Job Details

  • Conducted on

  • Prepared by

  • Location

Before Starting Work

  • Please take a picture of any consumer units you will be working on.

  • Please take a picture of any areas you will be working in (before starting work).

  • Have you put something on the floor to put all your tools on? (Dust sheet, corex, etc)

  • Why? eg. it's a building site, no flooring down, etc.

Upon Completing Works

  • Have all areas been left clean + tidy? Take pictures of areas that have been worked in.

  • Why?

  • Has everything been reconnected and turned back on if required? Have circuits that were turned off been turned back on?

  • Why? eg. Faulty circuit left off/agreed with client circuits to be left off.

  • Have you completed any required testing and filled out the relevant certificates?

  • Why?

  • If you don't have access to a certificate template, have you noted down all relevant test results to be filled in at a later date? NA if not applicable.

  • Please take note of all required test results so you can fill them in at a later date.

  • Have you spoken to the customer at the end of the job and explained what has been done/why, and confirmed that the job is complete or if there are additional works that need to be done?

  • Has the job been fully completed?

  • What is needed to finish the job? List any tasks required and any materials required.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.