Title Page
-
Conducted on
-
Engineer Name
-
Site Address
Completion Checklist
-
Are there any damages or concerns at property?
-
Photo of safety Signs & Electric Spur Isolated
-
Photo of installation Set Up (Tools Boxes, Carpet Protector etc.)
-
Let By Pass or Fail
-
Tightness Test Drop Start
-
Photo of New Boiler Installed
-
Condensate Pump Installed If Yes Picture of Wiring
-
Test points and Flue caps Refitted?
-
External Flue Picture
-
Gas Meter Checked?
-
Tightness Test Drop Finish
-
Any Related paperwork
-
Photo of Permits Required