Information

  • Facility Name:

  • Facility Name: (Can be same name as above-This name will show up in the title line of the written report)

  • Conducted on:

  • Prepared by:

  • Plant Personnel Assisting:

Revision Date: June 10, 2016

Visitor Hazard Training

  • Is the plant utilizing the Hazard Training & Recognition Checklist for visitors and is it in the correct format? Is the Visitor Sign in sheet being utilized and in the correct format as well?

  • Corrective Action:

  • Completion will be on or before:

Record Keeping (OSHA)

  • 1904.33 Are the OSHA 300 and 300A logs on file for current year and past five years with the First Report of Injuries or equivalent?

  • Corrective Action:

  • Completion will be on or before"

Confined Space

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Confined Spaces?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 146(c)(4) Is there a written confined-space entry program?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 146(c)(4) Is the written confined-space entry program easily accessible to employees?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 146(c)(1) Has a Hazard Evaluation been conducted to identify confined spaces in the facility?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 146(c)(2) Are permit-required confined spaces marked with proper signage?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 146(c)(3) Are effective measures taken to prevent employees from entering permit-required confined spaces, through training, signage etc.?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 146(c)(7) If any permit-required spaces have been re-classified as non-permit confined spaces, is there proper documentation and certification?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 146(c)(5) If any permit-required spaces have been entered via alernate procedures, is there proper documentation and certification?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 146(c)(8) If contractors are used to enter confined spaces, is there a written program detailing responsibilities and actions of each party?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 146(d) - (l) If permit-required confined spaces are entered, is there a permit space program as outlined in 1910.146 (d) - (l)

  • Corrective Action:

  • Completion will be on or before:

  • 10. 146(f) If permit-required confined spaces are entered, is there a documented permit on file.

  • Corrective Action:

  • Completion will be on or before:

  • 11. 146(d) (4) Is there appropriate equipment for confined space entry readily available & maintained?

  • Corrective Action:

  • Completion will be on or before:

  • 12. 146(g) If permit-required confined spaces are entered, is there a record of training for confined space participants?

  • Corrective Action:

  • Completion will be on or before:

Crane Safety

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Crane Safety?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 179(b)(5) Do all cranes have rated capacity on them?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 179(b)(8) Do all crane operators have a certificate of training?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 179(e)(6) Are all guards in place and adequately protect employees?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 179(h)(2)(v) Are all rope and cable clamps attached correctly?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 179(j) If any deficiencies were noted on inspections have they been corrected?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 179(j)(2)(iii) Are monthly hook inspections being completed?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 179(l)(1) Is there a documented preventative maintenance program?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 179(j)(3) Have the annual inspections been completed for each crane?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 179(j)(2) Are daily inspections being completed?

  • Corrective Action:

  • Completion will be on or before:

  • 10. 179(m)(1) Are monthly running rope inspections completed and documented?

  • Corrective Action:

  • Completion will be on or before:

Slings

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Slings?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 184(c) Are all slings in good working condition without knots, kinks, or other defects?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 184(d) Are daily inspections being completed?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 184 multiple Are all slings identified with a tag or other marker?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 184(e) Are periodic inspections of alloy steel chain slings being conducted?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 184(e)(9)(ii) Are service hooks in good condition?

  • Corrective Action:

  • Completion will be on or before:

Electrical Safety

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Electrical Safety?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 303(f) Are all circuit breaker boxes legibly marked to indicate their purpose?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 303(f)(1) Is each disconnecting means for motors and appliances legibly marked to indicate its purpose, unless located and arranged so the purpose is evident?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 303(g)(1)(i)(B) Is the width of working space in front of the electrical equipment the width of the equipment or 30 inches, whichever is greater?

  • Corrective Action

  • Completion will be on or before:

  • 4. 304(g)(5-6) Do all tools and equipment have the required grounding plug? (unless it is a double-insulated tool).

