Title Page
-
Project
-
Conducted on
-
Location
-
Superintendent
-
Prepared by
SAFETY INSPECTION CHECKLIST
JOB INFORMATION
-
OSHA & DOL posters posted?
-
OSHA 300 Forms Posted? (Feb 1 - Apr 30)
-
First-aid kit fully stocked with non-expired items?
-
Safety Data Sheets filed and accessible?
HOUSEKEEPING
-
Work areas neat?
-
Passageways and walkways clear?
-
Projecting nails and screws are removed or bent over?
-
Protruding steel is bent or capped to prevent impalement?
-
Containers clearly labeled?
-
Waste containers provided and being used?
PERSONAL PROTECTIVE EQUIPMENT
-
Hard Hats being worn?
-
Safety glasses being worn?
-
Hearing protection being worn?
-
Proper clothing worn? (footwear, long pants, shirt w/ sleeves)
-
Task specific PPE worn as required?
ELECTRICAL
-
Extension cords with bare wires or missing ground plug taken out of service?
-
Terminal boxes equipped with required covers?
-
GFCIs or double insulated tools being used?
-
Temporary lighting suspended correctly and in proper condition?
HAND AND POWER TOOLS
-
Hand tools inspected regularly?
-
Guards in place?
-
Right tool is being used at the job at hand?
FLAMMABLES AND COMBUSTIBLES?
-
Compressed cylinders stored properly?
-
Fuel storage is protected? (Impact / spills)
-
Adequate fire extinguishers provided?
- Yes
- No
- N/A
FALL PROTECTION
-
Safety rails and cables secured properly?
-
Employees exposed to fall hazards tied off?
-
Harness worn properly?
- Yes
- No
- N/A
-
Employees below protected from falling objects?
WALL & FLOOR OPENINGS
-
Floor openings planked over, secured, and labeled "hole" or barricaded?
-
Perimeter protection in place?
-
Materials stored away from the edge?
LADDERS
-
Ladders extended at least 36" above landing?
-
Ladders are secured to prevent slipping, sliding or falling?
-
Ladders with split or missing rungs taken out of service?
-
Stepladders used in fully open position?
-
No step at the top two rungs of stepladder?
SCAFFOLDING
-
Scaffolding inspected daily?
-
Erected on sound rigid footing?
-
Tied to structure as required?
-
Guardrails, mid-rails, and toe boards in place?
-
Planking sound and sturdy?
-
Proper access provided?
-
Employees below protected from falling objects?
TRENCHING & EXCAVATION
-
Competent person identified and present?
-
Excavation is protected from cave-ins?
-
Means of egress provided every 25 feet?
-
Materials are stored at least 2 feet away from trench?
-
Equipment is at safe distance from edge of excavation?
SILICA
-
Engineering control being used?
-
Area of silica producing activity is controlled and other subcontractors are not exposed to silica dust?
MOBILE EQUIPMENT (Manlifts, Forklifts, etc.)
-
Equipment inspected and maintained?
-
Machinery equipped with back up alarm and functioning properly?
-
Operator trained for specific equipment?
-
Operators manual and warning labels in place?
-
Overhead hazards marked and proper clearance maintained?
CRANE
-
Crane inspection complete and up to date?
-
Crane operator log up to date?
-
Operator is trained to use specific crane?
-
Employees are kept from suspended load?
-
Outriggers extended and swing radius is barricade is in place?
-
Taglines used to guide loads?
RIGGING
-
Chains and slings inspected and tagged as required?
COVID-19
-
COVID-19 Daily Questionnaire completed daily for all project personnel?
-
Social distancing is practiced?
-
Face covering worn when required?
-
Commonly touched surfaces are disinfected frequently?
-
Signage posted?
NOTES