Title Page
-
CUA No.
-
Nominated Date & Time
-
Inspection Address
-
Inspection Requested by
-
Contact No.
-
Inspection Conducted on
Preliminary requirements
-
Required signs
-
Condition of road & footpath
-
Conditions of consent checked
-
Check survey received
-
Soil Erosion controls in place
-
Trees protected
-
On site material storage
-
Bushfire conditions discussed?
-
Preliminary Requirements
Floors
-
Floor level above ground level
-
Ventilation
-
Termite Barrier/Vermin Proofing
-
Bearers - size, spacing & span
-
Joists - size, spacing & span
-
Deep joists blocked
-
Engineer's certificate required
-
Engineered timber specifications followed
-
Floor
Walls
-
Top and bottom plates
-
Studs and noggins
-
Lintels and heads
-
Bracing and tie down
-
Brick veneer ties
-
Cavity adequate
-
Flashings
-
Weepholes
-
Walls
Conventional Roof
-
Section applicable?
-
Rafter size and spacing and tie down
-
Underpurlin size, spacing and tie down
-
Hip/valley size and spacing
-
Roof strut size and spacing
-
Collar ties required/provided?
-
Ride/ridge beam size & support
-
Batten fixing adequate?
-
Is sarking required?
-
Engineers Certificate required
-
Roof
Truss Roof
-
Section applicable?
-
Truss details received
-
Truss tie down and fixing
-
Truss bracing layout and fixing
-
Batten fixing adequate
-
Sarking required?
-
Engineer's Certificate required?
-
Roof
Comments
-
Comments
-
Photos
Signature
-
Recorded on computer
-
Inspector's Name & Signature