  • Corrective Action:

  • Completion will be on or before:

  • 5. 334 (a) (2) (ii) Is defective equipment removed from service & properly tagged?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 305(b)(1)(ii) Are all unused openings in cabinets, boxes, and fittings effectively closed?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 305 (b) Is all conduit, cable, etc properly attached to all supports & tightly connected to junction/outlet boxes?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 305(g)(1)(iv) Are extension cords only used on short-term temporary basis, not as a replacement for permanent wiring?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 305 (g)(2)(ii) Are extension cords used only in continuous lengths without splice or taped? Is "Daisy Chaining" Prohibited?

  • Corrective Action:

  • Completion will be on or before:

  • 10. 305(g)(1)(iv) "Is the plant preventing extension cords from being: attached to the building surface; concealed; run through holes in the wall, ceiling, or floors; run through doorways, windows, or similar openings?

  • Corrective Action:

  • Completion will be on or before:

  • 11. 305(g)(2)(ii) Are all extension cords free from damage and/or splices?

  • Corrective Action:

  • Completion will be on or before:

  • 12. 305(j) Are receptacles installed outdoors or in wet areas adequately protected/covered?

  • Corrective Action:

  • Completion will be on or before:

  • 13. 305(j)(2)(iv) Are there GFCI receptacles installed in damp locations?

  • Corrective Action:

  • Completion will be on or before:

  • 14. 331 Are only qualified persons allowed to work on electrical equipment?

  • Corrective Action:

  • Completion will be on or before:

Emergency Action

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Emergency Action?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 36(d)(1) "Can employees open an exit route door from the inside at all times without keys, tools, or special knowledge?"

  • Corrective Action:

  • Completion will be on of before:

  • 2. 36(g)(2) Is exit access at least 28 inches (71.1 cm) wide at all points?

  • Corrective Action:

  • Completion will be on of before:

  • 3. 37(a)(3) Are exit routes free and unobstructed?

  • Corrective Action:

  • Completion will be on of before:

  • 4. 37(b)(2) "Is each exit clearly visible and marked by a sign reading ""Exit.""?"

  • Corrective Action:

  • Completion will be on of before:

  • 5. 37(b)(4) Is the line-of-sight for each exit sign clearly visible at all times?

  • Corrective Action:

  • Completion will be on of before:

  • 6. 36 ( e ) Are exit doors side-hinged?

  • Corrective Action:

  • Completion will be on of before:

  • 7. 36 ( e ) Is a revolving, sliding or overhead door prohibited from serving as a required exit door?

  • Corrective Action:

  • Completion will be on of before:

  • 8. 38(b) "Is an emergency action plan in writing, kept in the workplace, and available to employees for review?"

  • Corrective Action:

  • Completion will be on of before:

  • 9. 38(c)(2) "Does the plan include procedures for emergency evacuation, including type of evacuation and exit route assignments?"

  • Corrective Action:

  • Completion will be on of before:

  • 10. 38(c)(4) Does the plan include procedures to account for all employees after evacuation and how to report an emergency?

  • Corrective Action:

  • Completion will be on of before:

  • 11. Are emergency numbers posted in conspicuous location where telephones serve as a means of reporting emergencies?

  • Corrective Action:

  • Completion will be on of before:

Fall Protection

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Fall Protection?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 132(d)(2) Has an evaluation been conducted to identify areas where fall protection is required?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 132(f)(1) Have employees been trained in the use of the fall protection equipment?

  • Corrective Action:

  • Completion will be on or before:

  • 3. ANSI Z359 Is the fall protection equipment inspected prior to each use?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 132(e ) Is the fall protection equipment in good working condition?

  • Corrective Action:

  • Completion will be on or before:

  • 5. ANSI Z359 Is the fall protection adequate for the exposure?

  • Corrective Action:

  • Completion will be on or before:

  • 6. ANSI Z359 Is there a written fall protection plan? Does the plan include adequate rescue operations?

  • Corrective Action:

  • Completion will be on or before:

  • 7. ANSI Z359 Is personal fall protection equipment marked with the rating and the date put into service?

