Title Page
-
Author
-
Assisted By
-
SAP Reference
-
Project Name
-
Site conducted
-
Site conducted (not listed above) Input Site Location
-
Location
-
Select group
-
Brief description of the works
-
Conducted on
Principal Contractor
-
Region
-
Workstream
-
Capital Programme
-
Sub Contractor
-
PC Site Agent Name
-
Job Type
-
Gang or foreman (on site)
-
Stage
-
Business Lead
-
Report issue status
Appointments
-
To be completed by the site supervisor a non compliant response may well generate a stop/pause job scenario the stop / pause template must then be completed. This report may form part of the CDM Health and Safety File. Report immediately to site manager.
-
1) What are the management arrangements for temporary works for the duration of the project?<br>(Procedures / Responsibilities / Design / Documentation etc.)
-
2) Has a Temporary Works Coordinator been formally appointed?
-
3) What minimum requirements have been established for the TWC's and TWS's?<br>(do they identify minimum requirements for competence experience, qualifications, knowledge & training)?
Temp Works Schedule / Register
-
4) Has a register of temporary works been established and is the register being maintained in accordance with the STW procedures?
-
5) Are all temporary works being undertaken on site (including temporary electrical supplies offices, workshop and equipment etc) identified on the Temporary Works Register?
-
6) Have all temporary works on the register been categorized to identify required level of controls?
Design
-
7) Has temporary works design been undertaken where specified on the register?
-
8) Has the TW design been reviewed by a 3rd party (where required) and approved by the TWC?
-
9) Do the RAMS for the works make reference to the TW design, plans and calculations (where applicable) to ensure correct implementation of the TW design?
-
10) Has a temporary works supervisor been nominated for each area of work?
-
11) Will regular temporary work inspections be undertaken as required by TWD / legislation and recorded?
-
12) Are the temporary works being installed in accordance with the TWD (where applicable) and is a copy available at the workface?
-
13) Is there a system in place for the review of temporary works for suitably following any change in condition i.e. excavations?
-
14) Is there an inspection system for the monitoring of temporary works to confirm compliance?
Additional photos media
-
Add photos / videos here
Stop / Pause Issued
-
Was a stop / pause notice issued
Sign Off
Contractor Sign Off
-
Contractor Rep Comments
-
Contractor Signature
Authors Sign off
-
Authors Comments
-
Authors Signature