Major Fire Prevention - Fatality Prevention Audit

Verify random checks on annual fire suppression records.

Completion Date:

Verify hot work permits are filled out accurately and fire watch person is in place.

Completion Date:

Perform random checks of work area inspections.

Completion Date:

Verify AFFF foam flush PM is performed semi-annually.

Completion Date:

Check water truck operators knowledge of foam system operation.

Completion Date:

Verify fire drill documentation.

Completion Date:

Verify operators of water trucks are task trained on matrix.

Completion Date:

Verify water truck operators are task trained on AFFF foam and are on matrix.

Completion Date:

Verify HT operator simulator training.

Completion Date:

Auditor(s) Signature

Revision 1.0 iCloud posted document is the controlled copy. 07/02/13

FMSO Major Fire Prevention Checklist

Created by: Jeff Boothe | Industry: Mining | Downloads: 25

Fatality Prevention Audit

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Audit

Major Fire Prevention - Fatality Prevention Audit

Verify random checks on annual fire suppression records.

Completion Date:

Verify hot work permits are filled out accurately and fire watch person is in place.

Completion Date:

Perform random checks of work area inspections.

Completion Date:

Verify AFFF foam flush PM is performed semi-annually.

Completion Date:

Check water truck operators knowledge of foam system operation.

Completion Date:

Verify fire drill documentation.

Completion Date:

Verify operators of water trucks are task trained on matrix.

Completion Date:

Verify water truck operators are task trained on AFFF foam and are on matrix.

Completion Date:

Verify HT operator simulator training.

Completion Date:

Auditor(s) Signature

Revision 1.0 iCloud posted document is the controlled copy. 07/02/13