  • Corrective Action:

  • Completion will be on or before:

  • 8. ANSI Z359 Is personal fall protection taken out of service when the service life, per the manufacturer's recommendation, is expired?

  • Corrective Action:

  • Completion will be on or before:

  • 9. ANSI Z359 Is personal fall protection equipment properly stored when not in use?

  • Corrective Action:

  • Completion will be on or before:

  • 10. ANSI Z359 Are there adequate tie off points which are rated at 5000 lbs. per person tied to the point?

  • Corrective Action:

  • Completion will be on or before:

Fire Protection

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Fire Protection?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 39(b) Is there a fire prevention plan in writing, in the workplace and reviewed with employees?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 157(c)(1) Are portable fire extinguishers mounted, located and identified, so that they are readily accessible to employees without subjecting the employees to possible injury?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 157(c)(4) Are portable fire extinguishers maintained in a fully charged and operable condition and kept in their designated places at all times except during use?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 157(e)(2) Are Portable extinguishers & hoses visually inspected monthly and documented?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 157(e)(3) Are all portable fire extinguishers subjected to an annual maintenance check?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 165(b)(3) Is the employee alarm distinctive and recognizable as a signal to evacuate the work area or to perform actions designated under the emergency action plan?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 165(d)(1) Are all employee alarm systems maintained in operating condition except when undergoing repairs or maintenance?

  • Corrective Action:

  • Completion will be on or before:

Flammable Materials

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Flammable Materials ?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. NFPA 30 Are no more than three (3) cabinets located in one fire area?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 106(d)(2)(i) Are only approved containers used for storing flammable or combustible liquids?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 106(d)(2)(iii) Is gas stored in safety cans in quantities of less than 5 gallons?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 106(d)(3)(ii) Are all cabinets labeled in conspicuous lettering: "FLAMMABLE-KEEP FIRE AWAY"?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 106(d)(3)(ii)(a) Is the door provided with a three point lock and a sill raised at least 2 inches above the bottom of the cabinet?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 106(d)(5)(i) Is the storage of flammable or combustible liquids prohibited near exits, stairways, or areas normally used for the safe exit of people?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 106 (d) (iv) -( e ) Are combustible scrap, debris and waste materials (oil rags, etc.) stored in covered metal receptacles and promptly removed from the work-site?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 106(d)(7) Are portable fire extinguishers available at locations where flammable or combustible liquids are stored?

  • Corrective Action:

  • Completion will be on or before:

  • 9. NFPA 30 Are storage areas for flammable or combustible liquids kept free from combustible materials?

  • Corrective Action:

  • Completion will be on or before:

  • 10. 106 (b) (c) Are "No Smoking" signs posted in areas where flammable or combustible materials are used or stored?

  • Corrective Action:

  • Completion will be on or before:

  • 11. 106(e)(2)(ii) Are containers of flammable and combustible liquids closed when not in use?

  • Corrective Action:

  • Completion will be on or before:

Hazardous Communication

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Hazardous Communication ?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 1200(e)(1) Is there a written Hazard Communication Program on location?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 1200(e)(1)(i) Is there a list of chemicals known to be present in the facility?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 1200(e)(4) Do employees have access to the written Hazard Communication Program?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 1200(f)(5) Are all secondary containers labeled?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 1200(g)(8) Are there SDS's for all chemicals on location?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 1200(g)(8) Are the SDS's readily accessible?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 1200(g)(8) Is there a system in place to ensure that incoming chemicals are included on the inventory list?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 1200(h)(1) Have all employees received training in the Hazard Communication Program?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 1200(h)(2)(iii) Do employees know where to go to get chemical information?

