Information

Daily Report Information

  • Conducted on

  • Project Name

  • Prepared by Foreman:

  • Weather

  • Jobsite Location (Drop pin for GPS and street address):

Labor Force

  • Number of W.C. Spratt, Inc. Employees on the Job Today? (See B2W time cards for names).

  • Subcontractors On Site Today:

  • Work Plan for Today:

Trenching & Excavation:

  • Perimeter is set up around work around the work area:

  • Specifically, why not?

  • Use of proper anchor points (Rated for 5,200 lbs):

  • CAZ (Controlled Access Zone) Set Up Around Perimeter:

  • Specifically, why not? (Work area should resemble graphic on tablet)

  • Full Body Harness Being Worn as Appropriate:

  • Personal Fall Arrest System (PFAS) worn in a proper manner?

  • Fall protection equipment maintained and inspected?

  • Enter date of last inspection:

  • Personal Fall Arrest System (PFAS) utilized when there is a 6 ft. fall hazard or greater?

  • Ground openings are properly covered with material rated to support the intended load and marked with the word "HOLE"?

Housekeeping/General Safety

  • Project work areas are clean and free of excess trash and debris.

  • Walkways and passageways are clear.

  • Material or equipment is properly stored.

  • Electrical cords, hoses, etc. installed to prevent trip hazards.

  • Scrap metal/material free from protruding nails or other puncture hazards.

  • Trash receptacles are provided for work areas.

  • Barricades and/or rebar caps are installed and maintained

  • Wall openings/floor holes

  • Electrical

  • Slip/trip hazards

Personal Protective Equpment

  • Hard hats

  • Class 3 vest

  • Hearing protection

  • Foam Lined Eye protection

  • Proper foot protection

  • Gloves

  • Does anyone need replacement PPE?

  • What is needed, quantity and for whom?

Ladders

  • Proper angle using 4:1 ratio.

  • Exceeds any landing by 3 feet.

  • What method did you use to ensure safety?

  • Ladder properly secured to prevent movement.

  • Worker is not using top 2 steps of stepladder.

  • Stepladder used only in the open position and fully locked.

  • Inspected and free from defect.

Tools and Equipment

  • Electrical cords condition.

  • Tools are maintained in a safe condition

  • Pneumatic/hydraulic hose connections properly secured.

  • Tools are carried and stored.

  • Proper tools used for the job performed.

  • Guards and shields on tools in place.

  • Are all tools affixed with a GoCodes label?

  • Which tools?

  • Date and Time Supervisor was Notified?

Fire Protection

  • Flammables are stored properly?

  • Fire extinguishers are inspected?

  • Explosion proof trash can for oily and gas laden rags and debris on site?

  • Are all chemicals labeled with N.F.P.A. labels per our chemical labeling policy?

  • Do you need more labels?

Documentation:

  • JHA (Job Hazard Analysis) Updated

  • Why not?

  • UIG Toolbox Talk Held today?

  • What subject was discussed?

  • Safety Data Sheets (SDS) Book Current and Up to Date?

  • What do you need? Have you notified someone?

Job Progression:

  • Please provide a summary of the activities for today:

  • Please take photos of the work activity and progression:

Signature:

  • Foreman's Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.