Title Page
-
Document No.
-
Client / Project
-
Project Manager
-
Conducted on
-
Location
-
Personnel
-
Prepared by
-
Signature of Auditor
-
-
Types of works
-
Types of traffic control required.
- speed reduction
- Lane closure
- Road closure
- Shuttle flow
- Contra flow
- Pedestrian management
- traffic detour
- Advanced signage
-
How many traffic controllers onsite
-
How many vehicles onsite
-
Is an arrow board in use where required and in the correct fashion
-
Is there a VMS board onsite? If yes is the message relevant.
-
Site photos
Traffic Control- Paperwork and Compliance onsite.
-
JSEA been completed prior to job commencing.
-
Have all staff signed onto the JSEA.
-
Has the daily job book been completed prior to works commencing.
-
Are all tickets present for the staff and have they been viewed.<br>Traffic control RIIOHS302A, RIIOHS205A, Construction Induction,
-
Does the driver have a current and valid drivers license (and onsite with them)?
-
Is a site specific TMP being used? (If yes have any changes been documented on the TMP or JSEA) Does the TMP comply with the AS1742.3.
-
Is a Generic TMP being used? If yes have any alterations been noted or has a site specific Mud map been drawn to reflect the work zone
-
Is there a printed copy of the paperwork onsite?
-
Is there a current MOA for the works. If YES is there a printed copy onsite.
-
Is there a current council permit for the works? If YES is there a copy onsite
Advanced Warnings, Signage, Devices and Clearance to Traffic
-
Are flags installed in all advanced warning signs/ speed reduction signs?
-
Have all conflicting/ distracting signs been covered or removed?
-
Have roadworks speed limits been determined correctly?
-
Are signs setup at the correct distances?
-
Are signs suitably placed for vehicular traffic entering the work zone?
-
Side streets signed?
-
If stop/ slow bat is in use to control traffic are the controllers doing so with a max speed of 60kph?
-
Is there a detour in use? If YES is it set up correctly?
-
Have End Roadworks or return to speed signs been installed in accordance to Australian standards?
-
Are multi message frames being used correctly? Including no empty spaces, blank yellows not whites, etc
-
Are the signs mounted and placed securely for the location
-
Are the signs in pairs (double gated) where required?
-
Taper set adequately (line and length)?
-
Are the lane status signs set up correctly?
-
Is an arrow board being used where required and in the correct fashion?
-
Is pedestrian signage being use? Pedestrian care being provided
-
Is pedestrian tape being used to restrict pedestrians entering the work area?
PPE and Equipment
-
Is all PPE being worn as required for the task. Including:<br>Hard hat with chin strap and stabilisers <br>Clear and tinted safety glasses<br>Long sleeved shirt and pants<br>VicRoads safety vest<br>Steel capped boots
-
Are all personal wearing correct MTM attire?<br>Blue and orange cotton drill shirt<br>Navy pants with reflective strip<br>Blue and orange jumper<br>Orange wet weather attire not yellow.
-
Has the vehicle pre start checklist been completed?
-
Is all signage and devices been kept neat, tidy and secured on the vehicle?
-
Are signs & stop/slow bats in good condition?
-
Is there a current copy of the generic TMPs in the vehicle?
-
Is there a current copy of the SWMS in the vehicle?
-
Is there a First aid kit in the vehicle and its contents in date? If YES does it have both checklists in it?<br>1x Audit checklist <br>1x usage checklist
-
Is the fire extinguisher mounted correctly and in date?
Site awareness and Client Interaction.
-
Are traffic controllers in a good position with an escape route from potential dangers?
-
Are the traffic controllers communicating?
-
Bus and tram accessible?
-
Has the vehicle been placed in a suitable position for the works?
-
Have the traffic controllers signed onto the clients JSEA?
-
Has the client (or representative) signed onto the traffic control JSEA?
-
Has there been effective communication between the traffic controllers and the client including the reporting of hazards?
-
Have there been any environmental issues raised by the traffic controllers? If YES please note.
-
Signed off by the auditor.
-
Signed off by the traffic controller
-
Comments