  • Corrective Action:

  • Completion will be on or before:

Hearing Protection

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Hearing Protection?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 95(c)(1) Is there a written HCP? (Hearing Conversation Program)

  • Corrective Action:

  • Completion will be on or before:

  • 2. 95(d)(1) Have all areas been tested to determine whether or not a HCP is needed?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 95(g)(1) Is there an Audio-metric testing program?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 95(g)(5)(i) Do HCP employees receive their baseline within 6 months of employment (unless mobile van exception)?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 95(g)(6) Are annual audiograms conducted?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 95(i)(3) Is a variety of hearing protection made available to employees?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 95(k)(3) Does the training meet OSHA standard 1910.95(k)(3) and conducted yearly?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 95(l) Is a copy of the HCP standard available to employees? (1910.95i) and posted?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 95(m)(3) Are copies of audio-metric tests kept for the duration of the employee's employment?

  • Corrective Action:

  • Completion will be on or before:

Industrial Hygiene

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Industrial Hygiene?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 151(c). Are emergency eyewash/shower stations provided where caustic or corrosive materials are handled?

  • Corrective Action:

  • Completion will be on or before:

  • 2. ANSI Z358.1 Is the path of travel to the eyewash free of obstructions and can it be reached within 10 seconds?

  • Corrective Action:

  • Completion will be on or before:

  • 3. ANSI Z358.2 Is the eyewash equipped with valves that stay open without the use of hands once activated?

  • Corrective Action:

  • Completion will be on or before:

  • 4. ANSI Z358.3 Are plumbed eyewashes activated weekly to ensure flushing fluid is available?

  • Corrective Action:

  • Completion will be on or before:

  • 5. ANSI Z358.4 Is the temperature of the eyewash flushing fluid between 60 and 100 degrees Fahrenheit?

  • Corrective Action:

  • Completion will be on or before:

Lock Out -Tag Out -Try Out

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of LOTOTO?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 147(c)(1) Is there a written Lockout Program?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 147(c)(4) Has an Equipment Evaluation (Form 142 or equivalent) been conducted for all pieces of equipment that require Lockout?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 147(c)(5)(ii) Do Authorized Employees have identification tags?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 147(c)(5)(i) Are there a sufficient number of locks and isolation devices available?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 147(c)(6)(i) Are Periodic Inspections being completed?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 147(c)(7) Has Lockout training been conducted and documented for all employees?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 147(c)(7)(i) Do Affected Employees know their responsibilities?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 147(c)(7)(i) Do Authorized Employees know their responsibilities?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 147(d)-(e) Is Lockout being conducted?

  • Corrective Action:

  • Completion will be on or before:

  • 10. 147(f)(3)(d) Is there only one key made available for each lock?

  • Corrective Action:

  • Completion will be on or before:

Machine Guarding

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Machine Guarding?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 212(a)(1) Do all machines have proper guarding to protect employees from in-running rollers, nip points, point of operation, rotating parts, flying chips, etc.

  • Corrective Action:

  • Completion will be on or before:

  • 2. 212(b) Are machines designed for a fixed location adequately bolted to the floor?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 213(b)(3) Are provisions made to prevent restart of machines after power outages?

  • Corrective Action:

  • Completion will be on or before:

  • 4. Multiple Are all chains, sprockets, flywheels, gears, and other moving machinery located less than 7 feet above the working surface guarded?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 213(c) Do hand-fed ripsaws (table saws) have a hood, spreader, and anti-kickback devices?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 213(g)-(h) Do all swing or radial cut-off saws have a hood, automatic return, and end stops?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 215(a)(4), (b)(9) Is the work rest on grinding wheels adjusted to 1/8" or less and the spark arrest on grinding wheels adjusted to 1/4" or less?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 242(a) Are all hand and portable power tools in good working condition?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 242(b) Have compressed air nozzles that are used for cleaning been reduced to less than 30 psi?

  • Corrective Action:

  • Completion will be on or before:

  • 10. 243(a)(2) Do all hand-held power tools have a constant pressure switch to activate tool?

