Title Page
-
Inspection month
-
Prepared by
110kV inspections
HES 219 Earth Switch
-
Metalwork/ Galvanising
-
Connections
-
Insulators
HDS 216 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
Line 1 VT (Voltage Transformer)
-
Metalwork/ Galvanising
-
Red Phase Oil Level
-
White Phase Oil Level
-
Blue Phase Oil Level
-
Bushings
-
Oil Leaks
-
Seal Metering Intact
Line 1 CT (Current Transformer)
-
Metalwork/ Galvanising
-
Red Phase Oil Level
-
White Phase Oil Level
-
Blue Phase Oil Level
-
Bushings
-
Oil Leaks
-
Seal Metering Intact
HCB 212 Circuit Breaker
-
Metalwork/ Galvanising
-
CB Bushings
-
CB SF6 Pressure
-
Control Cubicle Heater Working
-
Operations Counter
HDS 214 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
Bus 1 VT (Voltage Transformer)
-
Metalwork/ Galvanising
-
Red Phase Oil Level
-
White Phase Oil Level
-
Blue Phase Oil Level
-
Bushings
-
Oil Leaks
-
Seal Metering Intact
HCB 222 Circuit Breaker
-
Metalwork/ Galvanising
-
CB Bushings
-
CB SF6 Pressure
-
Control Cubicle Heater Working
-
Operations Counter
T1 (Transformer)
-
Metalwork/ Galvanising
-
Surge Arrestor
-
Oil Leaks
-
Main Tank Silica Gel
-
Main Oil Cup
-
OLTC Tank Silica Gel
-
OLTC Breather Oil Cup
-
Cable box Silica Gel
-
Cable Box Breather Oil Cup
-
Winding Temperature
-
Oil Temperature
-
OLTC Cubicle doors, hinges, locks
-
OLTC Counter Reading
-
OLTC Cubicle Heater Working
-
OLTC Tap Position
-
Main Control Cubicle doors, hinges, locks
-
Fan and Pump lamps Working
-
Fans tested OK (Control Cubicle)
-
Control Cubicle Heater Working
-
Bushings
-
Surge Arrestor Counters
-
Red Phase Bushing oil level
-
White Phase Bushing oil level
-
Blue Phase Bushing oil level
-
Transformer Conservator Tank Oil Level
-
OLTCConservator Tank Oil Level
-
Earthing Transformer Metalwork/Paintwork
-
Earthing Transformer Oil Leaks
-
Earthing Transformer Oil Level
HDS 227 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
HCB 232 Circuit Breaker
-
Metalwork/ Galvanising
-
CB Bushings
-
CB SF6 Pressure
-
Control Cubicle Heater Working
-
Operations Counter
T2 (Transformer)
-
Metalwork/ Galvanising
-
Surge Arrestor
-
Oil Leaks
-
Main Tank Silica Gel
-
Main Oil Cup
-
OLTC Tank Silica Gel
-
OLTC Breather Oil Cup
-
Cable box Silica Gel
-
Cable Box Breather Oil Cup
-
Winding Temperature
-
Oil Temperature
-
OLTC Cubicle doors, hinges, locks
-
OLTC Counter Reading
-
OLTC Cubicle Heater Working
-
OLTC Tap Position
-
Main Control Cubicle doors, hinges, locks
-
Fan and Pump lamps Working
-
Fans tested OK (Control Cubicle)
-
Control Cubicle Heater Working
-
Bushings
-
Surge Arrestor Counters
-
Red Phase Bushing oil level
-
White Phase Bushing oil level
-
Blue Phase Bushing oil level
-
Transformer Conservator Tank Oil Level
-
OLTCConservator Tank Oil Level
-
Earthing Transformer Metalwork/Paintwork
-
Earthing Transformer Oil Leaks
-
Earthing Transformer Oil Level
HDS 237 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
HCB 248 Circuit Breaker
-
Metalwork/ Galvanising
-
CB Bushings
-
CB SF6 Pressure
-
Control Cubicle Heater Working
-
Operations Counter
HDS 257 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
HCB 252 Circuit Breaker
-
Metalwork/ Galvanising
-
CB Bushings
-
CB SF6 Pressure
-
Control Cubicle Heater Working
-
Operations Counter
T3 (Transformer)
-
Metalwork/ Galvanising
-
Surge Arrestor
-
Oil Leaks
-
Main Tank Silica Gel
-
Main Oil Cup
-
OLTC Tank Silica Gel
-
OLTC Breather Oil Cup
-
Cable box Silica Gel
-
Cable Box Breather Oil Cup
-
Winding Temperature
-
Oil Temperature
-
OLTC Cubicle doors, hinges, locks
-
OLTC Counter Reading
-
OLTC Cubicle Heater Working
-
OLTC Tap Position
-
Main Control Cubicle doors, hinges, locks
