Title Page

  • Inspection month

  • Prepared by

110kV inspections

HES 219 Earth Switch

  • Metalwork/ Galvanising

  • Connections

  • Insulators

HDS 216 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

Line 1 VT (Voltage Transformer)

  • Metalwork/ Galvanising

  • Red Phase Oil Level

  • White Phase Oil Level

  • Blue Phase Oil Level

  • Bushings

  • Oil Leaks

  • Seal Metering Intact

Line 1 CT (Current Transformer)

  • Metalwork/ Galvanising

  • Red Phase Oil Level

  • White Phase Oil Level

  • Blue Phase Oil Level

  • Bushings

  • Oil Leaks

  • Seal Metering Intact

HCB 212 Circuit Breaker

  • Metalwork/ Galvanising

  • CB Bushings

  • CB SF6 Pressure

  • Control Cubicle Heater Working

  • Operations Counter

HDS 214 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

Bus 1 VT (Voltage Transformer)

  • Metalwork/ Galvanising

  • Red Phase Oil Level

  • White Phase Oil Level

  • Blue Phase Oil Level

  • Bushings

  • Oil Leaks

  • Seal Metering Intact

HCB 222 Circuit Breaker

  • Metalwork/ Galvanising

  • CB Bushings

  • CB SF6 Pressure

  • Control Cubicle Heater Working

  • Operations Counter

T1 (Transformer)

  • Metalwork/ Galvanising

  • Surge Arrestor

  • Oil Leaks

  • Main Tank Silica Gel

  • Main Oil Cup

  • OLTC Tank Silica Gel

  • OLTC Breather Oil Cup

  • Cable box Silica Gel

  • Cable Box Breather Oil Cup

  • Winding Temperature

  • Oil Temperature

  • OLTC Cubicle doors, hinges, locks

  • OLTC Counter Reading

  • OLTC Cubicle Heater Working

  • OLTC Tap Position

  • Main Control Cubicle doors, hinges, locks

  • Fan and Pump lamps Working

  • Fans tested OK (Control Cubicle)

  • Control Cubicle Heater Working

  • Bushings

  • Surge Arrestor Counters

  • Red Phase Bushing oil level

  • White Phase Bushing oil level

  • Blue Phase Bushing oil level

  • Transformer Conservator Tank Oil Level

  • OLTCConservator Tank Oil Level

  • Earthing Transformer Metalwork/Paintwork

  • Earthing Transformer Oil Leaks

  • Earthing Transformer Oil Level

HDS 227 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

HCB 232 Circuit Breaker

  • Metalwork/ Galvanising

  • CB Bushings

  • CB SF6 Pressure

  • Control Cubicle Heater Working

  • Operations Counter

T2 (Transformer)

  • Metalwork/ Galvanising

  • Surge Arrestor

  • Oil Leaks

  • Main Tank Silica Gel

  • Main Oil Cup

  • OLTC Tank Silica Gel

  • OLTC Breather Oil Cup

  • Cable box Silica Gel

  • Cable Box Breather Oil Cup

  • Winding Temperature

  • Oil Temperature

  • OLTC Cubicle doors, hinges, locks

  • OLTC Counter Reading

  • OLTC Cubicle Heater Working

  • OLTC Tap Position

  • Main Control Cubicle doors, hinges, locks

  • Fan and Pump lamps Working

  • Fans tested OK (Control Cubicle)

  • Control Cubicle Heater Working

  • Bushings

  • Surge Arrestor Counters

  • Red Phase Bushing oil level

  • White Phase Bushing oil level

  • Blue Phase Bushing oil level

  • Transformer Conservator Tank Oil Level

  • OLTCConservator Tank Oil Level

  • Earthing Transformer Metalwork/Paintwork

  • Earthing Transformer Oil Leaks

  • Earthing Transformer Oil Level

HDS 237 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

HCB 248 Circuit Breaker

  • Metalwork/ Galvanising

  • CB Bushings

  • CB SF6 Pressure

  • Control Cubicle Heater Working

  • Operations Counter

HDS 257 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

HCB 252 Circuit Breaker

  • Metalwork/ Galvanising

  • CB Bushings

  • CB SF6 Pressure

  • Control Cubicle Heater Working

  • Operations Counter

T3 (Transformer)

  • Metalwork/ Galvanising

  • Surge Arrestor

  • Oil Leaks

  • Main Tank Silica Gel

  • Main Oil Cup

  • OLTC Tank Silica Gel

  • OLTC Breather Oil Cup

  • Cable box Silica Gel

  • Cable Box Breather Oil Cup

  • Winding Temperature

  • Oil Temperature

  • OLTC Cubicle doors, hinges, locks

  • OLTC Counter Reading

  • OLTC Cubicle Heater Working

  • OLTC Tap Position

  • Main Control Cubicle doors, hinges, locks

  • Fan and Pump lamps Working

  • Fans tested OK (Control Cubicle)

