is the property central heating in operation and being used to aid drying?
-
What strip out works have been completed and are any further strip out works scheduled? (Guide: Technical Bulletin - Strip-Out Works)
-
What decontamination and sanitisation activities have been completed? (Guide: Technical Bulletin - Decontamination and sanitisation)
-
Has drying equipment been installed and is it appropriate for the needs of the property? (Guide: Only 'current' Rainbow approved drying equipment)
-
What is the current internal atmospheric readings and is it a balanced drying system? (Guide: Min 20 Deg C, Max 50% RH, Max 7 GPK See Technical Bulletin -Initial Visit and stabilisation phase; Recovery and Restoration Phase)
-
What are the current moisture readings in the walls and is it drying?
-
What is the current moisture readings in the floor and is it drying?
-
What measures have been put in place to prevent secondary damage to unaffected areas? (Guide: Dehumidifier upstairs and/or sheeted off to contain unaffected area)
-
When is the next scheduled visit and what works are expected to be completed?
Support Action Plan
-
Action points for site safety
-
Action points for customer comments
-
Action points for building drying and decontamination
-
Summary and further comments
-
Technician name and signature
-
Auditors signature