-
Fan and Pump lamps Working
-
Fans tested OK (Control Cubicle)
-
Control Cubicle Heater Working
-
Bushings
-
Surge Arrestor Counters
-
Red Phase Bushing oil level
-
White Phase Bushing oil level
-
Blue Phase Bushing oil level
-
Transformer Conservator Tank Oil Level
-
OLTCConservator Tank Oil Level
HDS 267 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
HCB 262 Circuit Breaker
-
Metalwork/ Galvanising
-
CB Bushings
-
CB SF6 Pressure
-
Control Cubicle Heater Working
-
Operations Counter
T4 (Transformer)
-
Metalwork/ Galvanising
-
Surge Arrestor
-
Oil Leaks
-
Main Tank Silica Gel
-
Main Oil Cup
-
OLTC Tank Silica Gel
-
OLTC Breather Oil Cup
-
Cable box Silica Gel
-
Cable Box Breather Oil Cup
-
Winding Temperature
-
Oil Temperature
-
OLTC Cubicle doors, hinges, locks
-
OLTC Counter Reading
-
OLTC Cubicle Heater Working
-
OLTC Tap Position
-
Main Control Cubicle doors, hinges, locks
-
Fan and Pump lamps Working
-
Fans tested OK (Control Cubicle)
-
Control Cubicle Heater Working
-
Bushings
-
Surge Arrestor Counters
-
Red Phase Bushing oil level
-
White Phase Bushing oil level
-
Blue Phase Bushing oil level
-
Transformer Conservator Tank Oil Level
-
OLTCConservator Tank Oil Level
-
Earthing Transformer Metalwork/Paintwork
-
Earthing Transformer Oil Leaks
-
Earthing Transformer Oil Level
HDS 277 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
HCB 272 Circuit Breaker
-
Metalwork/ Galvanising
-
CB Bushings
-
CB SF6 Pressure
-
Control Cubicle Heater Working
-
Operations Counter
T5 (Transformer)
-
Metalwork/ Galvanising
-
Surge Arrestor
-
Oil Leaks
-
Main Tank Silica Gel
-
Main Oil Cup
-
OLTC Tank Silica Gel
-
OLTC Breather Oil Cup
-
Cable box Silica Gel
-
Cable Box Breather Oil Cup
-
Winding Temperature
-
Oil Temperature
-
OLTC Cubicle doors, hinges, locks
-
OLTC Counter Reading
-
OLTC Cubicle Heater Working
-
OLTC Tap Position
-
Main Control Cubicle doors, hinges, locks
-
Fan and Pump lamps Working
-
Fans tested OK (Control Cubicle)
-
Control Cubicle Heater Working
-
Bushings
-
Surge Arrestor Counters
-
Red Phase Bushing oil level
-
White Phase Bushing oil level
-
Blue Phase Bushing oil level
-
Transformer Conservator Tank Oil Level
-
OLTCConservator Tank Oil Level
-
Earthing Transformer Metalwork/Paintwork
-
Earthing Transformer Oil Leaks
-
Earthing Transformer Oil Level
Bus 2 VT (Voltage Transformer)
-
Metalwork/ Galvanising
-
Red Phase Oil Level
-
White Phase Oil Level
-
Blue Phase Oil Level
-
Bushings
-
Oil Leaks
-
Seal Metering Intact
HDS 284 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
HCB 282 Circuit Breaker
-
Metalwork/ Galvanising
-
CB Bushings
-
CB SF6 Pressure
-
Control Cubicle Heater Working
-
Operations Counter
Line 2 CT (Current Transformer)
-
Metalwork/ Galvanising
-
Red Phase Oil Level
-
White Phase Oil Level
-
Blue Phase Oil Level
-
Bushings
-
Oil Leaks
-
Seal Metering Intact
Line 2 VT (Voltage Transformer)
-
Metalwork/ Galvanising
-
Red Phase Oil Level
-
White Phase Oil Level
-
Blue Phase Oil Level
-
Bushings
-
Oil Leaks
-
Seal Metering Intact
HDS 286 Disconnector
-
Metalwork/ Galvanising
-
Connections
-
Insulators
-
Contacts closed correctly
-
Associated Buswork
-
Clear of wind blown debris
HES 219 Earth Switch
-
Metalwork/ Galvanising
-
Connections
-
Insulators
Oil Seperator
-
Metalwork
-
Test Run OK
-
Hoses OK
-
Alarms Present
-
Lights Operating Correctly
Switchyard
-
Fence
Life guard RCD test
-
General condition of lifeguard
-
Lifeguard Test Tag Current
-
RCD Test
-
RCD 6 Monthly Test
-
Fence Earthing
-
Gates, doors & Security
-
Switchyard Lights Working
-
Switchyard Tidiness
-
Bund Walls
-
Equipment Earthing
-
Equipment Labels