Title Page

  • Project name

  • Block name

  • Conducted on

  • Prepared by

  • Contractor name

  • Fallstop site supervisor

  • Fallstop site manager

  • Location

Project management

  • Fallstop safety folder available on site ?

  • Site induction cover sheet signed by contractor ?

  • Rams available on request ?

  • CPP available on request ?

  • COSHH assessment available on request ?

  • HAVS calculator available on request ?

  • Manual handling assessment available (TILE) ?

  • Noise assessment available on request ?

  • Contractor demonstrates understanding of lone working controls

  • Training certification available on request

  • Public liability insurance available on request

  • Contractor aware of Fallstop site supervisor

  • Contractror aware of Fallstop site manager

  • Contractor aware of local welfare facilities

WORKING AT HEIGHT

  • Contractor has deployed PFPE in line with CAI safe system of work

  • Short duration ladder works correctly controlled

  • WAH emergency rescue plan and certification available on request

  • Tool lanyards are being utilised to prevent tool drop from height

  • Contractor has deployed sufficient exclusion zones whilst work at height

  • Contractor has deployed adequate signage to direct members of the public/visitors to site

  • correct height access equipment utilised/ladder angles/stability/anti slip devices

  • Ladders and steps are rated to BS EN131 or Class 1 Industrial

  • Ladder tags in date

PPE AND CONTRACTOR APPERENCE

  • PPE worn as required

  • PPE in good condition

  • Harness worn as required

  • CFL branded Hi vis being worn

  • contractor appearance (dark coloured combat trousers and T shirts) no bright coloured or branded clothing?

  • ID lanyard worn at all times whilst on site

  • Vehicle parked considerately

  • vehicle is clean and presentable

  • Van safely loaded and tidy-

  • safety equipment is correctly stored and readily available on request

SITE HOUSEKEEPING & MATERIALS CONTROL

  • FIbre cable waste is being stored and disposed of correctly

  • Contractor is ensuring Dust is cleaned away( site vacuums present )

  • Contractor is controlling cable trips hazard correctly ( Temporary ties over doors and emergency exits)

  • residents?

FIRST AID & WELFARE

  • Contractor has in date first aid kit including eyewash at immediate work location

  • Contractor holds emergency first aid at work training certification

  • Hand wash and site wipes available

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.