Job Details
-
Conducted on
-
Prepared by
-
Location
Before Starting Work
-
Please take a picture of any consumer units you will be working on.
-
Please take a picture of any areas you will be working in (before starting work).
-
Have you put something on the floor to put all your tools on? (Dust sheet, corex, etc)
-
Why? eg. it's a building site, no flooring down, etc.
Upon Completing Works
-
Have all areas been left clean + tidy? Take pictures of areas that have been worked in.
-
Why?
-
Has everything been reconnected and turned back on if required? Have circuits that were turned off been turned back on?
-
Why? eg. Faulty circuit left off/agreed with client circuits to be left off.
-
Have you completed any required testing and filled out the relevant certificates?
-
Why?
-
If you don't have access to a certificate template, have you noted down all relevant test results to be filled in at a later date? NA if not applicable.
-
Please take note of all required test results so you can fill them in at a later date.
-
Have you spoken to the customer at the end of the job and explained what has been done/why, and confirmed that the job is complete or if there are additional works that need to be done?
-
Has the job been fully completed?
-
What is needed to finish the job? List any tasks required and any materials required.