4th Utility have instructed SCCI (22/07/2022) to move away from our current two visit approach - we will no longer make a return visit to PIA affected sites
Our works will be completed in one stage irrelevant of whether the site is needing PIA or not
In all case we will undertake Phase 1 (IOLM) as normal & Phase 2 where PIA is not a factor or is already in place
Where PIA has not yet been completed – we will undertake testing to Phase 1.5
On Phase 1.5 (for blocks without PIA) – we will fit the splitters in the DP and splice to a bulk head with a patch lead - then power test to 1 in 8 through the splitters & patch lead, using a power generator locally at the DP
We will always fit the split tray in the comms cabinet and liven up all DP’s that are linked (by us) to the comms cabinet & 2nd stage test – in normal circumstance the comms cabinet block can be 2nd stage tested
Where the BT circuit is not in situ, we will test the local cabling & through the splitters in the DP using power generator locally – to 2nd stage test
At each DP - we will always supply fit the patch the leads, left curled up below the DP ready for ITS or 4th Utility to install their demarcation box, and make their patch
At the Comms Cab / Split panel - we will supply fit the patch the leads plugged in to the 1:4 Split panel – and leave them hanging out of the splitter tray inside the rack ready for ITS or 4th Utility to install their PIA patch panel
Our job is then deemed as complete - with 4th Utility or ITS then being responsible for patching and testing through, once the PIA has been completed
Please ensure the document is completed in full with photos of the patch leads in the comms cabinet and below the DP’s -
Number of Dwellings
Comms Cabinet Information
-
Comms Cabinet Number
-
Photograph of Comms Cabinet
System Information
-
Number of DP's
DP number and Test Information
-
DP Number
-
Number of Properties served
-
One test to be carried out per 8 way splitter
Test - Property Number
-
Test 1 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 2 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 3 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 4 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 5 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 6 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 7 - Property Number
-
Tested Type
-
Photographs at POE
-
Another test required?
-
Test 8 - Property Number
-
Tested Type
-
Photographs at POE
Sign Off
Sign Off
-
Additional Notes / Information
-
Has the installation been completed as per the job pack provided?
-
Notes
-
Photograph of red line drawing
-
Name
-
Completed Sign Off