Project Title :
-
Project No. :
-
Location :
-
Date of Inspection :
-
Vessel Name :
-
Weather :
-
Inspection Team :
Inspection Item
Means of Access
-
1. Provision of proper and safe access for vessel boarding and disembarking
-
2. Ensure all edges of vessel are properly and fully fenced off to prevent person falling into the sea
-
3. Provide efficient lighting at all means of access and egress
-
4. Maintain free from obstruction at the means of access and egress
Training
-
1. Ensure all workers on board with valid blue cards
-
2. Ensure the marine safety supervisor is qualified and available on each vessel
-
3. Shipboard crane lifting operation must be operated by a person with a shipboard crane operators’ certificate
-
4. Ensure all personnel to complete the project specific safety induction before on board
-
5. Regular toolbox talks are maintained
Marine Vessel
-
1. Ensure the vessel is properly licensed with all validity certificates
-
2. Ensure all navigation signals are functioning properly
-
3. Ensure the vessel is loaded within the safe loading capacity
-
4. Barriers and warning notice are provided on vessel to prevent any trespasser
-
5. Provision of adequate lateral clearance from adjacent vessel(s) while in operation
-
6. No excessive dark smoke emission from vessel, (No darker than Shade 2 of Ringelmann Chart)
Working Environment
-
1. Ensure that workplace is safe, tidy and free from obstruction.
-
2. Ensure all loose items are stacked properly and lashed securely
-
3. Ensure all enclosures or trunkings are in good working condition
-
4. Ensure the vessel is securely moored and berthed while performing operation
-
5. Ensure the mobile equipment/plants are fixed and anchored securely
-
6. Ensure no works over water under adverse weather condition
Fire Prevention & Emergency Facilities
-
1. Ensure all flammable substances are properly handled, stored and marked with labels
-
2. Ensure storage of diesel drums with reasonable distance from any heat source
-
3. Provide appropriate fire extinguisher on board as per the license and in workable condition
-
4. Provide and maintain the first aid box is checked and replenished regularly
-
5. Provision of mobile phone or VHF radio (if necessary) on board for emergency call
-
6. Rescue boat is available at work location
-
7. Stretcher is available on vessel
-
8. Provide and maintain a fog audible alarm and lighting signal
-
9. Provide sufficient buoys with 30m lanyard
-
10. Ensure the buoy and the rope capsule in good working condition and maintain ease to reach
-
11. Display emergency procedure, list of phones contact and all safety information at conspicuous place
-
12. Ensure a proper chemical sorbents spill kit is available on vessel
-
13. Perform emergency drill is scheduled
Electricity
-
1. Ensure all electric cables and equipment are of waterproof type and well insulated
-
2. Ensure all electric panel boxes are of waterproof types and locked
-
3. Ensure all electric appliances are properly earthed and provide all electrical installation with leakage circuit breaker to electrical system
-
4. Display circuit diagram, REW information and warning label on each distribution board properly
-
5. Ensure all electric panel boxes and installation are checked by REW at bi-monthly basis
Personal Protective Equipment
-
1. Ensure everyone to wear safety helmets, gloves, safety shoes and lifejacket throughout the voyage
-
2. Ensure all PPEs are in good condition and no expired
-
3. Ensure all lifejackets are serviced by authorized agent/manufacturer at least once a year
-
4. Provision of Ear Protection Zone for workers at noisy area and provide workers with ear plugs
-
5. Provide and ensure workers to wear safety harness at height
-
6. Ensure additional PPE is provided as per the requirements from risk assessment
Machinery
-
1. Provide and maintain machine and moving parts with safety guards
-
2. Maintain insulation to hot exhaust gas pipes
-
3. Clear annotation and labelling for the control panel and all information clearly marked
-
4. All drilling machines have been examined by RPE and relevant valid certificates are available on board
-
5. All drilling rods are stacked in rack and wedged securely and properly
-
6. The S.W.L. is permanently marked on machines and winches
Lifting Appliances and Lifting Gear
-
1. Keep all the LALG with valid test certificates and color-coded
-
2. Ensure all lifting appliances and drilling rig/equipment are operated by qualified operators
-
3. Ensure all lifting appliances to mark clearly with SWL indication
-
4. Ensure all shackles and pins securely threaded with safety loop to avoid dislodge
-
5. Ensure that Form 1 (F&IU) for LA is duly competed weekly
-
6. Provision of logbook for LALG and signed by Competent person
Hand Tools
-
1. Provide good housekeeping of hand tools in work
-
2. Provide regular check and inspection on condition of hand tools
-
3. Stop and remove any defective hand tool in work
Chemical Waste
-
1. Provide proper storage/ container for any chemical waste/ material
-
2. Ensure all chemical wastes/ storage are clearly marked or displayed.
General
-
1. Provide adequate lighting any time in work and make sure no interference in any course of navigation
-
2. Ensure that the permit to work system is functioning and valid in work
-
3. Provide adequate welfare facilities on board such as toilet, drinking water and washing tank
-
4. Ensure no alcoholic drink and drug be allowed in work
-
5. Underground utilities and cables are identified and clear off from drill alignment
-
6. Provision of risk assessment and method statement for the operation
Recommendation
-
undefined
Information of Personnel :
-
Prepared By (Name & Position) :
-
Date :
-
Reviewed By (Name & Position) :
-
Date :