  • Control Cubicle Heater Working

  • Bushings

  • Surge Arrestor Counters

  • Red Phase Bushing oil level

  • White Phase Bushing oil level

  • Blue Phase Bushing oil level

  • Transformer Conservator Tank Oil Level

  • OLTCConservator Tank Oil Level

HDS 267 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

HCB 262 Circuit Breaker

  • Metalwork/ Galvanising

  • CB Bushings

  • CB SF6 Pressure

  • Control Cubicle Heater Working

  • Operations Counter

T4 (Transformer)

  • Metalwork/ Galvanising

  • Surge Arrestor

  • Oil Leaks

  • Main Tank Silica Gel

  • Main Oil Cup

  • OLTC Tank Silica Gel

  • OLTC Breather Oil Cup

  • Cable box Silica Gel

  • Cable Box Breather Oil Cup

  • Winding Temperature

  • Oil Temperature

  • OLTC Cubicle doors, hinges, locks

  • OLTC Counter Reading

  • OLTC Cubicle Heater Working

  • OLTC Tap Position

  • Main Control Cubicle doors, hinges, locks

  • Fan and Pump lamps Working

  • Fans tested OK (Control Cubicle)

  • Control Cubicle Heater Working

  • Bushings

  • Surge Arrestor Counters

  • Red Phase Bushing oil level

  • White Phase Bushing oil level

  • Blue Phase Bushing oil level

  • Transformer Conservator Tank Oil Level

  • OLTCConservator Tank Oil Level

  • Earthing Transformer Metalwork/Paintwork

  • Earthing Transformer Oil Leaks

  • Earthing Transformer Oil Level

HDS 277 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

HCB 272 Circuit Breaker

  • Metalwork/ Galvanising

  • CB Bushings

  • CB SF6 Pressure

  • Control Cubicle Heater Working

  • Operations Counter

T5 (Transformer)

  • Metalwork/ Galvanising

  • Surge Arrestor

  • Oil Leaks

  • Main Tank Silica Gel

  • Main Oil Cup

  • OLTC Tank Silica Gel

  • OLTC Breather Oil Cup

  • Cable box Silica Gel

  • Cable Box Breather Oil Cup

  • Winding Temperature

  • Oil Temperature

  • OLTC Cubicle doors, hinges, locks

  • OLTC Counter Reading

  • OLTC Cubicle Heater Working

  • OLTC Tap Position

  • Main Control Cubicle doors, hinges, locks

  • Fan and Pump lamps Working

  • Fans tested OK (Control Cubicle)

  • Control Cubicle Heater Working

  • Bushings

  • Surge Arrestor Counters

  • Red Phase Bushing oil level

  • White Phase Bushing oil level

  • Blue Phase Bushing oil level

  • Transformer Conservator Tank Oil Level

  • OLTCConservator Tank Oil Level

  • Earthing Transformer Metalwork/Paintwork

  • Earthing Transformer Oil Leaks

  • Earthing Transformer Oil Level

Bus 2 VT (Voltage Transformer)

  • Metalwork/ Galvanising

  • Red Phase Oil Level

  • White Phase Oil Level

  • Blue Phase Oil Level

  • Bushings

  • Oil Leaks

  • Seal Metering Intact

HDS 284 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

HCB 282 Circuit Breaker

  • Metalwork/ Galvanising

  • CB Bushings

  • CB SF6 Pressure

  • Control Cubicle Heater Working

  • Operations Counter

Line 2 CT (Current Transformer)

  • Metalwork/ Galvanising

  • Red Phase Oil Level

  • White Phase Oil Level

  • Blue Phase Oil Level

  • Bushings

  • Oil Leaks

  • Seal Metering Intact

Line 2 VT (Voltage Transformer)

  • Metalwork/ Galvanising

  • Red Phase Oil Level

  • White Phase Oil Level

  • Blue Phase Oil Level

  • Bushings

  • Oil Leaks

  • Seal Metering Intact

HDS 286 Disconnector

  • Metalwork/ Galvanising

  • Connections

  • Insulators

  • Contacts closed correctly

  • Associated Buswork

  • Clear of wind blown debris

HES 219 Earth Switch

  • Metalwork/ Galvanising

  • Connections

  • Insulators

Oil Seperator

  • Metalwork

  • Test Run OK

  • Hoses OK

  • Alarms Present

  • Lights Operating Correctly

Switchyard

  • Fence

Life guard RCD test

  • General condition of lifeguard

  • Lifeguard Test Tag Current

  • RCD Test

  • RCD 6 Monthly Test

  • Fence Earthing

  • Gates, doors & Security

  • Switchyard Lights Working

  • Switchyard Tidiness

  • Bund Walls

  • Equipment Earthing

  • Equipment Labels

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.