  • Corrective Action:

  • Completion will be on or before:

Powered Industrial Trucks

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Powered Industrial Trucks?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 178(a)(3),(6) Do all forklifts have nameplates that rated capacities and testing laboratory approvals?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 178(g) Are specific areas identified as battery charging and maintenance areas that meet the standard 1910.178(g)?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 178(i)(1) Is caution taken to ensure Mobile Equipment, Generators, Portable Welding Machines, etc. are only operated in well ventilated areas?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 178(l) Does the forklift training follow the requirements as provided in 1910.178(l)

  • Corrective Action:

  • Completion will be on or before:

  • 5. 178(l)(4)(ii) Is refresher training given to employees involved in an accident or near-miss situation?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 178(l)(4)(iii) Have all forklift operators been trained in the past 3 years?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 178(l)(6) Do forklift operators have their certification card (or on file)?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 178(m)-(n) Are forklifts operated in a safe manner?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 178(p)(1) Are Forklifts/Mobile Equipment in good operating condition (brakes, back up alarms, warning lights)<br>

  • Corrective Action:

  • Completion will be on or before:

  • 10. 178(p)(7) Are daily inspections being completed with each forklift?

  • Corrective Action:

  • Completion will be on or before:

PPE

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Personal Protective Equipment ?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 132(d) Has an evaluation of job functions been conducted to determine PPE needs of employees?<br>

  • Corrective Action:

  • Completion will be on or before:

  • 2. 132(e) Are all damaged and defective PPE removed from the facility?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 132(f)(1) Does the PPE training include the following: when PPE is necessary, what PPE is necessary, how to wear and adjust PPE, the limitations of the PPE, and care, storage and disposal of PPE?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 132(f)(4) Is there documentation of PPE training for employees?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 133(a)(1) Are employees wearing proper eye protection in areas where there is a potential for an injury to the eye (flying objects, chemicals, radiation, etc.)?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 133(a)(5) For welding operations, is the proper shaded lenses being used for the operation?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 133(b)(1) Is eye protection that is labelled ANSI Z87 provided to the employees?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 135(a)(1), (b)(2) Are employees wearing (ANSI Z89.1) hard hats in areas where there is a potential for an injury to the head or falling objects?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 136(a)(1) Are employees (ANSI Z41) wearing foot protection in areas where there is a potential for an injury to the foot by falling or rolling objects?

  • Corrective Action:

  • Completion will be on or before:

  • 10. 138(a) Are employees wearing hand protection in areas where there is a potential for an injury to the hand by cuts, punctures, abrasions, chemicals, heat, etc.?<br>

  • Corrective Action:

  • Completion will be on or before:

Respirators

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Respirators?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 134(a) Has the facility tried to eliminate exposures leading to respirator use?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 134(c)(1) Is there a written Respirator Protection Program (RPP) that meets the standards outlined in 1910.134(c)(1)

  • Corrective Action:

  • Completion will be on or before:

  • 3. 134(c)(2)(i) Are voluntary users of respirators provided with the information in Appendix D?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 134(d) Has a Hazard Evaluation been conducted to determine if respirator use is required?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 134(d)(1)(ii) Are respirators NIOSH certified?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 134(e) Have all employees using respirators be given a medical evaluation in accordance with 1910.134(e)?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 134(f) Have all employees using respirators been fit tested in accordance with 1910.134(e)?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 134(h)(1),(2)(i) Are respirators clean and stored to prevent damage?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 134(h)(3)(i)-(ii) Do employees wearing respirators know how to inspect the respirators?<br>

  • Corrective Action:

  • Completion will be on or before:

  • 10. 134(k) Are all employees who use respirators trained at least annually according to the guidelines listed in 1910.134(k)

  • Corrective Action:

  • Completion will be on or before:

