Information
Daily Report Information
-
Conducted on
-
Project Name
-
Prepared by Foreman:
- Richard Dickinson
- Clyde Eppard
- Scott Taylor
- Jason Corbin
- Lee Ratliff
- James Brown
- Anthony Beverly
- Michael Wright
- Hugh French
- Mark Davis
- Gary Berghan
- James Shifflett
- Chuck Ayers
-
Weather
- Sunny
- Rain
- Ice
- Snow
- Light Rain
- Hail
- Thunder
- Overcast
-
Jobsite Location (Drop pin for GPS and street address):
Labor Force
-
Number of W.C. Spratt, Inc. Employees on the Job Today? (See B2W time cards for names).
-
Subcontractors On Site Today:
-
Work Plan for Today:
Trenching & Excavation:
-
Perimeter is set up around work around the work area:
-
Specifically, why not?
-
Use of proper anchor points (Rated for 5,200 lbs):
-
CAZ (Controlled Access Zone) Set Up Around Perimeter:
-
Specifically, why not? (Work area should resemble graphic on tablet)
-
Full Body Harness Being Worn as Appropriate:
-
Personal Fall Arrest System (PFAS) worn in a proper manner?
-
Fall protection equipment maintained and inspected?
-
Enter date of last inspection:
-
Personal Fall Arrest System (PFAS) utilized when there is a 6 ft. fall hazard or greater?
-
Ground openings are properly covered with material rated to support the intended load and marked with the word "HOLE"?
Housekeeping/General Safety
-
Project work areas are clean and free of excess trash and debris.
-
Walkways and passageways are clear.
-
Material or equipment is properly stored.
-
Electrical cords, hoses, etc. installed to prevent trip hazards.
-
Scrap metal/material free from protruding nails or other puncture hazards.
-
Trash receptacles are provided for work areas.
-
Barricades and/or rebar caps are installed and maintained
-
Wall openings/floor holes
-
Electrical
-
Slip/trip hazards
Personal Protective Equpment
-
Hard hats
-
Class 3 vest
-
Hearing protection
-
Foam Lined Eye protection
-
Proper foot protection
-
Gloves
-
Does anyone need replacement PPE?
-
What is needed, quantity and for whom?
Ladders
-
Proper angle using 4:1 ratio.
-
Exceeds any landing by 3 feet.
-
What method did you use to ensure safety?
-
Ladder properly secured to prevent movement.
-
Worker is not using top 2 steps of stepladder.
-
Stepladder used only in the open position and fully locked.
-
Inspected and free from defect.
Tools and Equipment
-
Electrical cords condition.
-
Tools are maintained in a safe condition
-
Pneumatic/hydraulic hose connections properly secured.
-
Tools are carried and stored.
-
Proper tools used for the job performed.
-
Guards and shields on tools in place.
-
Are all tools affixed with a GoCodes label?
-
Which tools?
-
Date and Time Supervisor was Notified?
Fire Protection
-
Flammables are stored properly?
-
Fire extinguishers are inspected?
-
Explosion proof trash can for oily and gas laden rags and debris on site?
-
Are all chemicals labeled with N.F.P.A. labels per our chemical labeling policy?
-
Do you need more labels?
Documentation:
-
JHA (Job Hazard Analysis) Updated
-
Why not?
-
UIG Toolbox Talk Held today?
-
What subject was discussed?
-
Safety Data Sheets (SDS) Book Current and Up to Date?
-
What do you need? Have you notified someone?
Job Progression:
-
Please provide a summary of the activities for today:
-
Please take photos of the work activity and progression:
Signature:
-
Foreman's Signature: