Information
-
Site
-
Postcode:
-
Job Number Reference
-
Audit by:
-
Date of Walk Off:
SN / ASN Details
-
Spliced via SN?
-
SN Details
-
Photograph of SN (Closed Cab)
-
Photograph of SN (Open Cab)
-
Photograph of Splice Tray (before labelling)
-
Photograph of Splice Tray (after labelling)
-
Have you installed hydra cables / pig tails?
-
Photograph of hydra cables / pig tails installed
-
Spliced via ASN?
-
Photograph of closed ASN
-
Photograph of open ASN
-
Photograph of Splice Tray
-
Photograph of Splice Tray
Splicing Schedule
-
What fibre has been spliced?
-
Has splitter been installed?
-
Photograph of splitter
DP Details
-
Location of DP?
-
Photograph of DP
-
Photograph of DP internals
-
Has pre-con blown fibre been installed?
-
Please provide photograph of splicing
-
Have POE's been installed?
-
Photograph of POE (Internal)
Sign Off
Sign Off
-
Additional Notes / Information
-
Has the installation been completed as per the job pack provided?
-
Notes
-
Name
-
Completed Sign Off