Walking Working Surfaces

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Walking Working Surfaces?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 22(a)(1) Are places of employment, passageways, storerooms, and service rooms kept clean and orderly and in a sanitary condition?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 22(b)(1) Where mechanical handling equipment is used, are sufficient safe clearances allowed for aisles, at loading docks, through doorways and wherever turns or passage must be made?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 22(b)(1) Are aisles and passageways kept clear and in good repairs, with no obstruction across or in aisles that could create a hazard?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 22(b)(2) Are permanent aisles and passageways appropriately marked?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 23(a)(10) Where doors or gates open directly on a stairway, is a platform provided?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 23(a)(8) Is every floor hole into which persons can accidentally walk guarded by either a standard railing with standard toe-board on all exposed sides, or a floor hole cover of standard strength and construction?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 23(c)(1) Where there is exposure below to falling materials, is a removable toe board or the equivalent provided?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 23(c)(1) Is every open-sided floor or platform 4 feet or more above adjacent floor or ground level guarded by a standard railing on all open sides except where there is entrance to a ramp, stairway, or fixed ladder?

  • Corrective Action:

  • Completion will be on or before:

  • 9. 23(d)(1) Are every flight of stairs having four or more risers equipped with standard stair railings or standard handrails?

  • Corrective Action:

  • Completion will be on or before:

  • 10. 26(c) Are ladders in good working condition and used as intended?

  • Corrective Action:

  • Completion will be on or before:

Welding & Cutting

Does the plant (PM, Supervisors, & Employees) show general knowledge & compliance of Welding & Cutting ?

  • Has the plant completed and scored greater than 85% on a Safety & Health Program review, or can the plant produce sufficient documentation of compliance such as recent training records, certifications, hazard assessments, etc.? <br><br>Based on these high level questions the plant:

  • 1. 252(a) Are all move-able fire hazards and combustibles moved to at least 35 feet away from areas or objects to be welded?

  • Corrective Action:

  • Completion will be on or before:

  • 2. 252(a)(2)(ii) Is suitable fire extinguishing equipment kept where welding or cutting is done?

  • Corrective Action:

  • Completion will be on or before:

  • 3. 252(b)(3) Are welders provided with proper PPE and is it in good, usable condition?

  • Corrective Action:

  • Completion will be on or before:

  • 4. 252(b)(2)(iii) Are employees working nearby protected from arc welding rays by screens, booths, or shields?

  • Corrective Action:

  • Completion will be on or before:

  • 5. 252(c) Has an evaluation of the welding areas been conducted to ensure compliance with air quality levels?

  • Corrective Action:

  • Completion will be on or before:

  • 6. 253(b)(1)(ii) Are all compressed gas cylinders legibly marked on their shoulders (by stenciling, stamping, or permanent labeling) with the chemical or trade name of the gas?

  • Corrective Action:

  • Completion will be on or before:

  • 7. 253(b)(2)(ii) Are cylinders stored in a designated space where they will not be knocked over, damaged by passing or falling objects or subject to tampering by unauthorized people and have valve protection caps?

  • Corrective Action:

  • Completion will be on or before:

  • 8. 253(b)(4)(iii) Are stored oxygen cylinders separated from fuel-gas cylinders or combustible materials by at least 20 feet, or by a noncombustible barrier at least 5 feet high with a fire-resistance rating of at least one-half hour

  • Corrective Action:

  • Completion will be on or before:

  • 9. 254(d)(8) Are electrode cables free from splices within 10 feet from holders?

  • Corrective Action:

  • Completion will be on or before:

  • 10. 254(d)(9)(iii) Are cables with damaged insulation or exposed bare conductors replaced?

  • Corrective Action:

  • Completion will be on or before:

Miscellaneous

Other Conditions

  • Were there any other conditions found during the site visit that have not previously been listed?

  • Condition
  • Describe:

  • Add media

  • Corrective Action:

  • Completion will be on or before:

Best Practices

  • Did you observe any Best Practices during visit?

  • Best Practice
  • Describe:

  • Add media

Employee Interviews

  • Were there any employee interviews conducted during visit?

  • Interview
  • Discussed:

Unsafe Acts

    Unsafe Act
  • Describe:

  • Corrective Action:

  • Completion will be on or before:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.